East–West Line (Singapore)

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:About Template:Use British English Template:Use dmy dates Template:Infobox rail line

The East–West Line (EWL) is a high-capacity Mass Rapid Transit (MRT) line operated by SMRT in Singapore, running from Pasir Ris station in the east to Tuas Link station in the west, with an additional branch between Changi Airport and Tanah Merah stations. It is the second Mass Rapid Transit line to be built in Singapore. Coloured green on the rail map, the line serves 35 stations, 8 of which (from Lavender to Tiong Bahru and Changi Airport stations) are underground.<ref name="lta-ewl">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> At Template:Convert, the line is the longest on the MRT network.

Constructed and opened as part of the North–South Line (NSL) in the early stages of development, the East–West Line was the second rail line formed in Singapore after NSL, with the opening of the eastern extension to Tanah Merah on the EWL in 1989. Nevertheless, both lines use identical signalling equipment and rolling stock. The East–West Line signalling systems have been upgraded along with the North–South Line, with both MRT lines having its signalling fully upgraded, converting it from semi-automatic to fully automatic.

History

Initial developments

The first segment of what would become the East–West Line, between City Hall and Outram Park stations, was opened on 12 December 1987 as part of the North–South Line and Phase 1 of the initial system.<ref>Template:Cite news</ref><ref name=":1" /> Subsequently, it was extended westwards to Clementi station on 12 March 1988<ref name=":1">Template:Cite news</ref> and to Lakeside on 5 November 1988.<ref name=":2">Template:Cite news</ref>

The Template:Convert eastern extension to Tanah Merah station opened on 4 November 1989, which also marked the start of independent operations as the East–West Line.<ref name=":2" /> The opening ceremony was attended by then First Deputy Prime Minister Goh Chok Tong.<ref>Template:Cite news</ref><ref name=":Tanah merah">Template:Cite news</ref>

The Template:Convert line extension to Pasir Ris station was opened ahead of schedule on 16 December 1989<ref name=":Tanah merah"/><ref>Template:Cite news</ref> with a sneak preview beforehand.<ref>Template:Cite news</ref> Boon Lay station opened on 6 July 1990, marking the completion of the initial MRT system.<ref>Template:Cite news</ref>

Subsequent developments

Dover station

Dover station

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} Construction on a new infill station located between Buona Vista station and Clementi station, namely Dover station, began in June 1998. It is the first station in the MRT network to be built as an infill station.<ref>Template:Cite news</ref> The building of the station was met with reservations by some members of the public over the small area it serviced and there were criticisms over the spending of "taxpayers' money" chiefly for use only by students of one educational institution.<ref>Template:Cite news</ref> Despite some opposition, the Land Transport Authority proceeded with the construction to serve commuters along Singapore Polytechnic with Dover housing estate.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> The station opened on 18 October 2001.<ref>Template:Cite news</ref> Prior to opening, test runs were conducted from 13 to 17 October 2001 when the trains stopped at the station but did not open their doors.

Tanah Merah to Airport extension line

Template:Anchor

Changi Airport station

The idea of extending the Mass Rapid Transit system to Changi Airport was reconsidered when Terminal 3 of the airport was being built.<ref>Template:Cite news</ref> Earlier plans had long been made for a new line branching off from the existing East–West Line at Tanah Merah,<ref>Template:Cite news</ref> with some conceptual plans showing a tentative route alignment up to the airport along Airport Boulevard, continuing beyond the airport to Changi Point, before turning southwest back towards the city along the eastern coasts. The plans were finally announced by then Deputy Prime Minister Lee Hsien Loong on 15 November 1996.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> However, the new route alignment showed a deviation from previous plans,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref> where the final plan involved in building only the first two stations of Expo, and Changi Airport, the latter being the underground station built between Terminal 2 and Terminal 3. The alignment of the station at the airport also switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of the station. The station's designs were unveiled on 10 February 1998 with construction starting on 29 January 1999.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Expo and Changi Airport were opened on 10 January 2001 and 8 February 2002 respectively and operates under a shuttle service. Prior to 22 July 2003, train services from Boon Lay commences after the opening, but were later reverted to shuttle services due to low patronage.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> On 25 May 2019, it was announced that the Changi Airport Extension will be converted to become part of Thomson–East Coast Line Extension (TELe) by 2040.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="LTMP2040">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="LTMP2040_today">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Boon Lay and Tuas extension

