Manor Park railway station

From Vero - Wikipedia
Jump to navigation Jump to search

Template:Short description Template:Distinguish Template:Use dmy dates Template:Use British English Template:Infobox London station Manor Park railway station is on the Great Eastern Main Line serving Manor Park in the London Borough of Newham, east London. It is Template:Convert down the line from London Liverpool Street and is situated between Template:Rws and Template:Rws. Its three-letter station code is MNP and it is in London fare zone 3 and 4. It is currently managed and served by the Elizabeth line.

Manor Park is a short walk from Woodgrange Park on the Gospel Oak to Barking line, and an out-of-station interchange is available one stop to the west, at Forest Gate, for Wanstead Park.<ref>Template:Cite web</ref>

History

Great Eastern Railway (1873-1922)

The railway through the site of Manor Park station was first built in 1839 by the Eastern Counties Railway as the first part of what was to become the Great Eastern Main Line, which was constructed between Template:Rws and Template:Rws.

The original name for the station was Manor Park and Little Ilford. When the original line was built the Manor House had its own access road and bridge that crossed the railway line. Little Ilford referred to the settlement on the western bank of the River Roding opposite Ilford.<ref>Template:Cite book</ref>

When the station opened on 6 January 1873 the land north of the station was undeveloped. The access bridge was replaced by a bridge (Forest Drive) over the railway at the station, and the station building was located on this. The Manor House itself succumbed to housing development and had disappeared by the 1890s. A signal box was provided on the upside of the line west of the station.<ref>Template:Cite book</ref>

A goods yard was provided in 1882 which was located east of the station and a new signal box provided there to control the entrance to that yard. The earlier box was closed.<ref>Template:Cite book</ref>

As London grew, developers starting acquiring land to build new properties and the demand at stations such as Manor Park increased. The GER realised that the two track main line was not enough to cope with the new suburban traffic and longer distance traffic and still provide a reliable service for the minor stations such as Manor Park. The answer was a programme of quadrupling (providing two additional tracks) along the route and this work took place in phases.

The GER was mostly restricted to the land it owned and work commenced c1890 in preparing for the quadrupling that was complete in 1894. The two new lines called the Through Lines, were provided south of the station and the goods yard (which was moved slightly southward) was connected to these lines. In the case of Manor Park some additional land to the north was purchased to accommodate what were now the Local Lines. A new signal box was provided east of the station and the 1882 box became an office. No platforms were provided on the Through Lines as these were used by longer distance services.

An additional track was also provided and opened on 4 April 1893 which ran between the west end of Manor Park and Forest Gate Junction. This was a reception road for the new goods yard located there.<ref>Template:Cite book</ref>

Table 298 of the Bradshaw's timetable guide of July 1922 shows Manor Park to have a regular services of trains from Liverpool Street or Fenchurch Street. These trains terminated at Ilford, Chadwell Heath, Romford or Gidea Park or worked through to the Fairlop Loop. The station is referred to as Manor Park for Little Ilford in this publication.

In 1923, the GER amalgamated with other railways to form the London and North Eastern Railway (LNER).

London and North Eastern Railway (1923 - 1947)

During this period local stopping trains were generally hauled by LNER Class N7 locomotives on trains of corridor type carriage stock.

A typical LNER Suburban train, GER section of the LNER (CJ Allen, Steel Highway, 1928)

Plans were drawn up in the 1930s to electrify the suburban lines from Liverpool Street to Shenfield at 1,500Template:NbspVTemplate:NbspDC and work was started on implementing this. However, the outbreak of the Second World War brought the project to a temporary halt and it was not until 1949 that the scheme was completed.<ref>Template:Cite journal</ref>

The station was damaged by bombing on 29 July 1944 during World War II.<ref>Template:Cite book</ref>

As part of the electrification scheme a flyover was built just north of Manor Park. The flyover was designed to remove conflicting moves between Local Line and Through Line trains and meant that Maryland, Forest Gate and Manor Park stations required new platforms to be provided on the Through Lines as these three locations only had Local Line platforms after the 1893/4 quadrupling.<ref>Template:Cite book</ref>

An additional fifth line known as the Up Passenger Avoiding line was added which allows up trains to switch from the up Through to Up Local lines. After the work was completed the Local Lines became the Electric Lines and the Through Lines became the Main Lines.

