British Rail Class 458

From Vero - Wikipedia
Jump to navigation Jump to search

Template:Short description Template:Good article Template:Use British English Template:Use dmy dates Template:Infobox train

The British Rail Class 458 Juniper (4-JOP later 5-JUP) is a class of electric multiple-unit passenger trains of the Alstom Coradia Juniper family, built at Washwood Heath between 1998 and 2002 for South West Trains.<ref>Template:Cite magazine</ref> The order for the original fleet of 30 four-car trains was placed in 1997, and delivery of the first unit followed in October 1998.<ref name=":0">Template:Cite web</ref> The fleet entered passenger service between 2000 and 2003 and is maintained at Bournemouth depot.<ref name="RailwaysIllustrated259"/><ref>Template:Cite magazine</ref>

Between 2013 and 2016, the class was merged with the mechanically similar Class 460 fleet and extensively rebuilt to form a fleet of 36 five-car units—designated Class 458/5—to provide an increase in capacity on services into Template:Stnlnk.<ref>Template:Cite book</ref> The trains are now used by South Western Railway.<ref>Template:Cite magazine</ref>

In March 2021, South Western Railway announced that 28 Class 458 units would be refurbished for use on long-distance services on the Portsmouth Direct line, as a result of the company deciding to abandon its original plan to use upgraded Class 442 units for this purpose.<ref name="abandon">Template:Cite magazine</ref> By 2024, this plan had been dropped, and the refurbished units were instead deployed on limited services out of London Waterloo from 24 June 2024.

History

South West Trains began operating the South Western franchise in February 1996, having inherited all of its rolling stock from British Rail. While this included a small number of trains built in the late 1980s and a larger number of suburban units delivered between 1982 and 1985, a significant proportion of the overall fleet was formed by much older slam-door First Generation EMUs, such as Classes Template:Brc and Template:Brc. In order to begin replacing these older units, SWT issued in November 1996 a request for tenders to supply 30 new air-conditioned four-car EMUs, and in 1997 together with rolling stock lessor Porterbrook awarded to Alstom a £90 million contract for their delivery.<ref name=":0" /><ref name="bbc" />

Some railway industry commentators noted that SWT were going above and beyond the requirements of their franchise award in placing the order, and speculated that it could be a strategy to allay concerns about the fact that the same company—Stagecoach Group—owned both South West Trains and Porterbrook.<ref name="Ju" /> This represented a potential conflict of interest at a time when rolling stock leasing companies, and Porterbrook in particular, were being criticised for extracting significant profits from leasing cheaply-acquired ex-BR stock.<ref name="laugh">Template:Cite news</ref>

File:Hugh llewelyn (45)8021 (6336760961).jpg
A Class 458/0 unit in as-delivered condition, showing the original driver's cab and SWT livery

All 30 units, numbered 458001–458030, were fitted out at the former Metro-Cammell works at Washwood Heath in Birmingham, which Alstom had acquired in 1989, with the bodyshells being built in Barcelona, Spain.<ref name="Factory"/><ref>Template:Cite magazine</ref> Each unit was formed of two motor cars with driver's cabs, an intermediate trailer car, and an intermediate motor car. Both driving cars had small sections of first-class seating, while the intermediate cars were all standard class. The trailer car was provided with a pantograph well and space for an alternating-current transformer, enabling conversion to Template:25 kV 50 Hz overhead-line operation if required at a later date.<ref name="Ju">Template:Cite web</ref> One bogie on each motor car was fitted with traction motors, for a total of 6 motors along the train, a maximum speed of Template:Convert, and a cumulative power output of Template:Convert.<ref name=Ju/> Both driving cars were also provided with end gangways, with the intent of allowing passengers and crew to move between coupled units. They are the only members of the Juniper family to have such provision.<ref name=Ju/>

