Central Australia Railway

From Vero - Wikipedia
Jump to navigation Jump to search

Template:Short description Template:About Template:Use Australian English Template:Use dmy dates Template:Infobox rail line {{#invoke:Infobox|infobox}}Template:Template other

The former Central Australia Railway, which was built between 1878 and 1929 and dismantled in 1980, was a Template:Convert 1067 mm narrow gauge railway between Port Augusta and Alice Springs.<ref name=":2">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> A standard gauge line duplicated the southern section from Port Augusta to Maree in 1957 on a new nearby alignment. The entire Central Australia Railway was superseded in 1980 after the standard gauge Tarcoola–Alice Springs Railway was opened, using a new route up to 200 km to the west. A small southern section of the original line between Port Augusta and Quorn has been preserved and is operated as the Pichi Richi Railway.

Naming

The line became known as the Central Australia Railway when the Commonwealth Railways took it over from the South Australian Railways in 1929. Before then, it was known by several names, in part because the northern end point had not be determined, funding being intermittent. Government acts and the press used a number of terms prior to construction including:

  • Port Augusta Railway
  • Northern Railway
  • Great Northern Railway
  • Port Augusta to (far) North Railway.

After construction, railway was referred to as:

It has also often been referred to as the Great Northern Railway<ref>Template:Cite news</ref> in the 1890s and into the twentieth century. The most southern part of the line between Port Augusta and Quorn is now referred to as the Pichi Richi Tourist Railway.

Another colloquial name used was The Ghan, after the passenger train that utilised the line. It is suggested that The 'Ghan name is in recognition of the Afghan Cameleers that plied their trade in the area well before the railway; however, see The Ghan (Etymology) for alternatives. This colloquial term for the railway appears to have been widely in use from at least the early 1930s;<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}Template:Dead link</ref> it may have been in use prior to this. The new Adelaide–Darwin railway line initially used The New Ghan as a trading name. It has now reverted to The Ghan, relegating the original line name colloquially as The Old Ghan.<ref>Template:Citation</ref>Template:Page needed<ref>Template:Citation</ref>Template:Page needed

