Cranbourne line
Template:Short description Template:About Template:Good article Template:Use dmy dates Template:Use Australian English Template:Infobox rail service The Cranbourne line is a commuter railway line in the city of Melbourne, Victoria, Australia.<ref name="auto">Template:Cite web</ref> Operated by Metro Trains Melbourne, it is the city's second longest metropolitan railway line at Template:Convert. The line runs from Flinders Street station in central Melbourne to Cranbourne station in the south-east, serving 24 stations via the City Loop, South Yarra, Caulfield, Oakleigh, and Dandenong.<ref>Template:Cite web</ref> The line operates for approximately 20 hours a day (from approximately 4:00 am to around midnight) with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 to 15 minutes are operated with services every 15–20 minutes during off-peak hours.<ref name="auto"/> Trains on the Cranbourne line run with a seven-car formation operated by High Capacity Metro Trains.<ref>Template:Cite web</ref>
The line originally opened in 1888 branching off from the Gippsland line at Dandenong as the South Gippsland line.<ref name=":2">Template:Cite web</ref> Services operated as far as Port Albert, with extensive branch lines featuring on the non-electrified network. The line(s) were built to serve the regional townships of Cranbourne, Koo Wee Rup, and Leongatha, amongst others. The line was closed in 1993 after a decline in usage, however, the line was reopened and electrified to Cranbourne in 1995 as part of the "Building Better Cities" program.<ref>Template:Cite web</ref><ref name=":3">Template:Cite book</ref> Significant growth has occurred since its reopening, with proposals to extend the line two stations to Clyde receiving support amongst other works on the corridor.<ref name=":11" />
Since the 2010s, due to the heavily utilised infrastructure of the Cranbourne line, significant improvements and upgrades have been made. A $1 billion upgrade of the corridor between Dandenong and Cranbourne is currently under construction, with improvements including the removal of all level crossings, rebuilding stations, and the duplication of Template:Convert of track.<ref name=":4" /> Other works taking place have included the replacement of sleepers, the introduction of new signalling technology, the introduction of new rolling stock, and other works associated with the Metro Tunnel project.<ref name=":22" /> These projects have improved the quality and safety of the line, and will be completed by the opening of the Metro Tunnel in 2025.<ref name=":43" />
History
19th century
In 1888, the Cranbourne line (then known as the South Gippsland railway line) began operations, splitting off from the main line to Gippsland at Dandenong with an extension to Cranbourne.<ref name=":1122"/> The line was progressively extended to Koo Wee Rup, Nyora, and Loch in 1890, Korumburra and Leongatha in 1891, and Welshpool, Alberton, and Port Albert in 1892.<ref>Template:Cite web</ref><ref name=":2" /> From its opening until 2022, the Cranbourne line was fully single tracked from Dandenong to its terminus, and was only electrified upon its reopening in the 1990s.<ref name=":13">Template:Cite web</ref>
20th century
Regional services
Throughout the early to mid 20th century, the South Gippsland railway line continued to open additional branch lines, including to Woodside, Barry Beach, Welshpool Jetty, Outtrim, Wonthaggi, and Strzelecki.<ref name=":14">Template:Cite web</ref> All of these branch lines ceased their operations between the mid and late 20th century due to a decrease in patronage.<ref name=":14" /> On 6 June 1981, passenger services ceased operation to Yarram. In 1984, the line re-opened with services to Leongatha, until its second closure on 24 June 1993.<ref name=":2" /> The Barry Beach freight service ceased operations in 1992, with the line beyond Leongatha booked out of service on 30 June 1992, thus, effectively ending all traffic on the line beyond Leongatha.<ref name=":16">Template:Victorian Rail-Newsrail</ref> V/Line passenger services continued to Cranbourne till its electrification, with freight operations continuing into the late 1990s with freight services to the Koala siding.<ref name=":16" />
Metropolitan services