Tuas Link station

The Template:Convert Boon Lay extension was first announced by the LTA on 29 December 2004, set to serve residents from the Jurong West Town area and those working in the Jurong Industrial Estate.<ref>Template:Cite news</ref> The two stations, Pioneer and Joo Koon stations, officially opened on 28 February 2009.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

On 11 January 2011, the Tuas West extension, an extension of the East–West Line from Joo Koon to Tuas Link was announced.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The extension has a span of Template:Convert, which spans a twin-tracked MRT viaduct, four above-ground stations and a Template:Convert depot to provide stabling and maintenance facilities for the additional trains that will be bought for the extension and to cater for future expansion of the line.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The viaduct is integrated with part of a Template:Convert road viaduct along Pioneer Road, which will increase the road capacity to cope with anticipated increase in traffic. The stations are Gul Circle, Tuas Crescent, Tuas West Road, and Tuas Link. On 4 May 2012, the Land Transport Authority marked the start of construction of the Tuas West extension with a groundbreaking ceremony at the site of the future Tuas Link station.<ref name="TWE">Template:Cite press release</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The extension began service on 18 June 2017.<ref>Template:Cite press release</ref><ref>Template:Cite news</ref><ref>Template:Cite news</ref> During initial stages after opening, the westbound trains will alternate their terminus between Joo Koon and Tuas Link, where for every two trains, one train will terminate at the former, while the other train will terminate at the latter.<ref>Template:Cite news</ref>

Additional platform at Tanah Merah station

On 25 August 2014, the Land Transport Authority announced that a new platform will be constructed at Tanah Merah, enabling faster travel and shorter waiting times for commuters heading towards Expo and Changi Airport on the Changi Airport branch line of the East–West Line.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

On 26 October 2016, the Land Transport Authority awarded the civil contract to Lum Chang Building Contractors Pte. Ltd. to build a new platform at Tanah Merah and viaducts for a contract sum of S$325 million. In addition to the new platforms, the existing East–West Line tracks will be extended to connect the line to the new four-in-one East Coast Integrated Depot at Changi.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> When completed in 2024, it will be the second station to have triple island platforms after Jurong East.

Half-height platform screen door installations

There were calls for platform screen doors (PSDs) to be installed at above-ground stations after several incidents in which passengers were killed or seriously injured by oncoming trains when they fell onto the railway tracks at above-ground stations. Underground stations already featured the doors since 1987. The authorities initially rejected the proposal by casting doubts over functionality and concerns about the high installation costs,<ref name="doublerail">Template:Cite press release</ref> but made an about-turn later with the government announcing plans to install half-height platform screen doors on the elevated stations by 2012 on 25 January 2008, citing lower costs due to it becoming a more common feature worldwide.<ref>Template:Cite news</ref> Contract C1320 for the design and installation of half-height platform screen doors was awarded to Singapore Technologies Electronics Limited in September 2008 for Template:SGDConvert.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> They were first installed at Jurong East, Pasir Ris, and Yishun stations in 2009 as trial runs.<ref name="stplatformdoorselevated">Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> On 31 August 2011, the LTA announced completion of the installation of PSDs along the East–West Line, with Expo being the last station on the line to receive the PSDs.<ref>Template:Cite press release</ref> Installation of PSDs across both the North–South and East–West lines (NSEWL) were completed on 14 March 2012, 3 months ahead of schedule.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Improvement works

Timber to concrete sleeper replacement works

The timber sleepers on the East–West Line was required to be replaced as they were near the end of their 25-year lifespan. The replacement sleepers, made of concrete, have a significantly longer lifespan.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> To speed up works, train services on the East–West Line was adjusted to end earlier. The work was divided into three phases: Phase 1 (Bugis – Tanah Merah), Phase 2 (Joo Koon – Jurong East, Tanah Merah – Pasir Ris) and Phase 3 (Jurong East – Outram Park). The sleepers were fully replaced on 18 February 2017.<ref>Template:Cite news</ref>