History

Template:Vertical align rows

Template:Larger<ref name=Browne>Template:Cite book</ref>Template:RpTemplate:Spaces<ref name=IntoThePass>Template:Cite book</ref>
Year Date Event
1853 First recorded wagon (hauled by bullocks) through Pichi Richi Pass.
1854 Town of Port Augusta surveyed.
1854 18 May Goolwa to Port Elliot horse-drawn railway opens.
1854 South Australian Government begins program of railway construction.
1856 19 April Adelaide to Port Adelaide line opens.
1857 5 October Adelaide–Gawler line opens.
1857 Surveyor-General Goyder inspects construction of the road through Pichi Richi Pass.
1862 Act of Parliament passed, offering land grants in exchange for constructing a railway north from Port Augusta. Goyder advises that a railway through Pichi Richi Pass is "not practical".
1863 Control of the Northern Territory is handed from New South Wales to South Australia.
1864 SA Parliament passes the Waste Lands Act granting licences to squatters on northern pastoral lands.
1865–1866 Severe drought in SA.
1865 Goyder defines the boundary of arable land in SA.
1869 Government passes the Strangways Act allowing credit to purchase farming land in the north of SA.
1870 29 August Adelaide and Burra Railway opens.
1870 Government offer of land in return for constructing northern railway.
1870 Survey for Port Augusta and Northern Railway looking at alternative routes. Completion of Overland Telegraph Line to Darwin.
1873–1877 Boom agricultural years in Mid-North.
1877 Construction starts on the Port Augusta and Government Gums Railway. Equipment stockpiled at Port Augusta.
1878 18 January Official "turning of the first sod" of the Port Augusta and Government Gums Railway at Port Augusta by state governor Sir William Jervois.
1879 19 June First shipment by rail from Quorn to Port Augusta.
1879 15 December Line opens from Port Augusta to Quorn.
1880 28 June Line opens from Quorn to Hawker.
1880–1882 Drought conditions cause crop failures in Willochra area.
1881 1 July Railway opens to Beltana.
1882 18 April First train arrives at Farina (previously named Government Gums).
1882 17 May Official opening of the Port Augusta and Government Gums Railway and Terowie to Quorn Railway at Quorn by Governor Sir William Jervois.
1884 13 January Hawker Railway Station burns down. Replaced by current stone station building.
1884 7 February Railway extended to Hergott Springs by contractors Moorhouse, Robinson and Jesser.
1885–1891 Deviations constructed in Pichi Richi Pass to ease curves.
1887 Public meeting in Adelaide called for bridges at Strangways Springs and Peake Creek to be purchased locally rather than cheaper English bridges. Cost difference was £11,944 v. £8145.
1888 1 February Railway extended to Coward Springs by Engineer-in-Chief South Australia, using unemployment relief labour.
1889 1 June Railway extended to William Creek. More sharp curves in Pichi Richi Pass eased by deviations.
1889 1 November Railway extended to Warrina by SA Government unemployment relief scheme.
1891 7 January Railway extended to Oodnadatta by SA Government unemployment relief scheme.
1891–1892 Severe recession in Australia.
1892 17 December Y class loco no. 141 is allocated to the Northern Division of the SAR. (It was later modified to a Yx class and is now at the Pichi Richi Railway.)
1904 2 May Tenders called for extension of railway from Oodnadatta to Pine Creek, Northern Territory. The contract was not signed: the federal government blocked the employment of Chinese labourers.
1911 1 January South Australia hands the Northern Territory to the Commonwealth Government, including the Great Northern Railway. The South Australian Railways continues to provide trains and staff for the time being, with the Commonwealth bearing losses and liabilities.
1911 January Loco Y141 derails near Brachina due to washout, killing the driver.
1912 14 September Construction starts on the Trans-Australian Railway from Port Augusta to Kalgoorlie.
1914 28 March Boiler of Y class locomotive explodes at Cudmore Hill near Port Augusta.
1914 28 July World War I starts.
1917 17 October Opening of the Trans-Australian Railway.
1918 Hergott Springs renamed as Marree.
1918 11 November End of World War I. Global influenza pandemic follows.
1921 4 June SAR rolling stock, including the "Coffee Pot", sold to Commonwealth Railways.
1923 Sleeping car introduced between Terowie and Marree. An SAR employee at Quorn jokingly names the train to Oodnadatta The Afghan Express, which is eventually shortened to The Ghan.
1925 June Delivery of the first two NM class steam engines (NM15 and 16).
1926 1 January Commonwealth Railways takes over operation of the Great Northern Railway and names it the Central Australia Railway.
1926 Alternative routes considered for extension to Stuart.
1926 Algebuckina bridge strengthened for NM class locos. Deviation used, but soon damaged twice by flood waters.
1927 21 January Template:Convert line built from Oodnadatta to Wire Creek, which becomes construction base for the Template:Convert extension to Stuart.
1928 23 December Opening of line to Rumbalara railhead.
1929 2 August Line completed to Stuart. First passenger train hauled into Stuart by NM35 on 6 August.
1929 Commonwealth Railways changes name of Stuart railway station to Alice Springs.
1930 17 January Finke River bridge destroyed by floodwaters. Traffic suspended for seven weeks until March 1930. Deviation built downstream.
1930 Completion of mechanical engineering workshops at Port Augusta.
1937 26 July Standard-gauge line between Port Pirie and Port Augusta completed.
1938 Major flooding north of Oodnadatta. Railway closed for several weeks.
1939 3 September World War II commences.
1942 New loco shed and Kennicott water treatment plant constructed at Quorn. New sheds also built at Marree, Oodnadatta and Alice Springs.
1943 19 February Head-on collision at Strangways between two freight trains. No fatalities.
1944 11 May Crash near Copley. Freight train hauled by NM25 runs into the rear of troop train; four soldiers killed.
1944 Leigh Creek coal trains start. Coal goes via Quorn (narrow gauge) then Terowie to Adelaide (broad gauge).
1945 September World War II ends.
1946 Major flooding. Food dropped by air to stranded Ghan.
1949 Ghan sleeping car service suspended due to coal shortages.
1949 15 December Commonwealth Railways commissioner recommends construction of a standard-gauge railway from Stirling North to Leigh Creek.
1951 Diesel-electric locos ordered (NSU class).
1951 27 August Construction commences on Brachina to Leigh Creek standard-gauge line.
1952 4 July Royal Commission report recommends Brachina to Stirling North route west of the Flinders Ranges for new standard-gauge line, bypassing Quorn and Hawker.
1954 Playford power station opens at Port Augusta. Narrow-gauge coal trains operate through Pichi Richi Pass.
1954 June Arrival of first NSU diesel locos.
1954 24 June First diesel-hauled Ghan departs Quorn hauled by NSU 51 and 52.
1954 November Arrival of first NDH "Gloucester" railcars to operate Port Augusta to Marree passenger service.
1955 14 February Destruction of Hookina Bridge by floodwaters.
1955 28 May Standard-gauge line to Brachina completed. "Piggyback" trains commence on 4 June for coal and cattle trains (until 25 June 1956).
1956 17 May Standard-gauge line completed to Leigh Creek coalfield.
1956 10 July New schedule has southbound Ghan passengers transferring to standard-gauge railcars at Brachina.
1956 13 August Last narrow-gauge Ghan through Pichi Richi Pass. Passengers travel by standard-gauge train from Port Augusta to Copley. Copley becomes transfer station for freight and passengers.
1956 4 October Narrow-gauge line Hawker to Copley closed. Rails then lifted.
1957 29 June Standard-gauge railhead reaches Marree.
1957 27 July Official opening of the standard-gauge line to Marree.
1958 26 March Narrow-gauge line between Copley and Marree closed. Rails then lifted. Marree becomes transfer station between standard-gauge and narrow-gauge lines.
1961 Pedirka sandhills deviation completed.
1965 24 April First NT class diesel-electric locos in service. All were later transferred to Darwin; they returned south after the North Australia Railway closed in 1976.
1967 February & March Severe flooding. Low-level Finke River bridge destroyed.
1968 Saltia bridge in Pichi Richi Pass hit by over-height truck.
1969 29 January Last passenger service to Quorn from Terowie.
1970 8 January Last regular freight service between Quorn and Hawker.
1970 November Survey of Tarcoola to Alice Springs line commences.
1971 28 April NJ diesel-electric locomotives introduced. NJ1 named Ben Chifley.
1972 17 September Stirling North to Hawker line officially closed.
1973 July Pichi Richi Railway Preservation Society formed.
1974 Second low-level bridge at Finke destroyed by floodwaters.
1974 20 July First steam-hauled train on the new Pichi Richi Railway.
1975 12 April Construction commences on Tarcoola to Alice Springs line. First sod turned by Prime Minister Gough Whitlam at Tarcoola.
1975 1 July Commonwealth Railways becomes Australian National Railways (ANR), a new federal government agency.
1978 1 April ANR takes over the South Australian Railways and Tasmanian Government Railways.
1980 9 October Tarcoola–Alice Springs line opens; first standard-gauge train northward.
1980 25 November Last narrow-gauge Ghan from Marree to Alice Springs. Locos NJ3 and NJ6.
1980 11 December First standard-gauge Ghan to Alice Springs.
1980 December Last revenue train to Oodnadatta.
1981 17 October Last train on Peterborough–Quorn line, by Steamtown Peterborough.
1982 Rails between Alice Springs and Marree removed.
1987 10 June Standard-gauge line from Leigh Creek to Marree closed and rails lifted.
1995 4 June Standard-gauge line between Adelaide and Melbourne opens.
2001 17 July Construction commences on Alice Springs–Darwin line.
2001 September Pichi Richi Railway extended to Port Augusta.
2003 18 September Standard-gauge line reaches Darwin.
2004 3 February First standard-gauge Ghan arrives at Darwin from Adelaide.
2007 19 January Wirreanda Creek bridge at Gordon destroyed by floodwaters.
2013 Abminga railway station area listed in state heritage list.
2016 27 April Last coal train from Leigh Creek to Port Augusta.
2016 May Port Augusta power stations closed and demolished. Port Augusta to Leigh Creek railway mothballed.