In 1995, the Australian Government launched the "Building Better Cities" program, designed to redevelop Australian cities with better communities and infrastructure.<ref name=":3" /> The $27 million project included a rebuilt Dandenong station, a new station in Cranbourne North (Merinda Park station), the introduction of three position signalling, and electrification of the signal tracked corridor.<ref name="ttt2">Template:Cite book</ref> These works resulted in the re-opening of a section of the South Gippsland line to passengers which became known as the Cranbourne Line.<ref name=":3" />
Freight services continued on part of the South Gippsland line till 1998, when services from the Koala Siding were suspended.<ref name="sand2">Template:Victorian Rail-Newsrail</ref> With these changes, the line became unused beyond Cranbourne.<ref name="sand2" /> The exception was a tourist railway operation, which commenced operation between Nyora and Leongatha, and later became known as the South Gippsland Railway till its closure in January 2016.<ref name="SGSTClose">Template:Cite news</ref>
21st century
Template:Main In 2008, a package of works were unveiled to upgrade the Cranbourne line to improve frequencies and the quality of service. A new siding was constructed at Cranbourne, with a capacity of 6 trains, in order to increase frequencies without having to duplicate the line.<ref>Template:Cite web</ref> In addition to the new siding, the $37 million project also brought a major upgrade to Cranbourne station, which included the construction of an enclosed waiting room, new platform shelters, new toilet facilities, formalised paved pedestrian access, an upgraded bus interchange, and increased security.<ref>Template:Cite web</ref>
In 2012, Lynbrook station opened after two years of construction works. The station serves the suburbs of Lynbrook and Lyndhurst, with the station featuring accessible platforms, car parking facilities, and bus stops.<ref name="auto2">Template:Cite web</ref> In 2014, the level crossing at Springvale Road, Springvale, was removed by lowering the railway into a trench. Prior to this, the level crossing was considered the most dangerous in Victoria.<ref>Template:Cite web</ref> The removal consisted of a Template:Convert trench and the construction of a new premium station at Springvale.<ref>Template:Cite web</ref>
In September 2019, Qube Holdings commenced operating a daily service on a short section of the line, hauling containerised cement to the Kimberly-Clark siding at Dandenong South.<ref name=":7">Template:Victorian Rail-Newsrail</ref>
Future
Metro Tunnel
The 2012 Network Development Plan identified the need for a north–south tunnel connecting the Cranbourne and Pakenham lines to the Sunbury line.<ref name=":22">Template:Cite web</ref> In 2017, the Metro Tunnel began construction, involving the construction of five new underground stations, twin Template:Convert tunnels, and other associated infrastructure improvements. Leaving the existing Cranbourne line alignment before South Yarra station, new stations will be built at Anzac, Town Hall (with connections to Flinders Street station), State Library (with connections to Melbourne Central), Parkville, and Arden, before continuing onto the Sunbury line. These works will be completed by 2025, and upon completion, will create a singular rail line from Cranbourne and Pakenham to Sunbury and Melbourne Airport (from 2029).<ref name=":43">Template:Cite web</ref>
Melbourne Airport rail link
The Melbourne Airport rail link will involve the construction of a Template:Convert line from Sunshine to a new station at Melbourne Airport.<ref name=":23">Template:Cite web</ref> Connected via the Metro Tunnel, services will operate from the Cranbourne and Pakenham lines<ref>Template:Cite web</ref> through the tunnel before splitting off at Sunshine to either Sunbury or Melbourne Airport. Construction of the line will involve the renovation of Sunshine station to allow for additional platforms, construction of new track, and the addition of two new stations at Keilor East and Melbourne Airport.<ref name=":62">Template:Cite web</ref> Construction started in 2022 with services expected to begin in 2029.<ref>Template:Cite web</ref>
Clyde extension
Template:MainServices on the South Gippsland line were fully suspended in 1981 due to limited passenger numbers on the route. Since the closure, calls have been made to reopen the line to the suburb of Clyde. Reopening of the line to Clyde was first promised by the Australian Labor Party during the 1999 and 2002 state election campaigns, but were dumped before the 2006 election.<ref>Template:Cite web</ref> In November 2003, a "Trainlink" bus service was introduced as an alternative, meeting each train at Cranbourne station and running on a largely one-way loop through Cranbourne East.<ref>Template:Cite web</ref> The Bracks governments Victorian Transport Plan, released in 2008, listed the extensions and associated works as a "medium term" project, which was estimated to cost $200 million.<ref>Template:Cite web</ref> Despite the political promise to revive the railway line for freight and passenger services by the Bracks-led Labor government in 1999, the project was abandoned in 2008 by his successor John Brumby.<ref>Template:Cite web</ref>
