Thameslink is a main line route on the British railway network, running from Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws and Template:Rws via central London to Template:Rws, Template:Rws, Template:Rws, Rainham, Template:Rws, Template:Rws, Template:Rws and Template:Rws. The initial network opened as a through service in 1988 and, as of 2025, currently calls at 135 stations in regular service.<ref>Template:Cite web</ref> The entire route is currently operated by Govia Thameslink Railway. A part of the route, from Template:Rws to Template:Rws, runs 24Template:Nbsphours a day, except on early Sunday mornings and during maintenance periods.<ref name="BedfordLondonTimetable"/>

The Thameslink Programme was a major £7Template:Nbspbillion scheme to increase capacity on the central London section by accommodating more frequent and longer trains, and providing additional routes and destinations.<ref name="NAO2017">Template:Cite report</ref> The programme was divided into three key phases, with the final Key Output 2 introducing world-first Automatic Train Operation (ATO) technology over European Train Control System (ETCS) Level 2, enabling 24 trains per hour through the core section.<ref name="ThameslinktechnicalPaper">Template:Cite report</ref> The new services began operating in 2018, though the full projected timetable of 24 trains per hour has never been achieved. In 2016, new Template:Brc trains started operating on the route and replaced the Template:Brc, Template:Brc and Template:Brc trains which were withdrawn and transferred elsewhere.

Passenger services on the Thameslink route, along with all others currently operated by Govia Thameslink Railway, are due to transfer to the publicly owned operator Thameslink Southern Great Northern on 31 May 2026.<ref>Template:Cite web</ref>

Route

Much of the original route is over the Brighton Main Line (via London Bridge) and the southern part of the Midland Main Line, plus a suburban true loop (circuit) serving Sutton. A branch via the Catford Loop Line to Sevenoaks was added in 2012. Sections to Peterborough on the East Coast Main Line, Cambridge via the Cambridge Line, Horsham on the Arun Valley line and Rainham via Greenwich were added in 2018. East Grinstead and Orpington are also served during peak hours.

The route through central London (today known as Thameslink core) is via St Pancras International for connections to Eurostar and the East Midlands; Template:Stn, for London Underground Circle, Metropolitan and Hammersmith & City lines, and the Elizabeth line; Template:Rws, which replaced the demolished Holborn Viaduct station and has a southern entrance serving Ludgate Circus; Template:Stn, for main-line rail services and the Underground District and Circle lines; and Template:Stn for main-line links into Kent and Sussex and the Underground Northern and Jubilee lines. Template:Rws on Pentonville Road closed on 8 December 2007.

Trains operating the "main line" service (Bedford and Cambridge to Brighton, Peterborough to Horsham) include first-class accommodation; those operating from Luton, St Albans and Kentish Town to Sutton, Sevenoaks and Orpington are usually standard class only. When Govia operated the original Thameslink franchise these services were designated "Thameslink CityFlier" and "Thameslink CityMetro" respectively, but First Capital Connect dropped this branding. Govia Thameslink Railway now refers to these services as Route TL1 (formerly Route 6) and Route TL2/TL3 (formerly Route 7/8) respectively.

Services

Logo used by the service operator

Off-peak

<section begin="service-table-off-peak"/> The Monday–Friday off-peak service pattern, with frequencies in trains per hour (tph), includes: Template:Clear left

Thameslink Monday–Friday off-peak service pattern
Route Template:Abbr Calling at
Template:Rws to Template:Rws<ref name="BedfordLondonTimetable">Template:Cite web</ref><ref name="LON-BTN" /> 2 Template:Cslist
Bedford to Three Bridges via Redhill<ref name="BedfordLondonTimetable"/><ref>Template:Cite web</ref> 2 Template:Cslist
  • In the evening, this service only runs between Luton and Three Bridges
Template:Rws to Template:Rws via Redhill<ref name=":0a" /><ref>Template:Cite web</ref> 2 Template:Cslist
Cambridge to Template:Rws<ref name=":0a">Template:Cite web</ref><ref name="LON-BTN">Template:Cite web</ref> 2 Template:Cslist
London Blackfriars to Template:Rws via Catford and Otford<ref name="7oaks">Template:Cite web</ref> 2 Template:Cslist
Luton to Template:Rws via Greenwich<ref name="7oaks" /><ref>Template:Cite web</ref> 2 Template:Cslist
  • In the evening, this service only runs between Kentish Town and Rainham
St Albans City to Template:Rws via Template:Rws (loop)<ref name="BedfordLondonTimetable"/><ref name="SUO&WIM">Template:Cite web</ref> 2 Template:Cslist
  • Services then continue to/from St Albans City via Mitcham Junction (see below)
St Albans City to Sutton via Template:Rws (loop)<ref name="BedfordLondonTimetable"/><ref name="SUO&WIM" /> 2 Template:Cslist
  • Services then continue to/from St Albans City via Wimbledon (see above)

