USS R-1
Template:Short description Template:Use American English Template:Use dmy dates
USS R-1 (SS-78), also known as "Submarine No. 78", was the lead ship of the R-1-class coastal and harbor defense submarines of the United States Navy commissioned shortly after the end of World War I.
Due to space constraints, the boats built at the Fore River Shipbuilding Company yard, were laid down much later than the boats built at the Union Iron Works and the Lake Torpedo Boat Company yards. Because of this, none were commissioned before the end of WWI.
Design
The submarines had a length of Template:Convert overall, a beam of Template:Cvt, and a mean draft of Template:Cvt. They displaced Template:Convert on the surface and Template:Cvt submerged. The R-1-class submarines had a crew of 2 officers and 27 enlisted men. They had a diving depth of Template:Cvt.Template:SfnTemplate:Sfn
For surface running, the boats were powered by two Template:Convert NELSECO 6-EB-14 diesel engines, each driving one propeller shaft. When submerged each propeller was driven by a Template:Convert Electro-Dynamic Company electric motor. They could reach Template:Convert on the surface and Template:Cvt underwater. On the surface, the R-1-class had a range of Template:Convert at Template:Cvt, or Template:Cvt if fuel was loaded into their main ballast tanks.Template:Sfn
The boats were armed with four [[American 21-inch torpedo|Template:Convert]] torpedo tubes in the bow. They carried four reloads, for a total of eight torpedoes. The R-1-class submarines were also armed with a single [[3"/50 caliber gun|Template:Cvt/50 caliber]] deck gun.Template:SfnTemplate:Sfn
Construction
R-1Template:'s keel was laid down on 16 October 1917, by the Fore River Shipbuilding Company, in Quincy, Massachusetts. She was launched on 24 August 1918,Template:Sfn sponsored by Mrs. Margaret Dashiell,Template:Sfn and commissioned on 16 December 1918, at Boston, Massachusetts.Template:Sfn
Service history
1918–1931
After her shakedown in New England waters, R-1 was assigned to Submarine Division 9 of the Atlantic Fleet, and based at New London, Connecticut. She got underway on 4 December 1919, for Norfolk, Virginia, and winter exercises with her division in the Gulf of Mexico, and returned to New London, on 18 May 1920, for four months of summer operations with Template:USS and Template:USS, before sailing on 13 September, for Norfolk and overhaul.Template:Sfn
When the US Navy adopted its hull classification system on 17 July 1920, she received the hull number SS-78.Template:Sfn
R-1 was ordered to the Pacific Ocean, on 11 April 1921. She transited the Panama Canal, in late May, and arrived on 30 June, at her new base, San Pedro, California. She took part in fleet exercises off Central America, from 5 February through 6 April 1923, and returned to San Pedro, on 10 April. On 16 July, she was transferred, along with Division 9, to Pearl Harbor. For the next eight years she trained crews and developed submarine tactics out of Pearl Harbor.Template:Sfn
Departing San Diego, California, on 5 January 1931, R-1 sailed for Philadelphia, Pennsylvania, via the Panama Canal, and arrived on 9 February. She was decommissioned there on 1 May.Template:Sfn
1940–1946
On 23 September 1940, R-1 was recommissioned, in ordinary, at Groton, Connecticut. She was overhauled and commissioned in full, on 16 October. R-1 got underway with Submarine Squadron 3, Division 42, on 10 December, for the Panama Canal Zone. She was stationed at Coco Solo, for a year, then she was reassigned to Division 31, in June 1941. R-1 was ordered to New London, in October, for a refit, and transferred to Squadron 7.Template:Sfn
At New London, on 7 December 1941, R-1 remained in the southern New England area for the first days of the United States participation in World War II. On 9 and 10 December, she patrolled the sealanes leading to New England, and on 11 December, arrived at Bermuda, whence, with other SubRon 7 boats, she joined the hunt for U-boats preying on maritime traffic along the Atlantic Seaboard. Although limited in cruising range, the R-boats operating out of Ordnance Island, Bermuda, continued their patrols through the Kriegsmarine submarine offensive of early 1942.Template:Sfn
In February, the submarines established a patrol line between Bermuda and Nantucket Island. On that patrol line, some Template:Convert northeast of Bermuda, R-1 sighted and fired four torpedoes at the surfaced U-boat,Template:Sfn Template:GS, and was credited with sinking the German submarine, although U-582 was in fact undamaged.Template:Sfn
R-1 continued patrols out of Bermuda, until returning to New London, on 20 July, for upkeep and coastal patrols. At the end of September, she resumed operations out of Bermuda. Through November 1944, she rotated between Bermuda and New London, and at the latter, in December, underwent an extensive conversion to enable her to participate in the development of anti-submarine warfare (ASW) equipment and tactics. Emerging from the yard on 26 February 1945, she steamed to New York City, on 28 February; then headed south to Florida, for three weeks of operations off Port Everglades, Florida. In April, she returned to New London, then on to Casco Bay, Maine, for further ASW tests. Returning to the Thames River base, on 29 June, she headed south again on 7 July, and at mid-month, reported for duty with the Fleet Sonar School at Key West, Florida, where she served for the remainder of her career.Template:Sfn
Fate
R-1 decommissioned at Key West, on 20 September 1945, and was struck from the Naval Vessel Register on 10 November. Still at Key West, awaiting disposal, on 21 February 1946, the overage submarine sank in Template:Cvt of water. Raised three days later, she was sold for scrap on 13 March 1946, to Macey O. Smith, of Miami, Florida.Template:Sfn
See also
- Bride 13 (1920)
References
Bibliography
- Template:Cite journal
- Template:Cite book
- {{#invoke:citation/CS1|citation
|CitationClass=web }}
External links
Template:Military navigation Template:WWI US ships Template:WWII US ships