In 2013, as part of Public Transport Victoria's Network Development Plan for metropolitan rail, an extension of the Cranbourne line to Clyde was earmarked to begin in the "long-term", which would equate to at least over the next 20 years.<ref>PTV- Network Development Plan</ref> In January 2018, City of Casey advised it would need almost $3 billion worth of rail and road infrastructure projects to continue development of the region, including the extension of the metropolitan train from Cranbourne to Clyde and the duplication of the line between Dandenong and Cranbourne. In the lead up to the 2018 state election, the incumbent Andrews government announced the Cranbourne Line Upgrade, a project involving the duplication of 8 km of track between Dandenong and Cranbourne, a rebuilt Merinda Park station, the construction of a new rail connection for the Port Rail Shuttle Network, and the removal of all remaining level crossings on the corridor.<ref name=":8">Template:Cite web</ref> Andrews argued that this project was required if an extension to Clyde was to be constructed.<ref name=":8" /> Opposition leader Matthew Guy instead promised that he would extend the Cranbourne line to Clyde if he won the election.<ref name=":02">Template:Cite web</ref>
Again in the lead up to the 2022 state election, the City of Casey increased its campaign for the extension of the rail line to Clyde, including the construction of 3 new stations.<ref name=":11">Template:Cite web</ref> The City of Casey proposal involved the construction of stations at Cranbourne East, Casey Fields (only proposed by the council), and Clyde.<ref name=":11" /> This proposal was supported again by opposition leader Matthew Guy, minus the station at Casey Fields.<ref>Template:Cite web</ref> The incumbent Andrews government made no commitments to the Clyde rail extension, instead continuing construction on the Cranbourne Line Upgrade.<ref>Template:Cite web</ref> The 2022 state election resulted in another Labor victory, with the Andrews government pushing ahead with the Cranbourne Line Upgrade, with the extension to Clyde remaining stagnant ever since.<ref>Template:Cite web</ref>
Level Crossing Removals
The Level Crossing Removal Project has announced the removal of all 15 remaining level crossings on the Cranbourne line, to be completed in stages from 2018 to 2025. All level crossings between Caulfield and Dandenong were removed in 2018 as part of the Caulfield to Dandenong skyrail project.<ref>Template:Cite web</ref> This included the removal of nine level crossings and the reconstruction of five elevated stations along the corridor.<ref>Template:Cite web</ref> The second phase of removals involves removing individual crossings along the corridor through a variety of methods by 2025.<ref>Template:Cite web</ref> Some crossings have been removed through elevating the rail corridor, some by lowering or raising the road, with other crossings being removed by closing the crossing off from motor traffic.<ref>Template:Cite web</ref> These projects will leave the entirety of the Cranbourne line level crossing free by 2025, with projects on the Sunbury line leaving the entire Sunshine-Dandenong corridor crossing free by the opening of the Metro Tunnel in 2025.<ref>Template:Cite web</ref>
Cranbourne line upgrade
Announced in the lead up to the 2018 Victorian state election, the Cranbourne line would receive a $1 billion upgrade to coincide with the opening of the Metro Tunnel.<ref>Template:Cite web</ref> The project is being delivered by the Level Crossing Removal Project, and will include:<ref name=":4">Template:Cite web</ref>
- The removal of the four remaining level crossings (75% complete)
- Evans Road, Lyndhurst (complete)
- Greens Road, Dandenong South (complete)
- Camms Road, Cranbourne (complete)
- Webster Street, Dandenong (gone by 2025)
- The duplication of Template:Convert of single track between Dandenong South and Cranbourne (complete)
- The installation of a second rail bridge at Abbotts Road and Eumemmerring Creek in Dandenong South (complete)
