Cardiff Queen Street railway station

From Vero - Wikipedia
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Template:Use British English Template:Infobox station Cardiff Queen Street railway station (Template:Langx) is a railway station serving the north and east of Central Cardiff, Wales. It is the fourth busiest railway station in Wales. It is located near the major thoroughfare of Queen Street and is one of 20 stations in the city. Along with Cardiff Central, it is one of the two major hubs of the Valleys & Cardiff Local Routes local rail network. The station and its services are run by Transport for Wales.

In 2014, a reconstruction of the station was completed in order to reduce bottlenecks. Two extra platforms were put in (a previously existing platform, opposite platform 4, and a new platform next to platform 2 for the line to Template:Stnlnk), taking the total number of platforms to 5.

History

Early history

File:Cardiff-queen-street-station-1966.jpg
The station frontage seen in 1966

The first station close to the current site was opened by the Taff Vale Railway in October 1840 and was known as Cardiff Taff Vale. This station initially had one platform; a second was added in 1862 and, at the same time, the head office of the Taff Vale Railway was moved alongside the station. In 1887, Taff Vale station was demolished and replaced by a new station with the current name Cardiff Queen Street. At the time, it comprised two through platforms and a south facing bay, all covered by a large overall roof.<ref name="Walters">Template:Cite book</ref>

In 1858, the Rhymney Railway built its own terminus just to the east of Queen Street called Template:Rws. This was replaced in 1871 by a new station called Cardiff Crockherbtown, a short distance to the north-east of Queen Street. Crockherbtown station was renamed Cardiff (Rhymney) in 1888 and then Cardiff Parade in 1924.<ref name="Walters"/>

The Taff Vale and Rhymney railways became part of the Great Western Railway (GWR) in 1922. As there was no longer any need for two rival stations in close proximity, on 15 April 1928, the GWR opened a short connection just north of Queen Street connecting the Rhymney line to the Taff Vale line. This allowed Parade station to be closed and its services diverted to into Queen Street. To accommodate the extra Rhymney line services, Queen Street was enlarged from three to five platforms, with the addition of a new island platform.<ref name="Walters"/>

1973 rebuild

File:Cropped image of Cardiff Queen Street station geograph-3842590-by-Ben-Brooksbank.jpg
The station seen in 2001

The station remained fairly unaltered until 1973, when it was completely rebuilt by British Rail.<ref>Template:Cite book</ref> The station's overall roof was removed, the original Taff Vale station frontage and booking hall demolished and replaced with a modern structure, and the number of platforms reduced to three: a central island platform and a south facing bay. Modern electric lifts were installed to take passengers from the subway to the new platforms. On the east side of the station, a large office block called Brunel House was constructed; until 1984, it was the headquarters of the Cardiff division of British Rail's Western Region.<ref name="Walters" /><ref>"Cardiff Queen Street station gets its old platforms back as part of £220m rail improvement scheme" Template:WebarchiveUrban 75 Blog article 27 February 2014; Retrieved 24 March 2016</ref>

In 1988, the entrance building was refurbished. In March 1990, platform 3 was turned into a through platform.<ref name="Walters"/>

In 2005, the station was fitted with new ticket gates, operational when the station is staffed, which allow easier access in both directions. In 2006, LED screens replaced the old information display monitors.

The old station car park is now dedicated for private use by residents of a nearby modern apartment block, The Aspect.

2014 redevelopment

File:Gorsaf Heol y Frenhines, Caerdydd.JPG
The station seen after redevelopment in 2015

As part of a £220m regeneration scheme to boost train capacity in Cardiff and the surrounding areas, Cardiff Central and Cardiff Queen Street stations were redeveloped from April 2013 and June 2014 respectively. The Cardiff Area Signalling Renewal project was completed by early 2017, funded by the UK Government's Department for Transport, Welsh Government and Network Rail.<ref name="BBCN">Template:Cite web</ref><ref name="PCN">Template:Cite web</ref>

As part of the scheme, a new entrance building and two new platforms were constructed at Queen Street. This brought the number of platforms back up to the pre-1973 number of five, allowing the number of trains running through the station to be increased from 12 to 16 per hour.<ref>Template:Cite web</ref> These included a second northbound through platform, and a south facing platform reserved for the shuttle service to Template:Rws. The new platforms were brought into use on 14 December 2014.<ref name="WOCP">Template:Cite web</ref>

In the spring of 2016, a roll of honour of those who served the armed forces between 1914 and 1919 from the Taff Vale Railway was put on display in the ticket hall. In November 2017, a QR code was added to give more information about those commemorated in the roll call.<ref>Template:Cite web</ref>

Services

File:South-east Wales rail network map.svg
Map of the south-east Wales rail network

Queen Street is the main hub of the Valley Lines network – a railway system serving Cardiff, the Vale of Glamorgan, Bridgend and the South Wales Valleys – and has the solitary connection to Cardiff Bay. The station is located at the eastern end of the city centre, near the Capitol and St David's shopping centres, and sees heavy volumes of commuter rail traffic during the rush hour.

The station has five platforms at a level raised above the surrounding roads:

Platform Direction Line Destination Frequency
1 Southbound Butetown Branch Line Shuttle Cardiff Bay 2t/h [30 min]
2
Butetown Branch Line Cardiff Bay 2t/h [30 min]
Cardiff City Line, Cynon Line Aberdare 2t/h [30 min]
Vale of Glamorgan Line Penarth 4t/h [15 min]
3 Vale of Glamorgan Line Bridgend via Rhoose 1t/h [60 min]
Barry Island 3t/h [15-30 min]
4 Northbound Coryton Line Coryton 2t/h [30 min]
Rhondda Line Treherbert 2t/h [30 min]
Butetown Branch Line Pontypridd 2t/h [30 min]
Taff Line Merthyr Tydfil 2t/h [30 min]
5 Rhymney Line Rhymney 2t/h [30 min]
Bargoed 2t/h [30 min]
Caerphilly 2t/h [30 min]

Template:Cardiff Lines

The typical Monday – Saturday service per hour (as of June 2024) is as follows:<ref>Template:Cite web</ref>

Northbound (towards Coryton and the Valleys):

Southbound (towards Cardiff Central, Cardiff Bay, The Vale and to Aberdare via the City Line):

Template:Rail start Template:Rail line Template:Rail line two to one Template:Rail line two routes Template:S-note Template:Rail line Template:S-end

See also

References

Template:Reflist

Template:Commons category inline Template:Stn art lrnk

Template:Cardiff, Newport and the Valleys railway stations Template:Transport in Cardiff Template:South Wales Metro