HAL HJT-36 Yashas

From Vero - Wikipedia
Jump to navigation Jump to search

Template:Short description Template:Pp-extended Template:Use dmy dates Template:Infobox aircraft

The HAL HJT-36 Yashas (Template:Lit) is a subsonic intermediate jet trainer aircraft designed and developed by Aircraft Research and Design Centre (ARDC)<ref>Template:Cite web</ref> and built by Hindustan Aeronautics Limited (HAL) for the Indian Air Force and the Indian Navy. The HJT-36 will replace the HAL HJT-16 Kiran as the Stage-2 trainer for the two forces.<ref>Template:Cite web</ref>

The jet, originally named Sitara, was designed as a conventional jet trainer with low swept wings, tandem cockpit and small air intakes for the engine on either side of its fuselage. It entered limited series production by 2010 but according to the Indian Air Force officials it remained "unfit" for service due to technological issues related to spin test (as of March 2017),<ref name="Bedi Jane's">Template:Cite web</ref> an issue which was only solved in tests in January 2022.<ref>Template:Cite news</ref>

In April 2019, Sitara flew for the first time in three years with a modified air frame to correct its spin characteristics.<ref>Template:Cite news</ref>

During the opening ceremony of Aero India 2025, the HJT-36 was renamed as Yashas after undergoing significant design modifications. It is now capable of Stage II pilot training, counter insurgency and counter surface force operations, armament training, aerobatics and other roles.<ref name=":5" />

Development

HAL started design work on an intermediate jet trainer in 1997. The concept was developed as a successor to HAL's earlier trainer, the HJT-16 Kiran, introduced in 1968. In 1999, following reviews by the Indian Air Force, the Government of India awarded Hindustan Aeronautics a contract for the development, testing, and certification of two prototype IJT aircraft at the cost of Template:INRConvert. The completion of the contract was scheduled in July 2004.<ref name=":2" />

In order to complete the design and prototyping in such tight schedules, HAL introduced highly advanced technologies including Numerical Master Geometry (NMG) to various teams for the aircraft's wind tunnel testing, aerodynamics, structural analysis, tooling among others.<ref>Template:Cite web</ref>

2000s

HAL HJT-36 PT-1 (S3466) Sitara at Yelahanka Air Force Station
  • The first and second prototypes of the HJT-36, labeled PT-1 and PT-2, serialed S3474 and S3466, flew on 7 March 2003 and in March 2004, respectively.<ref name=":3">Template:Cite web</ref>
  • In April 2005, the project cost was revised to Template:INRConvert and timeline for Initial Operational Clearance (IOC) and the Final Operational Clearance (FOC) was expected in 2006-07 and 2007-08, respectively.<ref name=":2" />
  • In April 2005, some delays were expected as the SNECMA Turbomeca Larzac engine was to be replaced by NPO Saturn AL-55I (16.9 kN) for higher thrust requirements.<ref name=":2" />
  • In February 2006, the Ministry of Defence submitted a proposal to the Cabinet Committee on Security (CCS) for procurement of 12 IJT Limited Series Production (LSP) aircraft from HAL. The clearance and the contract from the Indian Air Force was received in March 2006 at a cost of Template:INRConvert. Deliveries, originally scheduled between March 2008 and March 2010, was further revised to 2011-12. Later, a CAG report flagged that LSP orders are to be placed after IOC certification from CEMILAC, however, this was not followed in case of IJT project. It was then expected that the order of 73 Serial Production (SP) aircraft was to be done after conducting operations of LSP aircraft and certain required modifications to designs.<ref name=":4">Template:Cite web</ref>
  • On 8 February 2007, IJT prototype PT-1 overshot the runway at Yelehanka AFS during the inauguration of Aero India after its tyres burst during take-off.<ref>Template:Cite news</ref><ref name="hindu-aero2007">Template:Cite news</ref><ref>Template:Cite news</ref>
  • In November 2008, Air HQ initiated a proposal to for supply of 73 SP IJT aircraft from HAL.<ref name=":4" />
  • On 4 February 2009, PT-2 met with an accident just before the Aero India event due to landing gear failure while landing during a routine test flight.<ref name=":2">Template:Cite web</ref><ref>Template:Cite web</ref>
  • Following the crashes and delays, in March 2009, the IOC and FOC dates were shifted to 2009-10 and 2010-11, respectively.<ref name=":2" />
  • The first AL-55I engine was received from Russia on 28 December 2008, 2 years later than committed, and was installed on PT-1.<ref>Template:Cite news</ref> Following ground taxiing trials, flight tests with the new engine started on 9 May 2009.<ref name="deagel">Template:Cite web</ref><ref name="hindu.com">Template:Cite news</ref> However, the Russian-origin was relatively newly developed compared to the Larzac, which had 0.85 million hours of flight. This led to "teething problems" in the engines which eventually lowered the availability of the IJT prototypes and limited series production variants for test flights.<ref name=":7">Template:Cite web</ref>