Initial proposal

From the proposal for a line heading north of Port Augusta to turning the first sod in 1878 took 18 years<ref>Template:Cite news</ref> and the process was referred to by the press as one "which has so far failed to extend itself out of the region of nebulous ideas.".<ref>Template:Cite news</ref>

The key issues reported at the time were as follows.

Cost benefits

Significant debate about the cost delayed and eventually altered the final design. The costs were significant for the South Australian colony and there was rigorous debate over that period. Mineral extraction was touted as the key benefit,<ref>Template:Cite news</ref> with farming and passenger traffic deemed by many as being uneconomic alone although others suggest the key products were 'wool, station stores, and copper' in that order.<ref name=":0">Template:Cite news</ref> The cost per kilometre was set in the Acts which precluded more expensive options.Template:Citation needed

Gauge and minimum speed

There was fierce debate about the gauge of the line, the maximum weight to be carried and maximum speed as all three dictated the cost.

Route and end point

A multitude of routes and end-points were nominated with over a dozen potential routes explored, most of these to the north. End points that were discussed included Government Gums (Farina, South Australia (320 km), Yudnamutana, South Australia (390 km) and Beltana (232 km). The 1867 Act stated that the line would be 200 miles from Port Augusta. Newspapers of the time did mention extending the line to Port Darwin although this was not gazetted in Parliament.

Funding: public or private sector

The South Australian Railways, as the agent of the colonial government, wanted to build the line, and there were others who thought that investors, predominantly from the United Kingdom, would offer better value for money. The South Australian Railways developed a trial called the Northern Extension Railway to Burra to test the engineering capabilities.<ref>Template:Cite news</ref>

Legislation

The following Acts were passed by the parliament of South Australia and, after federation in 1901, the Australian parliament.

Template:Larger
Year Act Juris-diction Key provisions
1862 citation CitationClass=web

}}</ref>||SA||

  • Carriage of passengers, merchandise and produce between Port Augusta and some point (not less than 100 miles) northwards.
  • First 20 miles to be completed in two years, remainder in five years.
  • Speed was to be a "rate of not less than eight miles an hour for the whole distance travelled, including stoppages (luggage trains excepted)".
  • Propulsion was to be either horse or steam locomotive.
  • Two passenger and two goods trains were to be provided at least twice a week, one way, for the entire length.
  • All military, police, and other forces, when proceeding on duty, and all public mails and public stores, or stores belonging to a public department, were to be conveyed in the ordinary trains free of charge.
  • in the event of war or civil commotion, the whole of the resources of the railway were to be placed at the disposal of the government at the charges actually incurred.
  • The company would be entitled to a grant of the land traversed by the railway for a breadth of two chains, and to grants of contiguous blocks of land up to 20 square miles at the rate of two square miles for every mile traversed by the railway.
1864 citation CitationClass=web