- The reconstruction of Merinda Park station (complete)
- The delivery of a new rail connection for the Port Rail Shuttle Network (underway)
In 2020, the level crossing at Evans Road in Lyndhurst was removed through the construction of a road bridge over the rail line. In early 2021, the first platform of the newly rebuilt Merinda Park station was opened, with the second platform opening a year later.<ref>Template:Cite web</ref> In February 2022, the second platform at Merinda Park was opened along with the completion of duplication works.<ref name=":13"/> After the duplication works, the line could now handle 10-minute frequencies during peak periods. As a result, the timetable was rewritten to allow for 50 extra Cranbourne services to operate every week.<ref>Template:Cite web</ref> Alongside the duplication works, all level crossings on the line will be removed. The Cranbourne line is projected to become the first crossing-free line on the network, with the remaining two crossings and other upgrade works expected to be completed by 2025.<ref name=":0">Template:Cite web</ref>
Network and Operations
Services
Services on the Cranbourne line operates from approximately 4:00 am to around 11:30 pm daily.<ref name=":9">Template:Cite news</ref> In general, during peak hours, train frequency is 5 minutes on the Dandenong corridor (combined with the Pakenham line) and 10 minutes in the AM peak on the Cranbourne line while during non-peak hours the frequency is reduced to 20–30 minutes throughout the entire route.<ref name=":32">Template:Cite web</ref> Cranbourne line services operate as shuttles to and from Dandenong between 10:00 pm and 6:00 am, connecting with Pakenham line trains. During the peak, some services originate and terminate at Westall or Dandenong. Services run anticlockwise through the City Loop, and from 2025, Cranbourne line services will cease to stop at South Yarra, Richmond, and all City Loop stations when trains are rerouted through the Metro Tunnel upon opening.<ref name=":32" /><ref>Template:Cite web</ref> On Friday nights and weekends, services run 24 hours a day, with 60 minute frequencies available outside of normal operating hours.<ref>Template:Cite web</ref> Since 13 February 2022, some off-peak daytime Cranbourne and Pakenham line services stop at Malvern station, running express between South Yarra and Malvern stations.<ref>Template:Cite web</ref>
Freight operations are limited, with Qube Holdings operating a daily service on a short section of the line hauling containerised cement to the Kimberly-Clark siding at Dandenong South.<ref name=":7" />
Train services on the Cranbourne line are also subjected to maintenance and renewal works, usually on selected Fridays and Saturdays. Shuttle bus services are provided throughout the duration of works for affected commuters.<ref>Template:Cite news</ref>
Stopping Patterns
Legend — Station Status
- ◼ Premium Station – Station staffed from first to last train
- ◻ Host Station – Usually staffed during morning peak, however this can vary for different stations on the network.
Legend — Stopping Patterns
Some services do not operate via the City Loop
- ● – All trains stop
- ◐ – Some services do not stop
- ▲ – Only inbound trains stop (trains operate counter-clockwise through the City Loop all day)
- | – Trains pass and do not stop
| colspan="5" style="background:#Template:Rcr;" |Cranbourne Services<ref>Template:Cite web</ref> | ||||
|---|---|---|---|---|
| Station | Zone | Local | Ltd Express | Shuttle |
| ◼ Template:Rwsa | 1 | ● | ● | |
| ◼ Template:Rwsa | ▲ | ▲ | ||
| ◼ Template:Rwsa | ▲ | ▲ | ||
| ◼ Template:Rwsa | ▲ | ▲ | ||
| ◼ Template:Rwsa | ▲ | ▲ | ||
| ◼ Template:Rwsa | ● | ● | ||
| ◼ Template:Rwsa | ● | ● | ||
| ◻ Template:Rwsa | ◐ | Template:Pipe | ||
| ◼ Template:Rwsa | ● | ● | ||
| ◼ Template:Rwsa | ● | Template:Pipe | ||
| ◼ Template:Rwsa | ● | Template:Pipe | ||
| ◻ Template:Rwsa | 1/2 | ● | Template:Pipe | |
| ◼ Template:Rwsa | ● | ● | ||
| ◻ Template:Rwsa | ● | Template:Pipe | ||
| ◼ Template:Rwsa | 2 | ● | ● | |
| ◼ Template:Rwsa | ● | ● | ||
| ◼ Template:Rwsa | ● | ● | ||
| Template:Htxt Template:Rwsa | ● | ● | ||
| ◼ Template:Rwsa | ● | ● | ||
| Template:Htxt Template:Rwsa | ● | ● | ||
| ◼ Template:Rwsa | ● | ● | ● | |
| Template:Htxt Template:Rwsa | ● | ● | ● | |
| Template:Htxt Template:Rwsa | ● | ● | ● | |
| ◼ Template:Rwsa | ● | ● | ● |
Operators
The Cranbourne line has had a total of 5 operators since its reopening in 1995. The majority of operations throughout its history have been privately run.