2010s

  • Prototype IJT (PT-2, S3474) in its hangar at Hindustan Aeronautics Limited
    In March 2010, the Air Force placed an order for 73 HJT-36 trainers for serial production at a cost of Template:INRConvert, again before the completion of IOC certification and deliveries of LSP aircraft. Clearance for the contract was approved by the CCS in February. As per MoD, the LSP aircraft order would be completed by 2011-12 and the timeline for delivery of 73 SP aircraft was between 2013 and 2017. As per delivery timeline, 6 aircraft would have to be delivered in 2013, followed by 24 aircraft in 2014 An advance payment of Template:INRConvert was done.<ref name=":4" />
  • The first flight test for the limited series aircraft occurred in January 2010,<ref name="aw-20100528">Template:Cite web</ref> and initial operational capability was expected by July 2011.<ref>Template:Cite news</ref><ref>Template:Cite web</ref>
  • On 28 April 2011, the first prototype (S3466) crashed in near Hosur during routine test flight in Krishnagiri district, Tamil Nadu. Both the pilots, Group Captain Anant Mathur of HAL and co-pilot Wing Commander Patra of Aircraft and Systems Testing Establishment (ASTE), ejected safely. The aircraft was lost in the accident.<ref>Template:Cite web</ref><ref>Template:Cite web</ref><ref>Template:Cite web</ref>
  • On 27 July 2012, first Engine Ground Run was performed on third prototype.<ref>Template:Cite web</ref><ref name="Public Information Bureau, India">Template:Cite web</ref>
  • In December 2013, HAL declared that Sitara was 'weeks' from certification.<ref>Template:Cite news</ref>
  • On 19 February 2014, the Indian MoD submitted a statement that the development of IJT was in the advanced stages of certification, with more than 800 test flights completed so far. The activities were progressing well with completion of sea level trials, night flying trials, high altitude trials as well as weapon and drop tank trials. The activities left for obtaining Final Operational Clearance (FOC) are the refinement of stall characteristics, and spin testing which will be commenced as soon as stall characteristics were refined. All efforts were being made to achieve FOC by December 2014. Production of aircraft was to commence immediately thereafter.<ref>Template:Cite web</ref> However the stall cannot be tested until HAL redesigns the entire aircraft to correct its "inherent asymmetry".<ref>Template:Cite web</ref>
  • As of July 2014, 6 of the LSP aircraft were produced but still not delivered due to non completion of Design and Development (D&D) activities.<ref name=":4" />
  • BAE Systems was consulted on certain design changes, specifically the tail.<ref>Template:Cite news</ref> Afterwards the design was put to mathematical and wind tunnel tests. The modified aircraft was expected to complete the spin tests by September 2015, and the production of 85 aircraft for the Indian Air Force to begin.<ref>Template:Cite news</ref>
  • In 2016, the programme and the testing came to a halt after the aircraft “departed from controlled flight” while testing spin characteristics.<ref name=":2" /><ref name=":0" /> Multiple attempts to overcome these issues without a major redesign, including nose strakes, ventral fins and wing fence, had not delivered the desired outcome as wing drops were still observed as soon as the aircraft stalled.<ref name=":7" /> Further changes were done including the removal of nose strakes and wing fence and addition of vortex generators, which were again removed and replaced by two wing fences each side. None of these design alterations provided any improvement.<ref name=":7" />
  • In March 2017, Jane's reported that due to the HJT-36's "unsolvable" issues associated with critical stall and spin characteristics the aircraft is not ready to serve as an intermediate jet trainer for Indian Air Force pilots.<ref name="Bedi Jane's" />
  • With Birhle as a consultant, the air frame was modified to improve spin recovery characteristics. The modified aircraft (IJT LSP4; S3854) flew for the first time on 17 April 2019.<ref>Template:Cite news</ref><ref name=":1">Template:Cite web</ref> Post modifications, a new Anti-Spin Parachute system (ASPS) was developed to ensure safety of the aircraft and test crew during spin flight testing.<ref name=":0" /> The wind tunnel testing facility of France-based ONERA was used to verify the design modifications.<ref name=":7" /><ref>Template:Cite web</ref> Major design changes were executed in the empennage with the vertical fins pushed back by a metre and the rudder extended beyond the vertical stabiliser until the rear fuselage, increasing the control surface area by 30%. Other control surfaces that were added as compared to the original design included nose strakes, ventral fins and a leading edge strakes at the wing root.<ref name=":7" />