<section end="service-table-off-peak" />

Peak hours

<section begin="service-table-peak-hours"/> During peak hours, the two trains per hour London Blackfriars to Sevenoaks service (from the table above) is extended through the 'core section' to/from Template:Rws (though a few services originate at Finsbury Park), with extra calls at City Thameslink, Farringdon, St Pancras International, Finsbury Park, Template:Rws, Template:Rws, Template:Rws, Template:Rws and Template:Rws.<ref name="7oaks"/><ref>Template:Cite web</ref>

As well as these services, during peak hours, several extra trains in each direction (approximately two trains per hour) run to/from Template:Rws (originating/terminating at either London Blackfriars, Luton, West Hampstead Thameslink or Kentish Town), all calling at Template:Rws in lieu of stations from St Mary Cray to Bat & Ball.<ref name="7oaks"/>

In addition, there are seven trains per day in each direction that operate to/from Template:Rws (originating/terminating at either Bedford, West Hampstead Thameslink, St Pancras International or London Bridge), which, after calling at South Croydon, call at Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws and Template:Rws.<ref>Template:Cite web</ref>

During peak hours, Peterborough to Horsham services call at Faygate between Ifield and Littlehaven, providing the primary service to this station.<ref>Template:Cite web</ref>

There are also three extra trains throughout the evening peak hours that operate from Gatwick Airport to Bedford in that direction only, calling at various stations.<ref>Template:Cite web</ref> <section end="service-table-peak-hours"/>

History

Conceptual origins and post-war planning (1941–1970s)

The strategic concept for a north–south through-running railway in London has deep historical roots, predating the Thameslink name by decades. Passenger services operated across London through the Snow Hill tunnel from mid-Victorian times until World War I, when services were withdrawn as inner-London traffic shifted to buses and trams.<ref name="SubBrit">Template:Cite web</ref>

On 14 June 1941, railway manager George Dow proposed in an article in The Star a series of electrified, underground main-line routes to interconnect London's termini, arguing that "London suburban lines cannot play their full part... until they have been interconnected across London and electrified".<ref>Template:Cite book</ref> This vision was further developed in the post-war County of London Plan (1943) and Greater London Plan (1944). A 1949 working party identified a high-priority "Route A" that closely resembled the future Thameslink, designed to integrate suburban services and relieve Underground congestion. These ambitious plans were shelved due to post-war austerity, and the Snow Hill Tunnel route remained open only for cross-London freight trains until 1970.<ref name="SubBrit"/>

Overhead electrification, completed in 1982, allowed the northern section to run as the Midland City Line from Bedford via the Midland Main Line to St Pancras, and via the City Widened Lines to Moorgate.Template:Efn

"Snow Hill Link": a pragmatic revival (1980s)

The concept was revived in the early 1980s as a pragmatic, low-cost project, driven by the new Network SouthEast (NSE) sector of British Rail. Established in 1986 under director Chris Green, NSE moved away from a geographically based management structure towards a business-led approach focused on customer markets and reducing public subsidy.<ref name="Green1987">Template:Cite journal</ref> The reactivation of the disused Snow Hill Tunnel was identified by NSE as a key project that could better utilise existing assets and create new travel opportunities.<ref name="Green1987"/> A 1984 feasibility study commissioned by the Greater London Council (GLC) had found that the tunnel could be reopened for as little as £7–12 million.<ref name="GLCPlan">Template:Cite news</ref><ref name="King1984">Template:Cite news</ref>

The project faced significant institutional resistance. London Transport initially blocked the Parliamentary legislation required for the project, officially due to a dispute over land at Farringdon, but with the "suspicion... that it fears extra competition."<ref name="RailLinkEditorial">Template:Cite news</ref> An editorial at the time called for the Transport Secretary to "bang BR and LT heads together to get this scheme on the rails as fast as possible."<ref name="RailLinkEditorial"/> Ultimately, the project received government approval with the passage of the British Rail Bill in 1986, which provided for the reopening and electrification of the tunnel to link the Midland and Southern Regions.<ref name="GoAhead">Template:Cite news</ref>

1988 launch and initial impact

The Snow Hill tunnel was re-opened by British Rail to passenger trains after 72Template:Nbspyears, with the first Thameslink services beginning in May 1988.<ref name="SubBrit"/> Marketed as a solution to the "dodge-the-chaos" strain of changing trains in central London, the service was an immediate success.<ref name="ExpressDrive">Template:Cite news</ref> Passenger demand quickly quadrupled initial projections, leading to severe overcrowding by 1998.<ref>Template:Cite press releaseTemplate:Dead link</ref> The new link also had a significant economic impact, with one contemporary report noting it led to a "home price boom" in areas north of London like St Albans.<ref>Template:Cite news</ref>

On 29 January 1990, the section between Blackfriars and Farringdon was temporarily closed to permit the construction of a new alignment. The route through the site of the long-closed Ludgate Hill station, over Ludgate Hill to Holborn Viaduct was abandoned and demolished. The replacement route under Ludgate Hill was opened on 29 May 1990 by the Network SouthEast (sector of British Rail) concurrently with Template:Stnlink station, which was initially called St Paul's Thameslink but was renamed in 1991 to avoid confusion with St. Paul's Underground station, about Template:Convert away.