Re-signalling works

A new moving-block signalling system, supplied by Thales, replaced the former ageing fixed-block signalling system on the East–West Line. The new signalling system, costing $195 million, reduces waiting times for trains during peak periods from 120 seconds then to 100 seconds now.<ref>Template:Cite press release</ref> The new system became operational between Pioneer and Tuas Link stations on 18 June 2017. Newer rolling stocks, such as the C151B and C151C, are equipped for use solely on the new signalling system.<ref>Template:Cite news</ref> Since 27 May 2018, the new signalling system has been operating full-day on the entire East–West Line.

Third-rail replacement

Replacement works on the third rail, which provides electricity to the trains, were carried out between September 2015 and August 2017.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The new third rail replaced its 30-year-old predecessor and is expected to increase reliability of the East–West Line's electrical system.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Pasir Ris turnback extension

A new railway turnback located at Pasir Ris station, the eastern terminus of the line, was announced by the Land Transport Authority on 29 Jun 2018. It would extend the railway viaduct past the station by Template:Convert.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The turnback will allow for an increase in service frequency during peak times from 30 to 36 trains per hour as trains will be able to change directions faster to head westwards on the line, to meet future increases in ridership demand. Construction started in 2019 and was completed in May 2024.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Incidents

1993 Clementi train collision

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} On 5 August 1993, before opening, a maintenance vehicle spilt oil on the tracks between Clementi and Jurong East. The first ten eastbound trains reported braking problems, then the eleventh train from Jurong stopped at the Clementi station for two minutes longer than scheduled due to it using its emergency brakes to stop at the station at 7.50 am, before being hit by another eastbound train when it failed to stop in time. 156 passengers were injured by the collision.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

7 July 2015 power trip

During the evening peak hours on 7 July 2015, train services on the East–West and North–South Lines were temporarily disrupted due to massive power trips detected along both lines. The cause of the disruption was due to damaged insulators which had resulted in the failure of the power supply.<ref>Template:Cite news</ref> For this disruption that brought inconvenience to 413,000 commuters, LTA imposed a 'record' fine of S$5.4 million on SMRT.<ref>Template:Cite news</ref>

22 March 2016 staff fatalities

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} At about 11:08 a.m. on 22 March 2016, two SMRT track-maintenance trainee staff were run over and killed by a C151 train approaching Pasir Ris station,<ref>Template:Cite news</ref> resulting in a temporarily service delay between Tanah Merah and Pasir Ris for over two hours that affected at least 10,000 commuters.<ref>Template:Cite news</ref>

The two trainee staff had joined SMRT in January 2016 and worked as technicians under a technical team of 15 staff led by a supervisor and were tasked to go down to the tracks to investigate an alarm triggered by a possible signalling equipment fault close by the station. An operator cited that they were granted access to the tracks, but did not coordinate with a Signal Unit in the station to ensure trains could not travel in the area where the team was.<ref>Template:Cite news</ref>

Patrick Nathan, SMRT vice-president, promised that "SMRT will review all safety protocols particularly those involving track access".<ref>Template:Cite news</ref> SMRT chief executive Desmond Kuek apologised for the incident and said SMRT will investigate how "the [two men] got hit by the train". SMRT fired both an engineer responsible for leading with the team and the train driver who was involved at the scene of the incident.