}}</ref>||SA||

  • Similar to the 1862 Act.
  • Purpose was "to encourage the formation of railways northwards from Port Augusta, or Port Paterson, with a branch line between those ports".
  • Land grant increased to four square kilometres with some limitations.
1864 citation CitationClass=web

}}</ref>||SA||

  • Authorised SA Government to sell any railway or tram line; reflected lack of commitment to financing railways in South Australia.
1867 citation CitationClass=web

}}</ref>||SA||

  • Length of railway was extended to at least 200 miles from Port Augusta; costs "shall not exceed 3750 pounds for every mile"; land grants removed.
  • Gauge "shall be five feet and three inches".
  • Horse drawn or steam engine propulsion were still alternatives.
1876 citation CitationClass=web

}}</ref>||SA||

1883 citation CitationClass=web

}}</ref>||SA||

  • Specified a narrow gauge of "three feet six inches" for the Palmerston and Pine Creek railway (i.e., what was to become the northern part of the Central Australia Railway).
1902 citation CitationClass=web

}}</ref>||SA||

1907 citation CitationClass=web

}}</ref>|| SA||

1910 citation CitationClass=web

}}</ref>||Cth||

  • Federal legislation to confirm the 1907 Act. Specified a line from Port Darwin to be constructed to meet the Port Augusta (Central Australia) Railway at the South Australian border and be referred to as The Transcontinental Railway. No start or completion date included.
1949 citation CitationClass=web

}}</ref>||Cth||

  • Authorised a Commonwealth–SA agreement for railway gauges in SA to be converted to standard gauge on grounds of defence and development of Australia, facilitation of interstate trade and commerce, and to secure maximum efficiency and economy in railway operation – financed 70 per cent Commonwealth, 30 per cent SA. In a supplementary provision in the Schedule, the Commonwealth undertook to standardise the Central Australia Railway and North Australia Railway and to build a new standard-gauge railway to close the Alice Springs–Birdum gap.
1950 citation CitationClass=web

}}</ref>||Cth||

  • Authorised an agreement between the Commonwealth and SA for the federal government to construct a railway "as soon as practicable" from Brachina to Leigh Creek North Coalfield; acknowledged that the limited capacity of the narrow-gauge line to transport coal to the impending Port Augusta power station necessitated a standard-gauge railway. (The Act provided only for 60 per cent of the required distance from the coalfield to Port Augusta; objection by the South Australian Government to the alignment of routes further south led to a royal commission being appointed.)
1950 citation CitationClass=web

}}</ref>||Cth||

  • Appointed a royal commission to investigate which of two routes were more suitable for the construction of a standard gauge railway between Stirling North and Brachina. Specific factors ordered to be taken into account included the proposed conversion to standard gauge of the railway from Port Augusta to Alice Springs; the cost of construction, maintenance and comparative economics of the respective routes; the probability of increased tonnage of coal hauled from Leigh Creek and the consequential financial results on the cost of constructing and operating railways on the respective routes. Consideration of "any break-of-gauge station required at the northern terminus of the standard gauge line" was explicitly excluded.
1952 citation CitationClass=web

}}</ref>||Cth||

  • Authorised the Commonwealth Railways to construct a standard-gauge railway from Stirling North to Brachina. Specified that the total cost of this railway and the previously authorised Brachina to Leigh Creek North Coalfield railway, including the cost of rolling stock, was not to exceed 11  million pounds. (This Act provided for the remaining 40 per cent of the distance from the coalfield to Port Augusta, the SA Government having accepted the findings of the royal commission, causing a delay of 24 months.)
1954 citation CitationClass=web

}}</ref>||Cth||

  • Authorised the standard-gauge line to be extended to Marree, subject to agreement by the SA Government. Specified that the total cost of this railway and the two railways previously authorised was not to exceed 12.241 million pounds.
1974 citation CitationClass=web

}}</ref>||Cth||

1997 citation CitationClass=web

}}</ref>||SA||

  • Committed South Australian Government funding up to $125 million (plus $25 million if necessary for contingencies, and $26.5 million to underwrite any loans) to the Alice Springs to Darwin railway. Included the South Australian and Northern Territory governments' acknowledgement of various mutual obligations.

Construction

Design, construction, as well as a hiatus, occurred in four periods distinct under both South Australian and Federal Australian Governments over a fifty-year period.

Initial design and route

Remaining trackbed of the Central Australia Railway near Lake Eyre South after the rails were lifted in 1981. Much of the Template:Convert railway was laid on bare earth without ballast.

Around 1871, there was general agreement between Robert C. Patterson, Assistant Engineer (report writer), H. C. Mais, (Engineer-in-Chief) and Surveyor General. George Goyder (creator of the Goyder line of rainfall) about the length and route of the railway.<ref name=":0" /> All three could not see going further north than Beltana (232 km) due to rain fall and environment, The two options out of Port Augusta were the Western Plains and the Pichi Richi routes.<ref>Template:Cite journal</ref> The Pichi Richi route, while more expensive, offered access to the farmland to the west.