King's Cross Thameslink on Pentonville Road closed on 8 December 2007, when the Thameslink platforms at nearby St Pancras opened.

Service evolution

In the south the services divide: many main-line trains run almost due south through London Bridge to East Croydon and many continue to Brighton, but the other routes and branches evolved, as follows:

  • From 1988 to 1991 such trains went variously
    • via Bromley: to Orpington or to Sevenoaks, (both since resumed) or;
    • via Herne Hill and East Croydon to Purley (off peak only).
  • From 1991 to 1994, such trains went only via Elephant & Castle and Streatham to West Croydon, Wallington, Sutton, Epsom, Leatherhead and Effingham Junction, to Guildford.
  • From 1994 to 1995 such trains terminated at West Croydon (cutting franchise zone-crossing due to rail privatisation).
  • From 2018 the service was greatly recast and expanded following the completion of the Thameslink programme:
    • A regular service to Rainham has been added.
    • A regular service to Horsham has been added.
    • In the north the present termini of the trains are Luton, Bedford, Cambridge, Peterborough, St Albans and in peak hours, Welwyn Garden City.

Franchise operators

As of the early 1990s privatisation of British Rail, Thameslink was franchised to Thameslink, a subsidiary of Govia.

By late 1998, more than 28,000 passengers were carried at morning peak times.<ref>Template:Cite press releaseTemplate:Dead link</ref>

From 1 April 2006, the franchise was taken over by First Capital Connect along with some services that had been operated by WAGN.<ref>Template:Cite press release</ref><ref>Template:Cite news</ref> The branding of most trains, stations, and signs was changed to match the name of the new company, but City Thameslink and West Hampstead Thameslink were not renamed as Thameslink referred to the route.Template:Efn After criticism of the loss of the apt name for this group of routes,<ref>Template:Cite web</ref> First Capital Connect's publicity began calling this set of services its "Thameslink route" to distinguish it from the former WAGN services.

On 14 September 2014, Govia Thameslink Railway took over operations from First Capital Connect.<ref name="DFT20140523">Template:Cite press release</ref>

Template:Main

St Pancras International Thameslink platforms opened in 2007
Blackfriars new cross-river platforms

The Thameslink Programme was a major £7 billion infrastructure project designed to address the severe overcrowding that had developed on the original 1988 route. The programme comprised infrastructure works totalling £5.5 billion (2017 prices) and new rolling stock with lease costs of £1.7 billion.<ref name="NAO2017"/>

Network Rail obtained planning permission and legal powers in 2006,<ref>Template:Cite press release</ref> funding was secured in July 2007<ref>Template:Cite magazine</ref> and construction began in October 2007.<ref>Template:Cite news</ref>

The infrastructure budget increased by £474 million (9.4%) from the original 2012 budget, primarily due to unforeseen complexities at London Bridge station. London Bridge station's long history of development and bomb damage during World War Two meant that much of the site was inadequately documented, requiring design changes and accelerated works to maintain the project schedule.<ref name="NAO2017"/>

Plans included rebuilding the station buildings at Farringdon (in conjunction with the Crossrail project) and West Hampstead Thameslink, total rebuild of London Bridge and Blackfriars stations, two new underground platforms at St Pancras International, a new tunnel north of St Pancras International to the East Coast Main Line to allow through services to Peterborough and Cambridge, and platform lengthening. A new 8- and 12-carriage fleet of Class 700 trains began in 2016. The new services on to the Great Northern route began initially on 8 March 2018,<ref>Template:Cite news</ref> with the full timetable introduced in December 2019, one year later than originally planned to manage risks associated with introducing the complex service changes.<ref name="NAO2017"/>

The programme also identified the need for an additional £900 million of maintenance and renewals work to ensure the wider rail network could reliably support the new high-frequency services, though initial funding covered only £300 million of this work.<ref name="NAO2017"/>