The engineer who led the inspection team was charged with negligence causing death under the Penal Code<ref name="smrt-charged2">Template:Cite news</ref> and was subsequently sentenced to 4 weeks in jail.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> SMRT Trains and one member of SMRT management were charged for violating the Workplace Safety and Health Act for lapses which led to the accident,<ref name="smrt-charged2" /> and were fined $400,000 respectively.<ref>Template:Cite news</ref> and $55,000.<ref>Template:Cite news</ref> On 20 July 2018, the Land Transport Authority fined the operator S$1.9 million (US$Template:ToUSD million) for this incident and the Bishan tunnel flooding.<ref name="CNA 2018">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="TODAYonline 2016">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

15 November 2017 train collision and disruptions

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} A second train collision occurred on 15 November 2017 at approximately 8.18am, where two C151A trains collided at Joo Koon MRT station. A train fault caused the first train heading in the direction of Tuas Link to stall at the station. A minute later, a second train stopped behind the first and then "moved forward unexpectedly," hitting the other train. Thirty-eight people, including two SMRT staff, were hospitalized.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref>Template:Cite news</ref>

Train services between Tuas Link and Joo Koon stations were temporally suspended in both directions for two hours on the day itself and the entire day on 16 November 2017, and westbound trains temporarily terminated at Joo Koon.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

An update by the Land Transport Authority (LTA) & SMRT on 16 November 2017 stated that LTA and SMRT had decided to isolate for up to one month the operations of the Tuas West extension, which runs on the new signalling system, from the rest of the East–West Line, which runs on the old signalling system, enabling LTA engineers to carry out further assurance checks together with Thales. The train was switching systems when the collision took place.<ref name="16Nov">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Train service on the line resumed on 20 November, with the Tuas West extension between Gul Circle and Tuas Link using the new signalling system and the section between Pasir Ris and Joo Koon, together with the Changi Airport Branch continuing to run on the old signalling system. Train services between Joo Koon and Gul Circle were temporarily suspended until its resumption on 28 May 2018; between the suspension a free bridging bus service is available between the two stations. Continuous service between Pasir Ris and Gul Circle resumed on 28 May 2018, with the permanent activation of the new CBTC system; since the incident, selected portions of either the North–South Line or East–West Line were closed to conduct track renewal works with early weekend closures and later station openings.<ref name=":0">Template:Cite news</ref>

25-30 September 2024 train derailment and disruptions

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}

Train services between Boon Lay and Queenstown had been suspended since 9am on 25 September 2024 after trains lost power on a stretch near Clementi MRT station. A defective train axle box on one of the first generation C151 trains, which had been deadheading to Ulu Pandan Depot after it was withdrawn at Clementi station, dropped onto the tracks near Dover station and caused the wheels of a bogie - an undercarriage - to come off the running rail and hit track equipment, including stretches of the third rail, 3 point machines as well as power cables and rail clips.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name=":4">Template:Cite news</ref> In an update at about 9:30pm on 25 September 2024, LTA and SMRT announced that train services between Buona Vista and Jurong East would remain suspended on 26 September 2024, the 1st day of the PSLE exams, while service between Boon Lay and Jurong East, and Queenstown and Buona Vista, would each run their own separate shuttle services every 10 minutes.<ref name=":4" /><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref> On Thursday night, SMRT announced that no trains will run between Jurong East and Buona Vista for a third straight day, with full service expected to resume the following Monday. However, in an update at about 4:30pm on 29 September 2024, the target date for restoration of full service was pushed back to Tuesday.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> On September 30, SMRT and LTA announced that full service would fully resume on October 1, with westbound train speeds being reduced from the usual 60-80 kilometres per hour (37.5-50mph) to 40 kilometres per hour (25mph) until October 3, as part of a standard process after rail replacements.<ref>Template:Cite news</ref>

Network and operations

Train services on the East–West Line operates from approximately 5:30Template:Nbspam to around midnight daily. In general, during peak hours, train frequency is 2 to 3 minutes while during non-peak hours the frequency is reduced to 5 minutes throughout the entire route.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The first train departs from these places:

From Heading to Departing at Notes
Tanah Merah Pasir Ris 4:59 am - Weekdays
5:01 am - Saturdays
5:27 am - Sundays & Public Holidays
5:12 am (Weekdays), 5:14 am (Saturdays) and 5:40 am (Sundays & Public Holidays) as a downroute from Pasir Ris to reach Jurong East at 6:07 am (Weekdays), 6:09 am (Saturdays) and 6:33 am (Sundays & Public Holidays)
Changi Airport 5:07 am - Weekdays
5:07 am - Saturdays
5:31 am - Sundays & Public Holidays
Reach one-loop at 5:29 am (Weekdays and Saturdays) and 5:52 am (Sundays and Public Holidays).
Clementi Tanah Merah 5:25 am - Weekdays
5:26 am - Saturdays
5:56 am - Sundays & Public Holidays
Tuas Link Clementi 5:03 am - Weekdays
5:04 am - Saturdays
5:35 am - Sundays & Public Holidays