The government-owned Public Transport Corporation and later Bayside Trains operated the line for a short 4 years till the 1999 privatisation of Melbourne's rail network.<ref>"Melbourne's Rail Network to be Split" Railway Digest November 1997 page 12</ref>
Bayside Trains was privatised in August 1999 and later rebranded M>Train. In 2002, M>Train was placed into receivership and the state government regained ownership of the line, with KPMG appointed as receivers to operate M>Train on behalf of the state government.<ref>National Express walks out of Australian rail service The Daily Telegraph (London) 17 December 2002</ref><ref>Receivers take over train, tram group The Age 24 December 2002</ref><ref>Victorian passenger services get new managers Rail Express 28 January 2003</ref> Two years later, rival train operator Connex Melbourne took over the M>Train operations including the Cranbourne line. Metro Trains Melbourne, the current private operator, then took over the operations in 2009. The private operators have had a combined operational period of Template:Age years.<ref>Template:Cite web</ref>
| Operator | Assumed operations | Ceased operations | Length of operations |
|---|---|---|---|
| Public Transport Corporation | 1995 | 1998 | 3 years |
| Bayside Trains (government operator) | 1998 | 1999 | 1 years |
| M>Train | 1999 | 2004 | 5 years |
| Connex Melbourne | 2004 | 2009 | 5 years |
| Metro Trains Melbourne | 2009 | incumbent | Template:Age years (ongoing) |
Route
Template:For-text Template:Cranbourne LineTemplate:MaplinkThe Cranbourne line forms a relatively linear route from the Melbourne CBD to its terminus in Cranbourne. The line is Template:Convert long and predominantly double-tracked; however, between Flinders Street station and Richmond, the track is widened to 12 tracks, narrowing to 6 tracks between Richmond and South Yarra before again narrowing to 4 tracks between South Yarra and Caulfield.<ref>Template:Cite web</ref> After Caulfield station, the track again narrows to two tracks, which remain for the rest of the route. The only underground section of the Cranbourne line is in the City Loop, where the service stops at 3 underground stations and operates in a counter-clockwise direction.<ref>Template:Cite web</ref> Exiting the city, the Cranbourne line traverses mainly flat country with few curves and fairly minimal earthworks for most of the line. However, between South Yarra and Malvern, the rail corridor has been lowered into a cutting to eliminate level crossings, and between Malvern and Caulfield, the corridor it has been raised on an embankment for the same reason.<ref>Template:Cite web</ref> After Caulfield, the line formerly had numerous level crossings; all have now been abolished between Caulfield and Dandenong as part of an elevated rail project, as well as some older bridges over and under roads.<ref>Template:Cite news</ref> The remaining crossing will be fully removed by 2025.
The line follows the same alignment as the Pakenham line along the Gippsland line, with the two services splitting onto different routes at Dandenong. The Cranbourne line turns south and branches on to the South Gippsland line, while the Pakenham line continues along the Gippsland line.<ref name=":1">Template:Cite web</ref> Most of the rail line goes through built-up suburbs and some industrial areas, but after Dandenong, the line gets into a mix of both open fields and suburbia.<ref name=":1" /> This outer portion of the line is one of Melbourne's main growth corridors, which is rapidly replacing farmland with housing and commercial developments, adding additional passengers to the line each year.<ref>Template:Cite web</ref>
Stations
The line serves 24 stations across Template:Convert of track. The stations are a mix of elevated, lowered, underground, and ground level designs. Underground stations are present only in the City Loop, with the majority of elevated and lowered stations being constructed as part of level crossing removals.<ref>Template:Cite book</ref><ref>Template:Cite web</ref> From 2025, services will cease to stop at Flinders Street, Southern Cross, Flagstaff, Melbourne Central, Parliament, Richmond, and South Yarra stations due to the opening of the Metro Tunnel.