An extensive permanent survey was conducted circa 1876 and the final route mapped to Government Gums due to the water available at the terminus.<ref name=":1">Template:Cite news</ref> The length was to be "198 miles 66.92 chains", and the route consisted of "no less than 64 bridges, ranging in length from 20 feet to 740 feet, 470 flood-openings from 10 to 40 feet wide, 550 culverts from 2 feet 6 inches to 10 feet wide, 61 pipe-drains, and 14 water courses".<ref name=":1" />

Initial build to Farina (Government Gums)

The first sod was turned at Port Augusta on 18 January 1878 and took until 1882 to reach Government Gums (320 km), 1884 Maree (372 km), 1888 Coward Springs (501 km) and finally Oodnadatta in 1891 (770 km). Construction was by South Australian Railways as a Template:RailGauge narrow gauge railway.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Citation</ref>Template:Page needed

Cessation of work

Between 1891 and 1926, the railway line was not extended. Discussion occurred about whether the existing line should be extended or a Template:Track gauge standard-gauge railway from Tarcoola should be initiated.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> The South Australian Railways were transferred to the Australian federal government on 1 January 1911, but because the federal government at that stage did not possess a railway department, the South Australian Railways continued running the service until 1 January 1926.<ref name=":2" /> In 1926, Commonwealth Railways took over the running and commenced planning for extending the railway line north.

Work on the final section leading into Alice Springs, 1929
Work on the final section, where is connected to the Shell Depot in Alice Springs, 1929

Completion from Oodnadatta to Alice Springs

A Commonwealth Railways poster of the 1940s advertising train travel to winter holidays in Central Australia. The scene is Heavitree Gap, or Ntaripe in the Arrernte language, 3.5 km (2 mi) south of Alice Springs railway station. Both the size of the cliff and the speed of the train bore no connection with reality.

Extending the line from Oodnadatta to Alice Springs commenced around 1926 and was completed on 6 August 1929.

The Northern Territory Act (Cth 1910) required the building of a north–south railway although no date was specified. Two unballasted routes were shortlisted with a standard gauge line from Kingoonya to Alice Springs estimated at 4.5m pounds and the 1.7m pound narrow gauge extension from Oodnadatta to Alice Springs. The 270 miles 65 chain extension was passed after a number of debates in Federal Parliament.<ref>Template:Cite news Template:Open access</ref>

Railway workers were paid 5 pounds, 8 shillings a week and a request for this to be raised to 6 pounds per week was refused by Sir John Quick in the Federal Arbitration Court on 11 March 1927.<ref>Template:Cite newsTemplate:Full citation needed</ref>

The first train consisted of 12 carriages including Mail and Fruit vans. There were 60 first class and 60 second class passengers and left on 5 August 1929 however an official ceremony to be attended by the Prime Minister was cancelled due to the cost of running a special train.<ref>Template:Cite newsTemplate:Full citation needed</ref><ref>Template:Cite newsTemplate:Full citation needed</ref>

Operations

Conditions

The tortuously curving narrow-gauge line between Marree and Alice Springs was notoriously prone to delays, often caused by flash floods washing away bridges and tracks.<ref>Template:Cite news</ref> Some track was laid on sand without ballast, and wood sleepers were used, serving as food for termites, causing unstable tracks.<ref name="Tarrant">Template:Cite episode</ref>

Floods

Track severely twisted in the foreground leading to a bridge that has been washed down the river a significant distance
An example of the severity of floods on the railway in 1937: this bridge was displaced by tens of metres/yards

The choice of route through the most arid regions of Australia was influenced above all by the need for water for steam locomotives. Since time immemorial, Aboriginal people had followed a chain of artesian springs and waterholes to sustain them when carrying ochre from the Far North of South Australia to trading places in the south. The explorer John McDouall Stuart followed a similar route during several expeditions between 1858 and 1862.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The route taken by the Overland Telegraph ten years later, to which Stuart is believed to have given attention during his travels, was very similar. When the railway route was surveyed, it was hardly surprising that it followed the reliable sources of water.<ref name="Wilson">Template:Cite book</ref>Template:Rp The downside – an endless source of frustration for the railway maintainers – was that washouts occurred at some locations almost every year. When heavy rains fell inland in New South Wales and Queensland, gigantic "flash floods" came down normally dry riverbeds; bridges, embankments and other earthworks gave way under the onslaught. All but the largest bridge were severely damaged or washed away entirely, and miles of track were washed out – almost every year at some locations.<ref name="Browne" />Template:Rp

