400-series highways

From Vero - Wikipedia
Jump to navigation Jump to search

Template:Short description Template:Distinguish Template:For Template:Use mdy dates Template:Featured list Template:Infobox state highway system The 400-series highways are a network of controlled-access highways in the Canadian province of Ontario, forming a special subset of the provincial highway system. They are analogous to the Interstate Highway System in the United States or the Autoroute system of neighbouring Quebec, and are regulated by the Ministry of Transportation of Ontario (MTO). The 400-series designations were introduced in 1952, although Ontario had been constructing divided highways for two decades prior. Initially, only Highways 400, 401 and 402 were numbered; other designations followed in the subsequent decades. To this day, not all controlled-access highways in Ontario are a part of the 400-series highway network. The network is situated almost entirely in Southern Ontario, although Highway 400 extends into the more remote northern portion of the province.

Modern 400-series highways have high design standards, speed limits of Template:Convert, with a Template:Convert limit on select stretches, and various collision avoidance and traffic management systems. The design of 400-series highways has set the precedent for a number of innovations used throughout North America, including the parclo interchange and a modified Jersey barrier design known as the Ontario Tall Wall. As a result, they currently experience one of the lowest accident and fatality rates comparative to traffic volume in North America.

Template:TOC limit

History

When the 400-series designations were first applied to Ontario freeways in 1952,<ref name="series400">Template:Cite news</ref> several divided highways had already been opened in Southern Ontario.<ref name="1953map">Template:Cite map</ref> Originally inspired by German Autobahns, Minister of Highways Thomas McQuesten planned a network of "Dual Highways" across the southern half of the province during the 1930s.<ref>Template:Cite news</ref>Template:Sfnp The Queen Elizabeth Way (QEW) was first, an upgrade to the partially constructed Middle Road in 1934.<ref name="globeandmail">Template:Cite news</ref> McQuesten also sought out the economic opportunities that came with linking Toronto to Detroit and New York state by divided roadways with interchanges at major crossroads. Although he no longer served as Minister of Highways by the onset of World War II, his ambitious plans would come to fruition in the following decades as Highways 400, 401, 402, 403 (between Woodstock and Hamilton), and 405.Template:Sfnp

The construction boom following the war resulted in many new freeway construction projects in the province. The Toronto–Barrie Highway (Highway 400), Trans-Provincial Highway (Highway 401),<ref name="JShragge">Template:Cite web</ref> a short expansion of Highway 7 approaching the Blue Water Bridge in Sarnia (Highway 402),<ref name="Christina heritage">Template:Cite book</ref> and an expansion of Highway 27 (eventually designated as Highway 427 by the mid-1970s) into part of the Toronto Bypass were all underway or completed by the early 1950s.<ref name="JShragge" /> Seeking a way to distinguish the controlled-access freeways from the existing two-lane King's Highways, the Department of Highways created the 400-series designations in 1952. By the end of the year, Highway 400, 401, and 402 were numbered, although they were only short stubs of their current lengths.<ref name="series400" /> Highway 401 was assembled across the province in a patchwork fashion,<ref name="JShragge" /> becoming fully navigable between Windsor and the Quebec border on November 10, 1964;<ref name="openDates">Template:Harvp.</ref> Highway 400 was extended north to Coldwater on Christmas Eve 1959;<ref>Template:Cite news</ref> Highway 402 was extended to London between 1972 and 1982.<ref name="begin">Template:Cite book</ref><ref name="ceremony">Template:Cite book</ref>

In addition to this network backbone, plans for additional 400-series highways were initiated by the late 1950s, comprising the Chedoke Expressway (Highway 403) through Hamilton;<ref name="planning">Template:Cite book</ref> the Don Valley Parkway Extension (Highway 404) northward from the soon-to-be constructed Toronto expressway;<ref name="plan">Template:Cite book</ref> Highway 405 to connect with the American border near St. Catharines;<ref>Template:Cite news</ref> Highway 406 south from St. Catharines to Welland;<ref>Template:Cite book</ref> Highway 407 encircling the Greater Toronto Area (GTA), though not built for another 40 years;<ref name="suburbs">Template:Cite book</ref> Highway 409 to connect Highway 401 with Toronto International Airport;<ref>Template:Cite book</ref> and The Queensway (Highway 417) through Ottawa.<ref>Template:Cite web</ref> The first sections of these freeways were opened in 1963,Template:Sfnp 1977,<ref name="1976report">Template:Cite book</ref> 1963,Template:Sfnp 1965,Template:Sfnp 1997,<ref name="407dates">Template:Cite book</ref> 1974,<ref>Template:Cite book</ref> and 1960,<ref name="gloucester">Template:Cite book</ref> respectively.