The first unit, 458001, was delivered to SWT for pre-acceptance testing on 31 October 1998.<ref name="fast" /> Attempts to place the new class into passenger service were beset by delays and major technical problems. The roofs of the new trains leaked, allowing water ingress to both the driver's cabs and passenger saloons. Onboard electronics repeatedly failed, affecting the air-conditioning and traction systems, and the Train Management System (TMS) software also proved to be unreliable.<ref name=Ju/><ref name=bbc/> More problems were encountered in coupling process and the design of the end gangwaysTemplate:Sndexisting practice with ex-BR stock taught that units could be coupled or uncoupled in the space of just a few minutes, but the Juniper gangway design was significantly more complex and took far longer to operate. Additionally, the entire TMS had to be restarted whenever units were coupled and uncoupled, which meant that the total time taken to couple or uncouple Class 458 units could reach up to 30 minutes. Both of these facts in particular remained considerable limitations on the use of the new fleet; ultimately SWT had no choice but to treat the Junipers as being semi-permanently coupled in pairs.<ref name=":2">Template:Cite web</ref> The first Class 458 passenger service eventually ran on 25 February 2000, but even then only two units (458004 and 458005) were available for use.<ref name=Ju/>

File:458015 A First Class Interior 1.JPG
The original first-class interior of a Class 458/0 unit

By March 2002 twenty-four of the thirty units had been delivered, but on an average day only nine to ten units were actually available for service.<ref name="bbc-old">Template:Cite news</ref> The last six units eventually arrived by October 2002, but it was another seven months—May 2003—before the entire fleet had entered service.<ref name=Ju/> The protracted and difficult introduction of the Juniper fleet is credited with influencing SWT's decision in April 2001 to replace the rest of its slam-door units with an order of 785 vehicles from the competing Siemens Desiro family.<ref name=":2" /><ref>Template:Cite web</ref>

Withdrawal from service

Even after the full complement of units had entered service, reliability remained so poor that in January 2004 South West Trains announced that they would withdraw the entire Class 458 fleet at the December 2005 timetable change in readiness to return them to lessor Porterbrook when the lease on the fleet expired in February 2006.<ref name="bbc">Template:Cite news</ref> At the time of the announcement the trains were only managing an average of Template:Convert between major failures, whereas the new Siemens Desiro (Template:Brc) units—which had only entered service in October 2003—were already achieving an average of Template:Convert between faults, and the slam-door fleet had regularly managed intervals of circa Template:Convert.<ref name="bbc" />

An additional 17 Class 450 units had been ordered to replace the Class 458 fleet, but as these new units would not be delivered for some time yet Porterbrook later agreed with SWT that the Junipers could stay in service on a pay-per-use basis past the original end of the lease. In a separate arrangement units 458001 and 458002 were transferred to Gatwick Express in September 2005 to act as a spare train for that operator, but they were returned to SWT in December 2006 without having been used.<ref>Gatwick Express 458s Template:Webarchive – Southern Electric Group. Retrieved 26 December 2010.</ref>

In addition to reliability problems, continued use of the Class 458 fleet was complicated by issues surrounding compliance with the Rail Vehicle Accessibility Regulations (RVAR) 1998. The Regulations, which mandate the accessibility features that vehicle designers and operators need to provide in order to meet the requirements of the Disability Discrimination Act 1995, were in the process of being formulated at the same time as the Class 458 fleet was being designed and the finished units accordingly received temporary exemptions from compliance on a total of 10 different points.<ref name="1999/2404">Template:Cite legislation UK</ref><ref name="2004/2149-exmem">Template:Cite web</ref> The exemption relating to the size of the internal passenger information displays expired on 31 July 2006—having already been extended from 30 September 2004—and the Department for Transport declined to provide any further extension.<ref name="1999/2404" /><ref name="2004/2149">Template:Cite legislation UK</ref> SWT fitted replacement displays of a compliant size to eight units for use as stand-by stock, while the remainder of the fleet was placed in storage.<ref name=":1">Template:Cite journal</ref>