2020s

  • As per a report, "The new ASPS was integrated into the aircraft in July 2020 and the successful streaming of the parachutes were demonstrated in September 2020."<ref name=":0" />
  • In February 2021, HJT-36 took-off during Aero India with the newly supplied AL-55I engines with improved features.<ref name=":1" />
  • On 6 January, the IJT has successfully demonstrated the capability to carry out six turn spins to both the left and right hand sides. As of then, the aircraft would require more two years of testing, after which it would be ready for certification. With the help of internal funding, some major modifications were done in the design configuration and, hence, re-demonstration of earlier tests was required.<ref name=":0">Template:Cite news</ref>
  • In February 2025, at the Aero India 2025, HAL renamed the HJT-36 Sitara as the HJT-36 'Yashas'. The renaming was due to its design modification to correct "departure characteristics and spin resistance". The aircraft was recently integrated with "state-of-the-art avionics and an ultra-modern cockpit". This upgrades videos the overall weight of the aircraft and replaced the obsolete foreign line-replaceable units with Indian LRUs.<ref name=":5">Template:Cite web</ref><ref name=":6">Template:Cite web</ref>
  • On 12 February 2025, it was also reported that the Indian Air Force has not placed any order for the updated aircraft but would lease 4 to 5 'Yashas' from HAL. Further orders will be placed if the user was satisfied with its training and operational capabilities.<ref>Template:Cite web</ref>

Design

HJT-36 at Yelahanka Air Force Base in 2005

Airframe

HJT-36 uses light alloys and composites, with a conventional low wing design with 18° leading-edge sweepback and a 9.8m wingspan. It features a hydraulically retractable tricycle-type landing gear. The single-wheeled main units retract inward and the twin nose wheel unit retracts forward. About a quarter of the aircraft's line-replaceable units are common between it and the HAL Tejas trainer variant.

Cockpit

In the cockpit, the HJT-36 has a conventional tandem two-seat configuration with the trainee pilot forward and the instructor in the raised seat to the rear. The single-piece canopy gives both pilots good, all-round vision. The prototype aircraft used Zvezda K-26LT lightweight zero-zero ejection seats. However, these may be replaced with Martin-Baker Mk.16 IN16S seats, due to a price escalation of the former.<ref name="supplier">Template:Cite web</ref> The pilots have both conventional and manual flight controls.<ref name="at-hjt">Template:Cite web</ref>

The trainer has a full glass cockpit with a layout similar to current generation combat aircraft. It uses an integrated digital avionics system from GE Aviation Systems. Head-up display and repeater is produced by Elbit Systems.<ref name="supplier" />

The cockpit features a Stepped-up Rear cockpit with a Drooped Nose enhancing the pilots' situational awareness. The aircraft also features multi-function displays and head-up display. .<ref name=":5" />

Armaments

The aircraft has five external hardpoints for weapons training. There is one center-line hardpoint under the fuselage and two-weapon pylons under each wing for carrying rockets, gun pods, and bombs. The maximum external payload is 1,000 kg.<ref name=":6" />

Propulsion

Template:See also The aircraft features a FADEC-controlled NPO Saturn AL-55I with a thrust of 17.3 kN, providing a high thrust-to-weight ratio with optimised thrust management.<ref name=":5" />

The prototype aircraft was initially powered by a SNECMA Turbomeca Larzac 04-H-20 non-afterburning turbofan developing 14.12 kN of thrust.<ref name=":3" /> However, as stipulated by the 2005 Air Staff Qualitative Requirements (ASQRs) from the Air Force there was a requirement of higher thrust engines.<ref>Template:Cite web</ref>

In April 2005, the Larzac engine was to be replaced by NPO Saturn AL-55I (16.9 kN) to meet training requirements. The AL-55I engine would be a Joint Venture of HAL and NPO Saturn and the deal for the development of the same was signed with Rosoboronexport in August. A funding of Template:INRConvert by the Indian Ministry of Defence was released for the higher thrust engine development.<ref name=":2" /><ref name=":4" />

As per a CAG report on IJT, in February 2014, the engine developed (AL-55I) had a Total Technical Life (TTL) of only 300 hours against the required 3600 hours provided in the ASQR. However, by 2013, it was told that the contract for engine development was fulfilled and the JV intended to increase the TTL to 600 hours though IAF insisted a TTL of 1,200 hours. The increase of TTL was important as ASQR projected a "utilisation rate" of 30 hrs/month per aircraft which meant the engines needed to be replaced every 10 months.<ref name=":4" /><ref name=":3" />

On 14 July 2021, it was reported that the United Engine Corporation had deliver two units of AL-55I engines to HAL for the HJT-36 programme. The life cycle of the improved engines were increased to 1,200 hours . Earlier, 16 engines had been supplied to HAL for the prototypes and limited series production (LSP) aircraft. The engines were reportedly ready for licensed production in India.<ref name=":1" /><ref>Template:Cite web</ref><ref>Template:Cite news</ref> The new engines also had an improved thrust of 17.27 kN and also featured a reduction of over 50 kg weight.<ref name=":3" />

By February 2025, UEC supplied 18 AL-55I engines to HAL for the project. The engines will undergo type certification followed by start of licensed production of the engines by HAL in India.<ref>Template:Cite web</ref><ref>Template:Cite web</ref>

Operators

Template:IND
  • Template:Air force: 12 LSP and 73 series production aircraft on order.<ref name=":4" /> 200-250 planned.<ref name=":3" />

Specifications (HJT-36, prototypes)

Template:Aircraft specs

See also

Template:Portal Template:Aircontent

References

Template:Reflist

Template:Commons category

Template:HAL aircraft