Template:Vertical align rows

Template:Larger
Date Location Event
1882 – March Flinders Ranges Washouts throughout<ref name="Browne" />
1889 – January Farina to Marree Washouts throughout<ref name="Browne" />
1890 – January Hawker to Beltana Washouts throughout<ref name="Browne" />
1903 – December Farina Washouts delay trains in the Farina area<ref name="Browne" />
1904 – February North of Parachilna Track washed away; two days' delay<ref name="Browne" />
1911 – February Brachina Train entered the creek south of station after rains. Driver of locomotive Y141 killed.<ref name="Browne" /><ref>Template:Cite news</ref>
1914 – January Entire line Major washouts throughout<ref name="Browne" />
1915 Brachina Bridge destroyed<ref name="Browne" /><ref>Template:Cite news</ref>
1917 – January Entire line Washouts<ref name="Browne" />
1918 – January Near Bopeechee Line cut by floodwaters<ref name="Browne" />
1919 – February Farina to Marree Washouts<ref name="Browne" />
1926 – March Copley to Farina; Oodnadatta region; Algebuckina Widespread rain caused damage in various parts of Central Australia.<ref>Template:Cite news</ref> A deviation at Algebuckina River was washed out twice while the bridge was being strengthened.<ref name="Browne" />
1929 – December Throughout, especially Marree and northward More than Template:Convert of track damaged by heavy rain after a seven-year drought; "unparalleled in the history of the railway"<ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref name="Browne" />
1930 – February Quorn to Marree; Finke and northward Services suspended 17 January to 6 March after some Finke River bridge piers were carried away and others were damaged. A deviation was put in place to run the line over the river bed.<ref>Template:Cite news</ref><ref name="Browne" />
1930 – October Oodnadatta to Alice Springs Many washouts<ref name="Browne" />
1931 – April Many washouts; Hookina Creek bridge damaged by logs<ref name="Browne" />
1932 – March Finke River crossing closed for 6 days<ref name="Browne" />
1933 – November Damage at various locations<ref name="Browne" />
1935 – January Damage at various locations<ref name="Browne" />
1935 – October Quorn to Parachilna, Ilbunga to Blood's Creek Washouts<ref name="Browne" />
1936 – January Boolcunda Creek bridge Bridge badly damaged; track closed for 8 days<ref name="Browne" />
1936 – February Camel Creek near Rodinga; Margaret Creek bridge Rodinga: a locomotive and three wagons used in repairing tracks after recent floods dived nose-first into Camel Creek after the bridge was undermined.

Margaret Creek bridge washed out; large pigsty constructed. Alice Creek bridge destroyed.<ref name="Browne" />

1936 – March Finke 16 people were marooned at Finke River railway crossing, which was Template:Convert under water; ten washaways were to the south<ref>Template:Cite news</ref>
1936 – May Willochra to Gordon Washouts<ref name="Browne" />
1937 – February Willochra Track subsides, derailing locomotive NM33<ref name="Browne" />
1937 – December Willochra to Beltana Washouts<ref name="Browne" />
1938 – February Damage at more than 100 locations north of Edward's

Creek

Marree Mixed stranded due to flooding further north. Major flooding north of Oodnadatta. Floodwaters nearly Template:Convert over rails and Template:Convert wide at Peake Creek. Finke River Template:Convert over rails.<ref name="Browne" />
1939 – January, February Hawker, Farina, Finke Trains held; no train to Alice Springs for 34 days causes food shortage<ref>Template:Cite news Template:Open access</ref><ref name="Browne" />
1939 – June Flood damage at numerous locations<ref name="Browne" />
1940 – January Oodnadatta to Alice Springs Washouts<ref name="Browne" />
1940 – February Finke Finke River floods<ref name="Browne" />
1941 – March Finke River crossing closed<ref name="Browne" />
1944 – February Severe flooding<ref name="Browne" />
1946 – January Bundooma; Hookina to Parachilna Washouts caused by Template:Convert of rain; line closed for three weeks, food dropped by air<ref name="Browne" />
1946 – February Railway closed for 23 days. Marree Mixed stranded. The Peake, Alberga, Stevenson, Hamilton and Finke rivers flooded. Food dropped by air.<ref name="Browne" />
1947 – February, March Beresford; Ewaninga to Alice Springs Alice Springs train marooned at Beresford<ref name="Browne" />
1949 – May Heavy rain and washouts<ref name="Browne" />
1950 – February, March Brachina, Commodore; Farina to Marree No trains for 3 weeks Quorn to Marree; shortage of coal from Telford Cut coalfields shortages disrupted power supplies<ref>Template:Cite news</ref><ref name="Browne" />
1950 – March Brachina to Curdimurka Alberga and Hamilton Rivers flood, making Template:Convert of line impassable; a coal train was among the trains stranded<ref>Template:Cite news</ref>
1950 – June Alberga Alberga and Hamilton Rivers flood<ref name="Browne" />
1953 – January Oodnadatta to Finke Trains delayed several days<ref name="Browne" />
1954 – October Finke to Bundooma Numerous washouts<ref name="Browne" />
1955 – February Hookina Numerous washouts between Willochra and Nilpena. Hookina bridge destroyed. Deviation built in two weeks, then also washed away in July and October 1956.<ref name="Browne" />
1956 – July Pedirka–Ilbunga; Hookina Railway closed for two days; Hamilton River (Pedirka) and Stevenson Creek (Ilbunga) flooded.<ref name="Browne" /> Hookina River flood delayed traffic for 36 hours, then another 36 hours five days later. Further floods on 16 October washed

the deviation track away and because a new standard-gauge line had been built it was never restored.<ref name="Pass">Template:Cite book</ref>Template:Rp