The London and South East Route Utilisation Strategy published in July 2011 laid out a provisional 24Template:Tooltip timetable. South of London it would provide four trains to Brighton (one semi-fast, one stopping) and two each to Three Bridges, Horsham, East Grinstead, Caterham, Tattenham Corner, Tunbridge Wells, Ashford International, Maidstone East, Sevenoaks and Bellingham. North of London there would be eight semi-fast trains to Bedford, four stopping trains to St Albans, two stopping and two semi-fast trains to Luton, two semi-fast trains to Peterborough, two semi-fast trains to Cambridge and four stopping trains to Welwyn Garden City.<ref>Template:Cite report</ref>

Below is a provisional timetable solely for services running through the 'Thameslink core' tunnel. This 'provisional timetable' was proposed before the upgrade and has not yet been achieved. See Services section above for the current service pattern. Template:Clear {{#section:Thameslink Programme|provisional-timetable}}

Rolling stock

Template:Main

All rolling stock used on Thameslink is electrically powered dual-voltage units using Template:Nowrap overhead power north of Farringdon and 750Template:NbspVTemplate:NbspDC third rail to the south.Template:Ref

Current fleet

Class 700

Class 700 at Blackfriars
Interior of the Thameslink Class 700 trains

Class 700 trains were delivered between 2015 and 2018, providing an additional 14,500 seats.Template:Clarify<ref>Template:Cite news</ref> Siemens Mobility was named preferred bidder on 16 June 2011, with the Desiro City train family.<ref name="rgi20110616">Template:Cite news</ref> The contract was signed in June 2013<ref>Template:Cite news</ref> for 1,140 carriages, with 55 twelve-car and 60 eight-car trains. The depots are at Hornsey and Three Bridges.<ref name="rgi20110616" /> The Three Bridges depot opened in October 2015 and the first trains entered service in spring 2016. All units are now in service, having replaced the Class 319 and Class 387 fleets. Template:Table alignment

Family Class Image Type Top speed Number Carriages Routes operated Built
mph km/h
Siemens Desiro 700 Desiro City EMU 100 161 60 8 All Thameslink services 2015Template:Ndash2018
55 12
Template:Scalable imageTemplate:Scalable image

Past fleet

Class 319

Class 319 at St Albans

The first rolling stock used on Thameslink were the 86 Class 319 trains built between 1987 and 1990. These are electrically powered dual-voltage four-car units rated to carry 289, 308 or 319 passengers. Four Class 319 trains had been transferred from Southern in December 2008 and the last four followed in March 2009, from which point they were all on Thameslink. The last was withdrawn in August 2017.<ref>Template:Cite news</ref>

Class 377

First Capital Connect acquired 23 four-coach Class 377 sets during 2009 on sublease from Southern, for the Thameslink route for additional capacity and to allow some of the Class 319 trains to be released for the Catford Loop service to Sevenoaks, now jointly operated with Southeastern under Key Output 0 of the Thameslink Programme.<ref>Template:Cite web</ref>

Class 317

Class 317 units built in the early 1980s were still in use when services into Moorgate ceased in March 2009: the last timetabled service ran from Farringdon to Bedford on 9 October 2009.Template:Cn

Class 387

Due to delays in the new Class 700 fleet, the DfT and Southern ordered 116 electric dual-voltage Template:Cvt carriages (29 trains) with the option for another 140 carriages (35 trains).<ref name="DfT">Template:Cite web</ref><ref name="Southern">Template:Cite press release</ref> The tender for the new Template:BRC trains was won by Bombardier and the first set entered service in December 2014, with all in service by May 2015. By 2018, all units were replaced by the new Class 700 fleet with the Class 387 fleet moving over to the Great Northern brand.<ref>Template:Cite magazine</ref>

2014 franchise

The invitation to tender for the Thameslink, Southern and Great Northern franchise was expected to be issued in October 2012, with the contract commencing in September 2013. In March 2012, the Department for Transport announced Abellio, FirstGroup, Govia, MTR Corporation and Stagecoach Group had pre-qualified to bid for the franchise.<ref>Template:Cite news</ref>

Due to problems with the InterCity West Coast tendering process, the process was delayed, with the new franchise delayed until September 2014. The new franchise includes the South Central franchise currently operated by Southern and certain routes from the Integrated Kent Franchise currently operated by Southeastern.<ref>Template:Cite web</ref>

In May 2014, it was announced that the franchise has been awarded to Govia Thameslink Railway.<ref>Template:Cite news</ref> The new Thameslink Southern & Great Northern franchise<ref name="DFT20140523"/> will include both the Thameslink Great Northern and South Central franchises.

Govia Thameslink Railway began operations on 14 September 2014, with the former First Capital Connect routes Thameslink and Great Northern.

Railfuture, an organisation campaigning for better rail services for passengers and freight, has proposed an additional north–south route, connecting the Brighton Main Line to routes north of London, via East Croydon, Lewisham, Canary Wharf, and Stratford.<ref>Template:Cite web</ref>