Train services on the East–West Line are also subjected to maintenance and renewal works, usually on selected Fridays, Saturdays or Sundays. Shuttle bus services may be provided throughout the duration of the early closures and late openings for affected commuters.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Operations of the East–West Line are affected by the COVID-19 pandemic, leading to the drop of ridership.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Route

Geographically accurate map of the East–West Line.

As its name implies, the East–West Line connects central Singapore to both eastern and western parts of the island, with an additional branch between Changi Airport and Tanah Merah, which operates as a separate shuttle service. It is 57.2 kilometers (35.5 miles) long and it is predominantly double-tracked, but certain short sections at Tanah Merah, Outram Park and Joo Koon widens to three tracks, four tracks nearby Jurong East station and a section between Jurong East and Clementi station and five tracks nearby Changi Depot and Tanah Merah station.

Some stations are commonly placed at the middle of the roads such as Tanah Merah, Bedok, Queenstown, Commonwealth, Dover, Clementi, Pioneer, Joo Koon, Gul Circle, Tuas Crescent and Tuas West Road. The line runs mostly on overhead viaducts but goes underground in the city area between Kallang and Redhill, Bedok and Kembangan, and between Expo and Changi Airport. Travelling from one end of the line to the other takes about 85 minutes.

The line begins above ground at Pasir Ris station from where it continues to head south towards Simei station. The line curves between Simei to Tanah Merah stations and continues westwards, joining the Changi Airport branch, paralleling New Upper Changi Road. Two branch lines to Changi Depot and to Changi Airport station exists between Simei and Tanah Merah stations. At Tanah Merah station, the line extends to four tracks due to its interchange with the Changi branch before turning back into two tracks in a western direction.

From Bedok station to Kembangan station, the line goes underground but then goes above-ground, and follows the route of Sims Avenue and Sims Avenue East in an opposite direction. After Kallang station, the line goes underground through the Central Area and runs heads south-west towards City Hall station. It then runs parallel to the North–South Line between City Hall and Raffles Place stations, which are cross-platform interchanges to the North–South Line. After Tanjong Pagar, the line curves northwestwards towards Outram Park. After Tiong Bahru, the line continues above ground starting with Redhill station and follows the direction of Commonwealth Avenue, Commonwealth Avenue West and Boon Lay Way. Between Clementi and Jurong East station, three branches (one going east and two going west) to Ulu Pandan Depot are deployed. At Jurong East station, the line extends again to four tracks due to its interchange with the North–South Line but then, separates into two before heading west to Chinese Garden station. After Pioneer station, the line heads south-west before curving westwards towards Joo Koon station. The line terminates at Tuas Link with a branch heading towards Tuas Depot.

The Changi Airport extension starts at Tanah Merah station as a single track before turning eastwards to Expo station. After Expo station, it goes underground and curves south before terminating at Changi Airport station.

The East–West Line was constructed along the North–South Line. As such, both lines used identical signalling equipment and rolling stock.

Stations

The line serves 35 stations across Template:Convert of track, and station codes for the line are green, corresponding to the line's colour on the system map.<ref name="EWL LTA">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="EWL ext">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> 8 stations, including Changi Airport, and 7 other stations on the stretch from Lavender to Tiong Bahru are underground, with the rest being elevated. With the exception of Dover, all stations have island platforms.