British Railways (1948 - 1994)

On 1 January 1948, following nationalisation of the railways, Manor Park became part of the British Railways Eastern Region. The electrification scheme and its associated works were finished and from February 1949 the Class 306 EMUs operated the service to steam timings but an accelerated all electric schedule was introduced in September 1949.<ref>Template:Cite journal</ref>

The signal box was closed as part of the electrification scheme on 14 August 1949 and a new box at Aldersbrook north of Manor Park took over working the area's signals.<ref>Template:Cite journal</ref>

The 1500 DC electrification system was converted to 25/6.35 KV AC operation between 4 and 6 November 1960.<ref>Template:Cite web</ref>

In 1980 the first Class 315 EMUs were introduced to replace the Class 306s and were used on passenger trains serving Forest Gate.<ref>Template:Cite journal</ref>

The railway was sectorised in 1982 and Manor Park and the trains calling at it became part of the London and South-East sector. On 10 June 1986 this was rebranded to become Network South East which was responsible for working services up to privatisation.<ref>Template:Cite journal</ref><ref>Template:Cite magazine</ref>

The privatisation era (1994 - present day)

In April 1994 Railtrack became responsible for the maintenance of the infrastructure. Railtrack was succeeded by Network Rail in 2002.

Between privatisation on 1 April 1994 and 4 January 1997 the station was operated by a non-privatised business unit. Since then passenger services calling at the station have been operated by the following franchises:

315823 at Manor Park station

In 2015, services run by Greater Anglia were intermediately rebranded to TfL Rail, as part of the development of the Elizabeth line. Significant upgrades were made to the station, including the installation of three lifts, a new bridge, staircases, and signage.

In June 2017, new Template:Brc trains began entering service in preparation for completion of the Crossrail project. The Class 315 trains were finally taken out of service in 2022. Through services to central London, Heathrow Airport and Reading started running on the Crossrail-constructed Elizabeth line on 22 November 2022.<ref>Template:Cite web</ref>

In early 2019 step free access was introduced to Manor Park station.<ref>Template:Cite web</ref>

Services

All services at Manor Park are operated by the Elizabeth line using Template:Brc EMUs.

The typical Monday to Friday off-peak service in trains per hour is:<ref>Template:NRtimes</ref><ref>Template:Cite webTemplate:Dead link</ref>

During the peak hours, the station is served by a number of additional services between London Liverpool Street and Template:Stnlnk. These services do not call at Template:Stn.

On Sundays, the service to and from Shenfield is reduced to 4 tph, with alternating services running only as far as Gidea Park.

Template:S-rail-start Template:S-rail Template:Rail line Template:End

Future development

New Template:Brc trains began entering service in 2017. Platforms 1 and 2 are only Template:Convert and Template:Convert long respectively and cannot physically be extended to accommodate the new trains, which will be over Template:Convert in length, so selective door operation will be used. The freight loop around platform 1 is due to be removed and replaced by a new loop line further down-line, west of Template:Rws.Template:Citation needed

Due to the narrow platforms and the layout of the station, fitting lifts for disabled access is difficult, requiring the walkways to be rebuilt and closing parts of the station for several months. The station will receive new ticket machines and gates, an accessible toilet and new retail space.<ref>Template:Cite press release</ref>

Connections

London Buses routes 101, 304, 474 and W19 serve the station.<ref>Template:Cite web</ref>

References

Template:Reflist

Template:Commons Template:Stn art lnk

Template:Transport in London Template:Navbox Template:Crossrail navbox