Throughout the 1960s and 1970s, additional freeways were planned or built, including Highway 427 in Toronto,<ref name="assumed427"/> Highway 403 through Mississauga,<ref>Template:Cite news</ref> Highway 410 north to Brampton and Highway 416 to connect Highways 401 and 417.<ref name="teh">Template:Cite book</ref><ref>Template:Cite news</ref> Highway 420 was designated in Niagara Falls,<ref name="series400" /><ref>Template:Cite book</ref> though it had been built as part of the QEW in 1941.Template:Sfnp Other major works included the skyway bridges along the QEW and the expansion of Highway 401 through most of Toronto into twelve-lane collector–express systems.<ref name="JShragge" />Template:Sfnp<ref>Template:Cite book</ref>

By the mid-1980s, the network had more-or-less taken its current shape, with only Highways 407, 412, 416 and 418 yet to be built.<ref>Template:Cite map</ref><ref name="2014map">Template:Cite map</ref> Instead, emphasis was placed on expanding existing routes to accommodate increasing traffic volumes.<ref name="suburbs" /> However, extensions of Highway 400 towards Parry Sound,<ref name="PStoPS">Template:Cite web</ref> Highway 403 between Woodstock and Hamilton,<ref name="1989c">Template:Cite journal</ref> Highway 404 towards Newmarket,<ref name="Davis">Template:Cite news</ref> and Highway 427 towards Vaughan were underway.<ref>Template:Cite book</ref> By the end of the decade, construction of Highway 407 and Highway 416 had begun,<ref name="suburbs" /><ref>Template:Cite book</ref> and Highway 410 was expanded from two to four lanes.<ref>Template:Cite journal</ref>

Highways 407 and 416 opened in the late 1990s.<ref name="407dates" /><ref name="opened416"/> Until early 2015, Highways 407 and 416 were the most-recently designated (and constructed) freeways in Ontario. This has changed with the construction of Highways 412 and 418. In addition to these new additions to the 400-series network, several extensions of existing freeways have been built or are underway,<ref name="2014map" /> including Highway 410 north of Brampton in 2009,<ref>Template:Cite news</ref> Highway 400 to north of Parry Sound in 2010,<ref name="nobel">Template:Cite news</ref> Highway 417 to Arnprior in 2012,<ref name="Arnprior">Template:Cite news</ref> Highway 404 to Keswick in 2014,<ref>Template:Cite news</ref> Highway 401 through Windsor in 2015,<ref>Template:Cite news</ref> and four-laning Highway 406 to Welland in late 2015.<ref>Template:Cite news</ref>

Design standards

The 400-series highways always have a minimum 4 lane cross-section with grade separation at all junctions. Interchanges tend to be spaced at least 1.5 kilometres apart in urban areas unless there are basket weave ramps or collector lanes to facilitate shorter merge distances. In rural areas, interchanges tend to be spaced at least 3 kilometres apart, although exceptions exist. When the cross-section of highway is larger than 10 lanes, the road is usually arranged into a local–express lane system, which exist on sections of Highways 400, 401, 403, 404 and 427. On all but a few interchanges in the whole system, ramps merge freely on the highway except if there are ramp meters in use, and stop or yield controlled ramps are rare. An interchange with stop-controlled ramps onto Highway 400 at Canal Road is currently scheduled for replacement.

While older freeways have some lapses in safety features, contemporary 400-series highways have design speeds of Template:Convert, speed limits ranging from Template:Convert to Template:Convert, various collision avoidance and traffic management systems, and several design standards adopted throughout North America.<ref>Template:Cite news</ref> Of note are the Ontario Tall Wall median barrier and the Parclo A-4 interchange design, the latter which became standard in the design for the widening of Highway 401 through Toronto in 1962. The Institute of Traffic Engineers subsequently recommended this design to replace the cloverleaf interchange throughout North America.<ref>Template:Cite book</ref><ref>Template:Cite web</ref> Ontario highways rank fourth in North America for fatality rates, with 0.61 fatalities per 10,000 licensed drivers in 2017. However, this also includes two-lane provincial highways.<ref>Template:Cite book</ref> On May 1, 2019, the government of Ontario was looking towards raising the speed limits of the 400-series highways up to Template:Convert Jeff Yurek, Transportation Minister at that time had stated that "The 400-series highways were built for, I believe, a speed limit of 120 km/h safely."<ref>Template:Cite web</ref> A Template:Convert trial was set up on three stretches of highways on September 26, 2019, to test the viability of increasing speed limits.<ref>Template:Cite web</ref> The three trialed sections along with three more sections were permanently changed to the higher speed limit on April 22, 2022, and two more sections were trialed.<ref>Template:Cite press release</ref> The two trialed sections were made permanent along with 10 more sections on July 12, 2024.<ref>Template:Cite web</ref><ref>Template:Cite press release</ref> On October 2, 2024, Premier Doug Ford mentioned in a press conference that he had directed Transportation Minister Prabmeet Sarkaria to raise the speed limit on all remaining 400-series highway sections “where it is safe to do so”.<ref>Template:Cite web</ref>