Return to service

In September 2006 the Department for Transport confirmed after a competitive tender process that South West Trains had been awarded a new ten-year contract to operate the South Western franchise, starting in February 2007.<ref name="2007award">Template:Cite news</ref> As a result of the award, and in keeping with commitments made in its tender, SWT implemented a new rolling-stock plan that called for the withdrawal of its 24 Template:Brc units. Class Template:Brc and 450 units would take over the affected services, and the resulting gaps covered by re-activating the Class 458 fleet.<ref name=":1" /> There was some speculation from industry observers that this was made possible by Porterbrook significantly reducing the amount of money it charged SWT to lease the Junipers, given that there appeared to be no other operators interested in using the fleet.<ref name=":1" />

Following the December 2006 timetable change, the stored Class 458 units began to return to service, and the Class 442 withdrawal was completed on 24 January 2007.<ref name=":1" /> By the end of the following February, observers reported that only four Junipers had not yet been re-activated,<ref name="Ju" /> and that the general reliability of the fleet had improved so much that units now averaged Template:Convert between significant failures (defined as causing delays greater than five minutes).<ref name=":1" />

The re-activation process included the fitting of RVAR-compliant internal displays to the entire fleet. The other points of RVAR non-compliance were covered by existing exemptions that remained valid until 31 December 2010.<ref name="2002/656">Template:Cite legislation UK</ref>

Refresh and reliability improvements

Between 2008 and 2010 the fleet was 'refreshed' at Bournemouth Traincare Depot, during which process the units were fitted with CCTV, new seats and tables in first class, and modified RVAR-compliant lavatories and doorway lights. The interiors were also cleaned and repainted.<ref name="Bournemouth">Class 458s being "refreshed" at Bournemouth T&RSMD Template:Webarchive – Southern Electric Group. Retrieved 21 May 2011.</ref>

In May 2010, SWT enabled regenerative braking on two Class 458 units as part of trial testing its potential use across both the Juniper and Desiro fleets. The trials were successful and regenerative braking was enabled across all 30 Class 458 units by mid-2011.<ref>Template:Cite press release</ref>

By the end of 2012 the fleet was achieving an average distance of Template:Convert between significant failures; making it the most reliable fleet in Britain and the first to achieve 6-figure mileages.<ref name="MR201301p64">Template:Cite magazine</ref> The feat was recognised with a Modern Railways magazine Golden Spanner award in the New Generation EMU category on 23 November 2012.<ref>Template:Cite magazine</ref>

Conversion to Class 458/5

South West Trains had experienced a considerable shortage of passenger capacity on many of its suburban routes in the years up to 2012, which it attributed primarily to the fact that passenger numbers had increased dramatically without a corresponding rise in the size of the operator's fleet.<ref name=":3" /> The company had suggested to the Department for Transport on at least three occasions that more Template:Brc units should be purchased from Siemens, but had been turned down each time.<ref name="rtm-ashley">Template:Cite magazine</ref>

As an alternative, Porterbrook proposed to enlarge the Class 458 fleet and reconfigure it for suburban services by using vehicles from the Template:Brc fleet, which Porterbrook also owned and which was at that time being released from service with Gatwick Express.<ref name=":3">Template:Cite news</ref><ref name="Rail20120125p28">Template:Cite magazine</ref> The process, budgeted at £42 million, would allow for all 30 original Class 458 units to be extended by one vehicle, making them into five-car units, after which there would be six five-car Class 460 units left over. These would be comprehensively rebuilt to match the extended Class 458 units, for a total fleet of 36 five-car units that would be designated Class 458/5.<ref name="MR201202p40">Template:Cite magazine</ref> The units of this "new" fleet would be used—either individually or in pairs of ten cars—to provide extra peak-time capacity on suburban services into Waterloo from the Hounslow, Weybridge (via Staines), and Windsor lines. A separate improvements package agreed between SWT and Network Rail provided for platform extensions necessary for ten-car operation at over 60 suburban stations, and for the re-opening of one of the four disused platforms at the former Waterloo International terminal.<ref name="Rail20120111p7">Template:Cite magazine</ref><ref name="SWT20111223">Template:Cite press release</ref><ref name="rtm-first">Template:Cite magazine</ref>

