Guri Dam
Template:Use dmy dates Template:Infobox dam The Simón Bolívar Hydroelectric Plant, also Guri Dam (Template:Langx or Represa de Guri), previously known as the Raúl Leoni Hydroelectric Plant, is a concrete gravity and embankment dam in Bolívar State, Venezuela, on the Caroni River, built from 1963 to 1969.<ref name=eb>Template:Cite encyclopedia</ref> It is 7,426 metres long and 162 m high.<ref>Template:Cite web</ref> It impounds the large Guri Reservoir (Embalse de Guri)<ref>Template:Cite news</ref> with a surface area of Template:Convert.<ref>Template:Cite book</ref>
The Guri Reservoir that supplies the dam is one of the largest on earth. The hydroelectric power station was once the largest worldwide in terms of installed capacity, replacing Grand Coulee HPP, but was surpassed by Brazil and Paraguay's Itaipu.<ref>Template:Cite book</ref>
History and design
Technical and economic feasibility studies were begun in 1961, conducted by the Harza Engineering Company.<ref name=powertechnology>Template:Cite web</ref> An international consortium of six firms was awarded the contract for the construction of the plant, including four United States companies participating under the Alliance for Progress.<ref name=powertechnology /><ref>Template:Cite book</ref> In 1963, construction began for the hydroelectric power station Guri in the Necuima Canyon, about 100 kilometers upstream from the mouth of the Caroní River in the Orinoco.<ref>Template:Cite book</ref> By 1969, a Template:Cvt and Template:Cvt dam with the official name of Central Hidroeléctrica Simón Bolívar (previously named Central Hidroeléctrica Raúl Leoni<ref name="CorriganNash2007">Template:Cite book</ref> from 1978 to 2000) had been built.<ref name="inc1993">Template:Cite book</ref> It created a reservoir which is the largest fresh water body of water in Venezuela and one of the largest man-made blackwater lakes ever created,<ref>Template:Cite book</ref> with its water level at 215 metres above sea level.<ref>Template:Cite book</ref> The power station had a combined installed capacity of 1750 megawatts (MW).<ref name=eb/> By 1978, the capacity had been upgraded to 2065 MW, generated by ten turbines.<ref>Template:Cite book</ref>
Because the electricity demand grew so fast, 1976 saw the beginning of a second building stage: a Template:Cvt gravity dam was built, another spillway channel and a second powerhouse containing 10 turbines of 725 MW each.<ref name="YazdandoostAttari2004">Template:Cite book</ref> This increased the dam's dimensions to Template:Cvt in height<ref>Template:Cite book</ref> and to 7426 m (according to other sources 11,409 m)<ref name=eb/> in crest length. The water level rose to 272 m<ref name="Cifras2006">CVG Electrificación Del Caroní, C.A.: Cifras 2006, Template:ISSN. Caracas, Agosto 2007</ref>Template:Rp and the reservoir grew in size and volume to a capacity of 138 billion cubic m for flood storage or floodwater evacuation.<ref name=eb/> The structure was inaugurated on 8 November 1986.<ref>Template:Cite book</ref>
Since 2000, there is an ongoing refurbishment project to extend the operation of Guri Power Plant by 30 years. This project is to create 5 new runners and main components on Powerhouse II, and close to the end of 2007 is starting the rehabilitation of four units on Powerhouse I.Template:Citation needed
Generating failures and blackouts
2010
Due to government policy in effect from the 1960s to minimize power production from fossil fuels in order to export as much oil as possible, 74% of Venezuela's electricity comes from renewable energy like hydroelectric power.<ref name="Cifras2006"/>Template:Rp Template:As of the Guri Dam alone supplied more than a third of Venezuela's electricity<ref name="Cifras2006"/>Template:Rp Part of the power generated at Guri is exported to Colombia and Brazil.<ref name="Cifras2006"/> The risks of this strategy became apparent in 2010, when, due to a prolonged drought, water levels were too low to produce enough electricity to meet demand.<ref name="CorralesPenfold2011">Template:Cite book</ref><ref name="NicholsMorse2010">Template:Cite book</ref> In January 2010, the Venezuelan government imposed rolling blackouts to combat low water levels behind the dam due to drought.<ref name="CorralesPenfold2011"/>
2016
In April 2016, water levels again became low, and the government announced blackouts of 4 hours per day, for 40 days or until water levels stabilized.<ref>Template:Cite web</ref> Government employees were told not to come to work on Fridays, president Maduro urged women not to use hair dryers, and the electricity supplied to fifteen shopping malls was rationed.<ref>Template:Cite news</ref><ref>Template:Cite web</ref><ref name="independent.co.uk">Template:Cite web</ref> Three days were added to the 2016 Easter national holiday, allowing for a one-week shutdown of public services and private businesses.<ref name="independent.co.uk"/>
2019
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} On 7 March 2019, shortly before 17:00 local time, the Simón Bolívar Hydroelectric Plant failed, leaving most of Venezuela's 32 million citizens in darkness.<ref>Template:Cite news</ref> In the days following the onset of the blackout, at least four attempts were made to restart the key San Gerónimo B substation, which distributes 80% of the country's electricity, but all failed, and no date was set for the plant's reactivation.<ref name="Day5">Template:Cite web</ref> Government officials claim the blackout was "an act of sabotage", while experts attributed the failure to aging infrastructure and insufficient maintenance.<ref>Template:Cite news</ref>
See also
- Energy policy of Venezuela
- List of largest power stations in the world
- List of conventional hydroelectric power stations
References
External links
- EDELCA
- Erection Company on Guri Template:Webarchive HPC Venezuela C.A. (VHPC)
Template:Raúl Leoni Template:Caroní River dams Template:Authority control