Euskotren Tranbia

From Vero - Wikipedia
Jump to navigation Jump to search

Template:Short description Template:Infobox public transit

Euskotren TranbiaTemplate:Efn is the brand under which the tramway networks in the cities of Vitoria-Gasteiz and Bilbao (both in the Basque Country) are run. The system in Bilbao started operations in 2002, and the one in Vitoria-Gasteiz in 2008. It is one of the four commercial divisions under which Euskotren (a public company managed by the Basque Government) operates. The infrastructure is owned by the public entity Euskal Trenbide Sarea (Basque Railway Network)<ref>Template:Cite report</ref> and tracks use Template:RailGauge narrow gauge.Template:Citation needed

Services

File:Bilbao 05 2012 EuskoTran 2868.JPG
Tram in Bilbao.

Euskotren Tranbia operates tram networks in Vitoria-Gasteiz (province of Álava) and Bilbao (province of Biscay). The first network, then named EuskoTran started operations in Bilbao in 2002 after two years under construction, connecting Bilbao-Atxuri Station with Uribitarte.<ref name="EP">Template:Cite news</ref> The line was eventually expanded to the Guggenheim Museum Bilbao,<ref name="programa">Template:Cite web</ref> Basurto Hospital<ref name="EP2003">Template:Cite news</ref> and finally La Casilla.<ref name="EM2012">Template:Cite news</ref>

The tramway system in Vitoria-Gasteiz opened in 2008 and has a Y-shaped network, with two different lines that cross the city from south to north.<ref>Template:Cite web</ref>

Trams run on the street (shared with other traffic or on dedicated tracks) and on grass tracks.Template:Citation needed It also shares dedicated lanes with the local bus services, TUVISA in Vitoria-Gasteiz and Bilbobus in Bilbao.Template:Citation needed

Stop design

File:Vitoria 05 2012 EuskoTran 1845.JPG
Tram unit in Vitoria-Gasteiz.

The two tram systems have their own, distinguishable stops, some of them shared with bus systems and with low platforms. The stops of Atxuri, Ribera and Abando, all of them in Bilbao, do not have a dedicated platform, they use the sidewalk. Except for Atxuri, all stops are unstaffed and rely on automated ticket machines. All the stations have displays and screens with the network map, the current time and temperature and the frequencies. Due to the low platforms, the access between them involves crossing the tracks by pedestrian level crossing. They are virtually level with the doors and are all wider than Template:Convert. This allows wheelchairs, prams, pushchairs and the elderly to board the tram easily with no steps. In street sections, the pavement is integrated with the tram stop.Template:Citation needed The system in Bilbao has 14 stops, while the one in Vitoria has 23.<ref>Template:Cite news</ref>

Systems

File:Euskotran logo.gif
The service was formerly branded as EuskoTran.

Bilbao

Template:Main

Vitoria-Gasteiz

Template:Main

Fares and ticketing

The two systems use both regular paper tickets and smartcards (BAT, Barik and Mugi). There are single, daily and monthly tickets available.<ref>Template:Cite web</ref> In both networks, ticket pricing is not based on zone-based rules, as there's a unique fare for the whole of each network.

Rolling stock

Euskotren Tranbia operates a fleet of 26 CAF Urbos trams, distributed between both networks.

Current fleet

Class Image Number Network In service Notes
400 series (CAF Urbos 1) File:Tram in Bilbao.jpg 8 Bilbao 2002–present
500 series (CAF Urbos 2) File:Euskotran vitoria 1.jpg 11 Bilbao, Vitoria-Gasteiz 2008–present 3 in Bilbao<ref name="et7">Template:Cite web</ref>
8 in Vitoria-Gasteiz
600 series (CAF Urbos 3) 7 Vitoria-Gasteiz 2020–present

The 400 series consists of 8 vehicles (numbered 401-408),<ref name="spanishrailway-bilbao">Template:Cite web</ref> built for the Bilbao network. The trams are Template:Convert long, have 70% low floor access and are made up of three cars. Each tram can carry 196 passengers.<ref>Template:Cite web</ref> They are the only CAF Urbos 1 trams to have been built.<ref>Template:Cite magazine</ref>

The 500 series consists of 11 vehicles (numbered 501-511), originally built for the Vitoria-Gasteiz network.<ref>Template:Cite web</ref> The trams are Template:Convert long, have 100% low floor access and are made up of five cars. Each tram can carry 261 passengers.<ref name="CAF vit">Template:Cite web</ref> Due to the introduction of the larger 600 series in Vitoria-Gasteiz, three vehicles will be transferred to Bilbao.<ref>Template:Cite news</ref>

The 600 series consists of 7 vehicles<ref name="et7"/><ref>Template:Cite news</ref> (numbered 601-607), built for the Vitoria-Gasteiz network. The trams are Template:Convert long, have 100% low floor access and are made up of seven cars. Each tram can carry 398 passengers.<ref name="CAF vit"/>

Livery

The trams were originally painted in grey and green stripes, the colours of Euskotren Tranbia. The current livery is white and green.Template:Citation needed

Planned developments

Bilbao

Template:Main

Vitoria-Gasteiz

Template:Main

Shelved projects

Barakaldo tram

There were plans to create a tram network in the municipality of Barakaldo, in the Greater Bilbao area, which would have started in Urbinaga (where it would have been connected to the Leioa tram) and from there create a circular line around the city center. The project included fifteen stops within Barakaldo plus two in Sestao, where it would connect with the Leioa line.Template:Citation needed Even if this project hasn't been officially canceled, no progress has been made since 2010.<ref>Template:Cite news</ref>

Leioa tram

File:Plano euskotran leioa.png
The proposed Leioa tram.

The construction of a tramway for the municipality of Leioa, in the Greater Bilbao area had two phases. The first phase consisted in the construction of the depot and offices. The second phase would have involved the line itself including the rail track and stops from the University of the Basque Country campus to downtown Leioa. It would have included nine stops. A third phase would have made the tramway cross the Estuary of Bilbao and connect Leioa with the Left Bank with two extra stations.Template:Citation needed

Only the first phase (the depot and offices) has been built. After being postponed several times, the project was shelved in 2018.<ref>Template:Cite news</ref>

See also

Notes

Template:Notelist

References

Template:Reflist

Template:Commons category

Template:Rail transport in Spain Template:Bilbao Transport

Template:Authority control