Conforming with the Manual on Uniform Traffic Control Devices, Ontario utilizes green signs for guidance purposes, including distances to nearby interchanges and destinations.<ref name="OTM8">Template:Cite web</ref> Generally, blue signage is used to list services and attractions at upcoming exits, known as Tourism-Oriented Directional Signing.<ref>Template:Cite web</ref> However, several exceptions exist, notably blue guidance signage for toll highways such as Highway 407, in addition to the collector lanes of highways.<ref name="OTM8" /> The baseline standard for the construction of or expansion to a freeway in Ontario is an average daily traffic count of 10,000 vehicles per day. However, other factors are considered as well, particularly future traffic volume forecasts. To promote economic development in a disadvantaged region (e.g., the current extension of Highway 400 to Northern Ontario), a 400-series highway may be built where the existing highway's traffic counts fall below 10,000.<ref>Template:Cite book</ref>

The MTO plans and finances the construction and maintenance of the King's Highway system, which includes the 400-series network.<ref>Template:Cite web</ref> The system includes Template:Convert of freeways. Highway 401 is the longest freeway at Template:Convert, in addition to being the widest and busiest road in Canada. Highway 420 is the shortest of the routes at Template:Convert.<ref name="km" />

There are four examples of 400 series standard highways in Ontario that are not signed as such. The Gardiner Expressway between Highway 427 and Parklawn Road was originally built as a section of QEW (Hwy 451<ref>Template:Cite web</ref>) and therefore is built to 400-series standards but lost its QEW designation after being downloaded to the City of Toronto. The section of Highway 7 between the town of Carleton Place and its junction with Highway 417 is also built to 400-series standards, but a 400-series designation has yet to be applied. Highway 69 between Sudbury and Key River is built to 400-series standards in anticipation of it becoming part of Highway 400 once the Template:Convert gap between the two freeways is filled. Highway 115 north of Highway 35/Highway115 concurrency and Peterborough is also built to 400-series standards, however a 400-series designation has yet to be applied. Most other freeways and expressways in Ontario that lack a 400-series designation have lower construction standards, lower design speeds and lower speed limits.

High-occupancy vehicle lanes

Map showing locations of HOV lanes in the province as of September 2021

The MTO began planning for the use of high-occupancy vehicle (HOV) lanes with the HOV Opportunities Study, contracted to McCormick Rankin in 2001. This led to the test trial of three HOV lanes in the GTA in December 2005: southbound Highway 404 between Highway 7 and Highway 401, with a dedicated HOV ramp built to connect with westbound Highway 401, and Highway 403 in both directions between Highway 407 and Highway 401 in Mississauga.<ref>Template:Cite book</ref> Since then, HOV lanes have been opened on several 400-series freeways around the Golden Horseshoe and National Capital Region. In May 2007, the MTO introduced a multibillion-dollar Horseshoe Network Project, which included plans to incorporate HOV lanes into numerous 400-series highways.<ref name="hovplan">Template:Cite press release</ref>

By then, work was already advanced on several projects, including the northbound HOV lane on Highway 404 (that opened on July 23, 2007) and an HOV lane along both directions of Highway 403 between Highway 407 and Highway 401. A third pair of HOV lanes has since been introduced to the QEW/403 through Oakville, and a fourth individual HOV lane travels eastbound on Highway 417 from just west of Eagleson Road in Ottawa to just east of Moodie Drive.<ref name="hovplan" />