1960 – December Ewaninga Washaways; track damaged<ref name="Browne" />
1961 – April Finke Services delayed for 12 days<ref name="Browne" />
1963 – May Oodnadatta area The Ghan was held up for nearly a week by floods described as "the worst since 1938", and 114 of the 140 passengers were eventually flown from Oodnadatta to Alice Springs on five special flights.<ref>Template:Cite news Template:Open access</ref>
1963 – June Marree to William Creek; Peake Creek; Alberga River Extensive flooding and damage. Ghan stuck at William Creek with loco derailed. Ghan passengers airlifted from Oodnadatta.<ref name="Browne" />
1967 – February, March North of Oodnadatta Major flooding in many locations; track breached in more than 32 places. Low-Level Finke bridge again destroyed. Line closed for 27 days.<ref name="Browne" />
1968 Services suspended for three weeks<ref name="Browne" />
1974 – January to April North of Oodnadatta; Lake Eyre Heavy rains. All roads into Alice Springs closed. Low-level bridge at Finke destroyed. Line closed from 13 January to 16 March. No passenger services until 1 April.<ref name="Browne" /> Lake Eyre, normally dry, flooded to its deepest in recorded history. On the southern shore of Lake Eyre South, levees were required and the railway was eventually rebuilt on a new embankment.<ref name="Pass" />Template:Rp
1981 (post-closure) Abminga Rail recovery train stranded at Abminga. Finke River flowing.<ref name="Browne" />
2007 (post-closure) Gordon Wirreanda Creek bridge destroyed<ref name="Pass" />Template:Rp

World War II

In 1944, it was reported that trains had increased on the line from the normal two a week to 56, whilst the North Australia Railway had increased from one a week to 147. Rolling stock, sidings, marshaling areas and water points for the steam engines were all key issues in increasing traffic on the line.<ref>Template:Cite news</ref>

Diesel locomotives

The first diesel-electric locomotive entered service in June 1954. It was one of 14 locomotives ordered for both the Central and North Australia Railway. Built by the Birmingham Carriage and Wagon company, the locomotives had a maximum range of about Template:Convert and were designed to haul Template:Convert at Template:Convert on level track.<ref>Template:Cite news</ref>

Film

Shortly before the closure of the narrow gauge line in 1980, BBC Television filmed an episode of the television series Great Railway Journeys of the World featuring the original route of the Ghan (and the infamously slow speed of the train).Template:Citation needed

Decline, conversion to standard gauge and closure

After World War II, the railway line existence became questionable for a number of reasons:

  • The railway had a history of extensive flood damage as the original steam engines required access to streams which were prone to floods.
  • The track was narrow gauge and not ballasted and thus loads and speeds were both reduced, reducing the profitability of the line.
  • Goyder's Line of rainfall (1865), excluding rains in 1865, 1872 and some other years, was shown as being highly accurate with communities and cropping lands north of his line being abandoned after long dry spells. The entire railway is north of this line.
  • Trucks and roads were becoming more reliable and utilised in South Australia.
  • The 1910 Northern Territory Acceptance Act mandating a railway line between Darwin and Adelaide requiring a standard gauge railway, which would need to be less susceptible to flooding than the existing route designed for diesel-electric engines rather than steam.
  • Improved railway engineering and construction methods allowed for improved design.
  • The standard gauge upgrade of the southern section of the line from near Port Augusta to Maree placed pressure on the remaining narrow gauge sections that remained opened due to transfer and maintenance costs.

Standard gauge line to Marree

In 1949, both South Australia and the Federal Government enacted the Railway Standardisation (South Australia) Agreement Act<ref name= RSAA1949/> which looked at the upgrade of all lines to standard gauge, including the Central Australia Line. The act was more of an overarching statement rather than a commitment to complete all lines in a set order or time.

The Leigh Creek and Telford Cut Coalfields were first excavated in 1943 following a shortage of coal during World War II and between 1951 and 1954, discussions surrounded two route options to upgrade to standard gauge. Option B2 was upgrading the current line to Telford, the C option was the chosen option which was up to 32 km west of the current line.<ref>Template:Cite news</ref> The South Australian and Federal governments bickered over by-passing the township of Quorn and it was only after a Royal Commission, that the Commonwealth Railways got their way with option C avoiding Quorn and the work commenced on the 255 km line.

The South Australian Government and agriculturists wanted to extend the standard gauge line a further 88 km to Marree.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> This would reduce the bruising of the cattle and shorten the time to market as well as increase the number of cattle that could be transferred. Transferring livestock at Telford was considered problematic with coal dust and machinery.<ref>Template:Cite news</ref>

The federal minister of transport travelled to the area in mid-1954 and confirmed the extension from Telford Cut to Marree. The cost was set at 1,241,000 pounds, compared to 821,000 pounds to bring the existing line up to an acceptable level including ballasting and possible bridge replacement.<ref>Template:Cite news</ref>

The Minister for Transport, Senator George McLeay and the Commonwealth Railways Commissioner, Mr. P. J. Hannaberry, both stated that they were "strongly in favour" to extend the standard gauge line all the way to Alice Springs in 1952.<ref>Template:Cite news</ref> By April 1954, Hannaberry had changed his mind and stated it was "out of the question".<ref>Template:Cite news</ref>

In 1957, the Marree Railway Line, the new standard gauge line from Stirling North (near Port Augusta) to Marree (372 km from Port Augusta) opened, replacing the existing line via Quorn. This was predominantly for coal to be transferred from the Leigh Creek and Telford Cut Coalfields to the power stations at Stirling North. The line was extended to Marree for cattle to be transported to market from the grazing plains, including around the Birdsville Track.