The Department for Transport announced in December 2011 that it had accepted the proposal,<ref name=":3" /> and an agreement between Porterbrook and South West Trains was signed in January 2012.<ref>Template:Cite press release</ref> South West Trains described the project as advancing its aspiration to become a "10-car railway",<ref name="MR201202p40"/> and the company's fleet director noted that while the project was "much more complicated ... than buying new trains", it was also "significantly cheaper".<ref name=":3" /><ref name="rtm-ashley" /> The primary contract for delivering the project was awarded to Alstom, who appointed Wabtec to perform the conversion work on its behalf.<ref name=":3" />

File:Doncaster railway station MMB 09 460004.jpg
Separated Class 460 vehicles at Doncaster Works prior to being rebuilt

All 48 intermediate vehicles from the Class 460 fleet were sent to Wabtec's Doncaster Works to be rebuilt and refitted. Twelve of the 16 driving vehicles were rebuilt by Wabtec subsidiary Brush Traction at its workshops in Loughborough, where their original driver's cabs were replaced with newly fabricated versions that included gangways and Voith automatic couplers of the same types used on Class 444 and 450 units.<ref name="transforming" /><ref name=":3" /><ref name="prepares" /> Four of the selected driving vehicles had been built with luggage compartments, and these were removed and their roller-shutter external doors were replaced with power-operated plug doors like those used on the other vehicles.<ref name="RG-SWT">Template:Cite web</ref> Together with 18 of the intermediate cars from the Class 460 vehicles, these became the six "new" Class 458/5 units. The remaining 30 Class 460 cars were prepared for insertion into the Class 458/0s.<ref name="transforming">Template:Cite news</ref>

File:South West Trains 458531 + 45853x, Clapham Junction (15464909774) crop.jpg
Two Class 458/5 units soon after being rebuilt. The continuous window band along the vehicle's side only appears on former Class 460 vehiclesTemplate:Sndoriginal Class 458 vehicles have windows separated by bodywork.

Additional modifications included re-gearing the traction motors to reduce the train's maximum speed from Template:Convert to Template:Convert, both to reduce the likelihood of overheating when making frequent stops and starts, and because the higher speed was unnecessary on suburban services.<ref name="rtm-ashley" /> New Train Management System (TMS) software was developed to be compatible across the entire Class 458/5 fleet, simplifying maintenance and improving reliability.<ref name=":3" /> An Automatic Selective Door Opening (ASDO) system was installed for use at a small number of stations where it was impractical to lengthen platforms.<ref name="MR201202p40"/> The vehicle interiors were refurbished and reconfigured to provide more standing room for passengers, mainly by changing from 5- to 4-abreast seating and thus allowing a wider aisle.<ref name="MR201202p40"/><ref name=":3" /> The units were also repainted into SWT's blue livery, matching the Class 450 fleet.

SWT expected to receive the first two Class 458/5 units in May 2013—in time for them to enter service the following November—but due to delays in production the initial delivery did not take place until October.<ref name="RG-SWT" /><ref name="prepares">Template:Cite magazine</ref> Following testing and staff training, entry into passenger service was achieved in March 2014.<ref name="Rail20120125p28"/><ref name="SWT20111223"/> Once the first four fully-converted units had been delivered and accepted for service, SWT was able to start sending original Class 458/0 units for rebuilding.<ref name="transforming" /> These units received the same modifications as the Class 460 conversions, leaving SWT and Porterbrook with a single mechanically homogenous Class 458/5 fleet. The last unmodified original units were withdrawn from service for rebuilding in November 2015, and returned to SWT after completion on 30 March 2016.<ref name=":1" />

At the conclusion of the conversion project four Class 460 vehicles—all of them driving cars with luggage compartments—were superfluous; these were stripped for spare parts and later scrapped.<ref name="booths">Template:Cite magazine</ref>