More than Template:Convert of HOV lanes are currently proposed for construction by 2040. Future plans include extending existing HOV lanes and introducing them to other 400-series freeways.<ref name="mto">Template:Cite web</ref> Template:As of, two projects have been confirmed: Highway 410 between Highway 401 and Queen Street in Brampton, and Highway 427 between Highway 409 and Highway 7. The MTO has stated that HOV lanes will only be introduced through new construction and that no general-purpose lanes will be converted. The general goals of the project are to help increase highway efficiency (an HOV lane is claimed by the Ontario government to have the ability to move as many people as four general-purpose lanes),<ref name="mto"/> reduce congestion, conserve energy and help protect the environment.<ref>Template:Cite web</ref>

During the 2015 Pan American Games and 2015 Parapan American Games held in Toronto, several HOV lanes had their minimum requirements increased from two passengers to three, and some highways had their general-purpose lanes temporarily converted to HOV lanes to accommodate increased traffic. These temporary restrictions lasted from June 29 to August 18.<ref>Template:Cite news</ref>

2021 saw several new HOV lanes opened. The southbound HOV lane on HighwayTemplate:Nbsp400 between King Road and Major Mackenzie Drive was opened on SeptemberTemplate:Nbsp11, 2021; while the northbound lane opened two months later on NovemberTemplate:Nbsp11. The HighwayTemplate:Nbsp427 extension, which opened on SeptemberTemplate:Nbsp18, included an HOV lane north of Finch Avenue.<ref>Template:Cite web</ref><ref>Template:Cite tweet</ref><ref>Template:Cite news</ref><ref>Template:Cite tweet</ref>

Future HOV lanes

The following table lists planned expansions to the HOV network by 2040.<ref name="mto" /><ref name="hwyprogram">Template:Cite web</ref>

Near-term (anticipated completion by 2025)
Highway Starting location Terminating location General location Status
400 King Road Highway 9 Region of York Lane construction underway, expected completion, 2025
Long-term (2025–)
Highway Starting location Terminating location General location
400 Langstaff Road Major Mackenzie Drive Regional Municipality of York
400 Highway 9 Highway 88/Bradford West Gwillimbury Region of York and Simcoe County
401 Regional Road 25 Halton-Wellington Boundary Regional Municipality of Halton
401 Highway 6 South, Brock Road Highway 6 North Wellington County and Guelph
401 Townline Road Wellington Road 32 Wellington County and Cambridge
404 Stouffville Road Ravenshoe Road Region of York
QEW Red Hill Valley Parkway Highway 406 Hamilton and Region of Niagara
QEW 407/403 Guelph Line Burlington
QEW Trafalgar Road Highway 427 Oakville and Mississauga

Planned extensions and new routes

Template:Sticky header

Highway Type Length (km) Length (mi) Southern or western terminus Northern or eastern terminus Status Proposed Opening Date Notes
Highway 400 Extension<ref>Template:Cite web</ref> ~138 ~86 Highway 559 near Parry Sound Highway 17 in Sudbury Partially Open / Under Construction Late 2020s Completed sections numbered as Highway 69
Highway 401 Extension<ref>Template:Cite web</ref> ~3 ~2 I-75 in Detroit Ojibway Parkway in Windsor Unopened 2025 Part of Gordie Howe International Bridge Project
Highway 404 Extension<ref>Template:Cite web</ref> ~31 ~19 Regional Road 8 in Keswick Highway 12 north of Sunderland Proposed Late 2020s
Highway 410 Extension<ref name=":0">Template:Cite web</ref> ~3 ~2 Highway 10 in Brampton Future Highway 413 north of Brampton Funded Late 2020s Part of the Highway 413 project
Highway 413 New Route<ref name=":0" /> ~52 ~32 Highway 401 and Highway 407 in NW Mississauga Highway 400 north of Vaughan Funded Late 2020s
Highway 417 Extension<ref>Template:Cite web</ref> ~16 ~10 Highway 60 in Renfrew Campbell Drive west of Arnprior Proposed Late 2020s
Highway 427 Extension<ref name=":0" /> ~2 ~2 Regional Road 25 south of Bolton Future Highway 413 South of Bolton Funded Late 2020s Part of the Highway 413 project
"Bradford Bypass" New Route<ref>Template:Cite web</ref> ~16 ~10 Highway 400 near Bradford Highway 404 south of Keswick Funded Late 2020s Intended to be a 400 series standard highway, designation is unclear. Construction began at the Yonge Street interchange in November 2022

Existing network

Template:Routelist top Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist row Template:Routelist bottom Template:Clear

See also

References

Sources

Template:Reflist

Bibliography

Template:Refbegin

Template:Refend

Template:Commons category

Template:Ontario Controlled Access Highways