East–West Line stations timeline
Date Project Description
7 November 1987 Phase 1 Yio Chu KangToa Payoh (Now part of the North–South Line)
12 December 1987 Toa PayohOutram Park (Direct train service to Outram Park via Raffles Place)
12 March 1988 Phase 1A Outram ParkClementi
5 November 1988 Phase 2B ClementiLakeside
20 December 1988 Yio Chu KangYishun (Now part of the North–South Line)
4 November 1989 Phase 2A City HallTanah Merah (Separation of the North–South Line & East–West Line)
16 December 1989 Tanah MerahPasir Ris
10 March 1990 Phase 2B Jurong EastChoa Chu Kang (Operates as a branch line from Jurong East, now part of the North–South Line)
6 July 1990 LakesideBoon Lay
10 January 2001 Changi Airport Extension Tanah MerahExpo
18 October 2001 Dover Station Dover station between Buona Vista and Clementi
8 February 2002 Changi Airport Extension ExpoChangi Airport
28 February 2009 Boon Lay Extension Boon LayJoo Koon
18 June 2017 Tuas West Extension Joo KoonTuas Link
16 November 2017 Temporary closure of Joo KoonTuas Link (Due to a train collision at Joo Koon)
20 November 2017 Reopening of Gul CircleTuas Link (Reopens as a separate line, transfer between Joo Koon & Gul Circle)
28 May 2018 Reopening of Joo KoonGul Circle (Merges into one line)

Legend


Elevated
 
Line terminus

Transfer outside paid area

Ground-level

Wheelchair accessible

Bus interchange

Underground

Civil Defence Shelter
     
Other transportation modes

List

scope="col" style="color: white; background:#Template:Rcr" | Station code scope="col" style="color: white; background:#Template:Rcr" | Station name scope="col" style="color: white; background:#Template:Rcr" | Images scope="col" style="color: white; background:#Template:Rcr" | Interchange;
Adjacent transportation
scope="col" style="color: white; background:#Template:Rcr" | Opening scope="col" style="color: white; background:#Template:Rcr" | Cost
Template:SMRT code Pasir Ris Template:Rbox (2030)
Template:Rbox (2032)

Pasir Ris
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} S$5 billion
Template:SMRT codeTemplate:SMRT code Tampines Template:Rbox

Tampines
Tampines Concourse
Template:SMRT code Simei Template:Sdash
Template:SMRT code Tanah Merah Template:Rbox (until mid-2030s)
Template:Rbox (after mid-2030s)
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:SMRT code Bedok Bedok
Template:SMRT code Kembangan Template:Sdash
Template:SMRT code Eunos Eunos
Template:SMRT code Paya Lebar Template:Rbox
Template:SMRT code Aljunied Template:Sdash
Template:SMRT code Kallang Lorong 1 Geylang (until late-2020s)
Kallang (from late-2020s)
Template:SMRT code Lavender Template:Sdash
Template:SMRT code Bugis Template:Rbox
Template:SMRT code City Hall File:City Hall MRT Station 202407.jpg Template:Rbox {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:SMRT code Raffles Place File:Raffles Place MRT Station 202407.jpg
Template:SMRT code Tanjong Pagar File:EW15 Tanjong Pagar MRT Platforms 20220708 134226.jpg Template:Sdash
Template:SMRT code Outram Park File:EW16 Outram Park MRT Platforms 20221215 123229.jpg Template:Rbox
Template:Rbox
Template:SMRT code Tiong Bahru File:EW17 Tiong Bahru MRT Alstom Movia R151 20230611 161251.jpg rowspan="4"Template:Sdash {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:SMRT code Redhill File:Redhill MRT Station 202407 2.jpg
Template:SMRT code Queenstown File:Queenstown MRT Station 202407.jpg
Template:SMRT code Commonwealth File:Commonwealth MRT Station.jpg
Template:SMRT code Buona Vista File:Buona Vista MRT Station.jpg Template:Rbox

Buona Vista
Ghim Moh
Template:SMRT code Dover File:Dover MRT Station 3.jpg Template:Sdash {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} citation CitationClass=web

}}</ref>

Template:SMRT code Clementi File:Clementi MRT Station.jpg Template:Rbox (2032)

Clementi
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} S$5 billion
Template:SMRT code Jurong East File:Jurong East MRT Station 202406 4.jpg Template:Rbox
Template:Rbox (2028)