| Station | Accessibility | Opened | Terrain | Train connections | Other connections |
|---|---|---|---|---|---|
| Flinders Street | Yes—step free access | 1854<ref name=":1122">Template:Cite web</ref> | Lowered | Template:Collapsible list | Template:Symbol Template:Symbol |
| Southern Cross | 1859<ref name=":1122"/> | Ground level | Template:Collapsible list | Template:Symbol Template:Symbol Template:Symbol Template:Symbol | |
| Flagstaff | 1985<ref name=":1122"/> | Underground | Template:Collapsible list | Template:Symbol | |
| Melbourne Central | 1981<ref name=":1122"/> | Template:Symbol Template:Symbol | |||
| Parliament | 1983<ref name=":1122"/> | Template:Symbol | |||
| Richmond | No—steep ramp | 1859<ref name=":1122"/> | Elevated | Template:Collapsible list | Template:Symbol Template:Symbol |
| South Yarra | 1860<ref name=":1122"/> | Lowered | Template:Collapsible list | Template:Symbol | |
| Malvern | 1879<ref name=":1122" /> | Template:Collapsible list | |||
| Caulfield | Ground level | Template:Collapsible list | Template:Symbol Template:Symbol | ||
| Carnegie | Yes—step free access | Elevated | Template:Collapsible list | Template:Symbol | |
| Murrumbeena | |||||
| Hughesdale | 1925<ref name=":1122" /> | ||||
| Oakleigh | 1877<ref name=":1122" /> | Ground level | |||
| Huntingdale | No—steep ramp | 1927<ref name=":1122" /> | |||
| Clayton | Yes—step free access | 1880<ref name=":1122" /> | Elevated | Template:Collapsible list | |
| Westall | 1951<ref name=":1122" /> | Ground level | Template:Collapsible list | ||
| Springvale | 1880<ref name=":1122" /> | Lowered | |||
| Sandown Park | No—steep ramp | 1888<ref name="Anderson">Template:Anderson-All Stations</ref> | Ground level | ||
| Noble Park | Yes—step free access | 1913<ref name=":1122" /> | Elevated | ||
| Yarraman | No—steep ramp | 1976<ref name=":1122" /> | Ground level | ||
| Dandenong | 1877<ref name=":1122" /> | Template:Collapsible list | Template:Symbol Template:Symbol | ||
| Lynbrook | Yes—step free access | 2012<ref name=":1122" /> | Template:Symbol | ||
| Merinda Park | 1995<ref name=":1122" /> | ||||
| Cranbourne | 1888<ref name=":1122" /> | Template:Symbol Template:Symbol |
| Station | Opened<ref name="Anderson"/> | Closed<ref name="Anderson"/> | Age | Notes<ref name="Anderson"/><ref name=":43" /> |
|---|---|---|---|---|
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 | |||
| Template:TAC2 | ||||
| Template:Rwsa | Template:TAC2 | |||
| Punt Road | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 | |||
| APEX Siding (Westall) | ? | - |
| |
| Template:Rwsa | Template:TAC2 |
| ||
| Template:Rwsa | Template:TAC2 |
| ||
| Template:TAC2 | ||||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 | |||
| Bonlac Foods Limited Siding | Template:TAC2 |
| ||
| Bombardier Siding | Template:TAC2 |
| ||
| Kimberley Clark Siding | Template:TAC2 |
| ||
| Australian Window Glass Siding | ? | ? | ||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 | |||
| Template:Rwsa | Template:TAC2 |
|
Planned stations
| Station | Accessibility | Expected opening | Terrain | Planned train connections | Other planned connections | Notes |
|---|---|---|---|---|---|---|
| Arden | Yes—step free access | 2025<ref name=":43"/> | Underground | Template:Collapsible list | Opening as part of the Metro tunnel project in 2025<ref name=":43" /> | |
| Parkville | Template:Symbol | |||||
| State Library | Template:Symbol Template:Symbol Template:Symbol | |||||
| Town Hall | Template:Symbol Template:Symbol Template:Symbol Template:Symbol | |||||
| Anzac | Template:Symbol |
Infrastructure
Rolling stock
The Cranbourne line uses a fleet of electric multiple unit (EMU) High Capacity Metro Trains operating in a seven-car configuration, with three doors per side on each carriage and can accommodate of up to 1,380 passengers in each train-set. Shared with the Pakenham, Sunbury, and Airport lines, the rolling stock will consist of 70 High Capacity Metro Trains (HCMT), once fully delivered.<ref>Template:Cite web</ref> They are built in Changchun, China, with final assembly occurring in Newport, Melbourne, by Evolution Rail, a consortium composed of CRRC Changchun Railway Vehicles, Downer Rail and Plenary Group.<ref>Template:Cite web</ref> Comeng and Siemens Nexas (EMU) are sometimes occasionally used.