Closures

With the new standard gauge Marree Railway Line opened, the narrow gauge line began to close in sections:

  • 1957: The section between Brachina (173 km) to Beltana (232 km) is closed in March
  • 1957: The section between Leigh Creek (262 km) to Marree (372 km) is closed in July
  • 1958: Beltana (232 km) to Leigh Creek (262 km) closed in July.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

  • 1972: Port Augusta (0 km) to Hawker (105 km) closed.
    • Some sections of the narrow-gauge line remain in operation as the Pichi Richi Railway and the section from Port Augusta to Stirling North was realigned and restored in 2000–2002.
  • 1981: The entire narrow gauge line was closed with the section between Marree (372 km) and Alice Springs (1243 km) abandoned, replaced by Tarcoola-Alice Springs line standard gauge line.<ref>Template:Citation</ref>Template:Page needed
  • 1987: Standard gauge between Marree and Telford Cut closed.
  • 2016: Stirling North-Telford Cut standard gauge line mothballed after power station and mine closure.<ref>Template:Cite news</ref> On 3 December 2016, Chicago Freight Car Leasing Australia began storing wagons in the disused sidings at Stirling North. various rail operators including Bowmans Rail, Sydney Rail Services, One Rail Australia, Southern Shorthaul Railroad and Pacific National have operated trains to and from the sidings for desire or temporary storage of trains and wagons.
  • 2018: For a short period between 28 February 2018 & 29 July 2018, Bowmans Rail were operating a section of the former Leigh Creek Line for a few kms to off-load containers used in the construction of the Bungala Solar Farm.
  • 2023: Trains now run as required to CFCLA’s (now RailFirst Asset Management) Stirling North Yard including twice in 2023.

Heritage trail, restoration and preserved sections

The old railway route is now a heritage trail.<ref>Template:Citation</ref>

In 1974, the newly formed Pichi Richi Railway Preservation Society commenced a restoration program, headquartered at Quorn at the picturesque southern end of the railway; Stirling North, near Port Augusta, was the other terminus. It progressively restored and operated the Pichi Richi Railway as a working museum, upgrading track and undertaking preservation of a wide range of South Australian Railways rolling stock and some locomotives, secured against deterioration in the former running sheds. Between 2000 and 2002, the line was extended 12 km (7 mi) to Port Augusta station, running alongside the standard gauge mainline for about half the distance.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In May 2016, traffic ceased on the standard gauge line between Telford Cut coal mine and Port Augusta after the power station at Port Paterson was shut down.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The Farina Restoration Project Group, whose members travel to the former town at agreed periods to work voluntarily, is restoring the small, now-deserted railway township of Farina.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

List of stations, stopping places and localities

Template:Larger
For south-to-north sequence, read across. As an indication of settlement today, 2016 census populations of 100 or more are shown as [pop.]. Population figures of early years are not available. Compared with the final decades of the 20th century, the present-day population Port Augusta is higher; Stirling North much higher; Quorn lower; Marree and Oodnadatta much lower; Alice Springs lower.
Port Augusta [pop. 6560] Port Augusta racetrack Stirling North [pop. 2670] Saltia
Woolshed Flat Pichi Richi Summit Quorn [pop. 1230]
Willochra Gordon Wilson Hawker [pop. 340]
Hookina (at Wonoka) Mern Merna Edeowie Brachina
Commodore (originally Meadows) Parachilna Nilpena (originally Blackfellow's Creek) Beltana
Puttapa Copley (originally Leigh Creek) [pop. 320] Telford Lyndhurst
Farina (originally Government Gums) Wirrawilla Mundowdna Marree (originally Hergott) [pop. 100]
Callanna Wangianna Alberrie Creek Bopeechee
Lake Eyre Stuart's Creek (Curdimurka) Margaret Siding Coward Springs
Beresford Strangways Springs Irrappatana William Creek
Douglas Anna Creek Box Creek Boorthanna
Duff Creek Edward's Creek Warrina Peake Creek
Algebuckina Mount Dutton North Creek Oodnadatta [pop. 200]
Todmorten Wire Creek Alberga Macumba
Mount Sarah Mount Rebecca Pedirka Mount Emery
Illbunga Bloods Creek Abminga Wall Creek
Duffield Crown Point Finke (now Aputula) [pop. 170] Musgrave
Rumbalara Mount Squire Engoordina Bundooma
Maryvale Rodinga Deep Well Ooraminna
Mount Polhill Ewaninga Mount Ertiva MacDonnell
Heavitree Alice Springs [pop. 24,750] Alice Springs Abattoirs

See also

Template:Portal

Notes

Template:Reflist

References

Template:Reflist

Further reading

Template:Refbegin