Conversion to Class 458/4

The South Western franchise was transferred from South West Trains to South Western Railway (a FirstGroup/MTR joint venture) in August 2017. Prior to commencing operations, SWR had taken advantage of low finance costs to order from Bombardier Transportation a new fleet of 750 vehicles—now designated Template:Brc—that would replace Classes Template:Brc, Template:Brc, 458, and Template:Brc on South Western suburban services from late 2019 onwards.<ref name="old-new">Template:Cite magazine</ref> However, continuing delays to the Class 701 programme kept all four older fleets in use into the 2020s.<ref>Template:Cite magazine</ref><ref>Template:Cite magazine</ref>

South Western Railway had plans to use refurbished Template:Brc units for long-distance services to and from London on the Portsmouth Direct line. However, in March 2021, the operator announced its decision to abandon these plans, citing continuing technical difficulties and future problems complying with accessibility regulations. To make up for the shortfall, 28 Class 458 units have been refurbished and were planned to be redeployed in their place.<ref name="abandon"/> The refurbishment was performed by Alstom at Widnes in Cheshire at a cost of £25 million and involved returning each unit to its original four-car formation by removing the Class 460 vehicles, restoring the original maximum speed of Template:Convert, and reconfiguration of the passenger saloons.<ref name="grr">Template:Cite news</ref> The reconfigured units will be leased from Porterbrook until 2027 at the earliest and are maintained at Bournemouth Traction and Rolling Stock Maintenance Depot.<ref name="RailwaysIllustrated259"/><ref name="rt-selects">Template:Cite news</ref><ref name="advent">Template:Cite news</ref> The first two units to be sent for refurbishment, 458507 and 458517, arrived at Widnes by mid-August 2022.<ref>Template:Cite magazine</ref>

Testing for the 458/4s began on 9 October 2023.<ref>Template:Cite magazine</ref>

In early 2024 it was announced that the plan to use the Class 458/4s on Portsmouth services had been dropped.<ref name="MR905">Template:Cite magazine</ref><ref>Template:Cite magazine</ref> Later in May 2024, it was announced that the Class 458/4s would instead be used on some limited outer suburban services from London Waterloo.<ref name="RE337">Template:Cite magazine</ref> The first Class 458/4 entered service on 24 June 2024,<ref name="458/4entrytoservice">Template:Cite web</ref> with the entire converted fleet in service by May 2025.<ref name="RE341">Template:Cite magazine</ref><ref name="RE350">Template:Cite magazine</ref>

The 458/4 conversion and refurbishment was completed on 12 December 2024.<ref name="complete">Template:Cite magazine</ref> Scrapping of the redundant ex-Class 460 vehicles started in January 2025.<ref>Template:Cite magazine</ref>

Incidents

Fleet details

Class Operator Qty. Year built Year converted Cars per unit Unit nos. Notes
458/4 South Western Railway 28 1998–2002 2022–2024 4 458401–458428<ref name="TRUK276">Template:Cite magazine</ref> Converted from Class 458/5s by removing the Class 460 intermediate vehicle.<ref>Template:Cite magazine</ref><ref>Template:Cite web</ref>
458/5 1 2013–2016 5 458529<ref name="RE352">Template:Cite magazine</ref> Original fleet of four-car Class 458/0 units, extended to five cars by inserting a rebuilt Class 460 intermediate vehicle.
2 458533, 458535<ref name="RE352"/> Converted from Template:Brc units.<ref name=":3" />
Stored 1 458530<ref name="RE352"/> Original fleet of four-car Class 458/0 units, extended to five cars by inserting a rebuilt Class 460 intermediate vehicle.
4 458531–458532, 458534, 458536<ref name="RE352"/><ref>Template:Cite magazine</ref> Converted from Template:Brc units.<ref name=":3" />

Notes

Template:Notelist

References

Template:Reflist

Further reading

Template:Commons category

Template:Coradia/Juniper {{#invoke:Navbox|navbox}}