Previously, the Cranbourne line was served by a fleet of Comeng and Siemens Nexas trains. The oldest Comeng trains (stage 1 and some stage 2) have been retired and scrapped as part of the HCMT introduction, however, some of these trains have been displaced onto other Melbourne metropolitan lines.<ref>Template:Cite web</ref><ref>Template:Cite web</ref>
Alongside the passenger trains, Cranbourne line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.<ref name=":17">Template:Cite web</ref> Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains, and the Southern Shorthaul Railroad.<ref name=":17" />
Accessibility
In compliance with the Disability Discrimination Act of 1992, all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.<ref>Template:Cite web</ref> The majority of stations on the corridor are fully accessible, however, there are some stations that haven't been upgraded to meet these guidelines.<ref name=":12">Template:Cite web</ref> These stations do feature ramps, however, they have a gradient greater than 1 in 14.<ref name=":12" /> Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.<ref name=":12" /> These stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.<ref name=":12" /><ref>Template:Cite web</ref>
Projects improving station accessibility have included the Level Crossing Removal Project, which involves station rebuilds and upgrades, individual station upgrade projects, and associated Metro Tunnel works.<ref>Template:Cite web</ref><ref>Template:Cite web</ref> These works have made significant strides in improving network accessibility, with more than 66% of Cranbourne line stations classed as fully accessible. This number is expected to grow within the coming years, as a network restructure associated with the opening of the Metro Tunnel is completed by 2025.<ref>Template:Cite web</ref>
Signalling
Since its re-opening in 1995, the Cranbourne line had used a fixed-block, three-position signalling system designed for lower frequencies and less services.<ref name=":15">Fisher, Peter (2007). Victorian Signalling: by Accident or Design?. Australian Railway Historical Society (Victorian Division). Template:Isbn</ref> However, the ageing system had undermined reliability due to the presence of system faults and limited frequencies, requiring the Cranbourne, Pakenham, and Sunbury lines to upgrade their signalling system. Since 2021, high-capacity signalling (HCS) has been rolling out on the Pakenham, Cranbourne, and Sunbury lines, allowing trains to safely run closer together and run more frequently.<ref>Template:Cite web</ref> The new system is being delivered by CPB Contractors and Bombardier Transportation under the Rail Systems Alliance. These works valued at $1 billion includes the roll-out of Template:Convert of HCS and communications systems on the aforementioned lines, allowing an increase in reliability and frequency.<ref>Template:Cite web</ref> The line will be equipped with Bombardier's CityFlo 650 communications-based train control system, which will enable operation at 2–3 minute headways.
The upgrade works were completed in phases from 2021. With the upgraded signalling system, trains are now able to run closer to each other. The new system was tested on the Mernda line and a section of the Cranbourne line before being fully implemented.<ref>Template:Cite web</ref> In March 2022, the Cranbourne line underwent further testing of high-tech signalling equipment, to ensure the new trains and signalling system can safely run alongside older-generation trains—including freight and V/Line trains—and the existing signalling system.<ref>Template:Cite web</ref>Template:Clear
References
External links
- Pages with broken file links
- Railway lines in Melbourne
- Railway lines opened in 1886
- 1886 establishments in Australia
- Public transport routes in the City of Melbourne (LGA)
- Transport in the City of Yarra
- Transport in the City of Stonnington
- Transport in the City of Glen Eira
- Transport in the City of Monash
- Transport in the City of Kingston (Victoria)
- Transport in the City of Greater Dandenong
- Transport in the City of Casey