Jurong East
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:SMRT code Chinese Garden File:Chinese Garden MRT Station 202407 2.jpg rowspan="2"Template:Sdash
Template:SMRT code Lakeside File:Lakeside MRT Station.jpg
Template:SMRT code Boon Lay File:Boon Lay MRT Station 202407.jpg Template:Rbox (2027)

Boon Lay
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:SMRT code Pioneer File:Pioneer MRT Station.jpg Template:Sdash {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} S$436 million<ref>{{#invoke:citation/CS1|citation CitationClass=web

}}</ref>

Template:SMRT code Joo Koon File:Joo Koon Station platform.jpg Joo Koon
Template:SMRT code Gul Circle File:Gul Circle station.jpg rowspan="3"Template:Sdash {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} S$3.5 billion<ref>Template:Cite news</ref>
Template:SMRT code Tuas Crescent File:Tuas Crescent MRT Station 202407.jpg
Template:SMRT code Tuas West Road File:Tuas West Road MRT Station 202407.jpg
Template:SMRT code Tuas Link File:Tuas Link MRT Station 202407 2.jpg Tuas

Tuas Checkpoint
Changi Airport Line (CAL)
Template:SMRT code Expo File:Expo MRT Station.jpg Template:Rbox {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} S$850 million<ref>{{#invoke:citation/CS1|citation CitationClass=web

}}</ref>

Template:SMRT code Changi Airport File:Changi Airport MRT Station 202407.jpg Changi Airport

Changi Airport Terminals 1–4
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}

The branch sector of Tanah Merah to Changi Airport was operated as a through service from Boon Lay from 18 November 2001 until 22 July 2003, until it was replaced as a shuttle service to and from Tanah Merah and Changi Airport. By the mid-2030s, the Changi Airport extension will be converted and to be served by the Thomson–East Coast Line.<ref name="LTMP2040"/><ref name="LTMP2040_today"/>

Depots

scope="col" style="color: white; background:#Template:Rcr" | Depot name;
Lines
scope="col" style="color: white; background:#Template:Rcr" | Location scope="col" style="color: white; background:#Template:Rcr" | Image scope="col" style="color: white; background:#Template:Rcr" | Line-specific
stabling capacity
scope="col" style="color: white; background:#Template:Rcr" | Cost scope="col" style="color: white; background:#Template:Rcr" | Opening
Template:Rbox (until 2026) Changi File:ChangiMRTDepot-Singapore-20090801.jpg 35 trains S$250 million {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:Rbox
 Template:Rint
Jurong East File:Ulu Pandan Depot.jpg 45 trains S$130 million {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:Rbox Tuas File:EWL overrun tracks and Tuas MRT Depot 20210120 145029.jpg 60 trains citation CitationClass=web }}</ref> || {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:Rbox
Template:Rint
Template:Rint  (U/C, after 2026) Template:Efn-lr
Changi Template:CNone 72 trains citation CitationClass=web

}}</ref><ref>{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref><ref>{{#invoke:citation/CS1|citation

CitationClass=web }}</ref> || {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}

Template:Notelist-lr

Infrastructure

Rolling stock

Template:Multiple image

Four batches of rolling stock operate on the East–West Line, namely the C151A, C151B, C151C and R151 from oldest to newest, shared with the North–South Line. Trains are maintained at Changi Depot, Ulu Pandan Depot and Tuas Depot, which provide train maintenance, inspection and overhaul facilities.<ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref name=":3">Template:Cite news</ref> These models of rolling stock were introduced to boost the capacity on both the North–South and the East–West lines in order to cope with increasing ridership.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Both the North–South and the East–West lines utilized identical rolling stock up until the 2010s, when the C151A trains were temporary suspended from operating on the North–South Line from January 2012 until November 2013 following the 2011 train disruptions.<ref>Template:Cite news</ref><ref name="S2nd Update – SMRT statement : Service disruption on North–South Line (Northbound): Marina Bay Station to Bishan Station">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref name="Service disruption on North–South Line on 17 Dec 2011">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref> The C151B trains, which were introduced in April 2017, did not begin revenue service on the full stretch of the East–West Line until the line's trial of the CBTC signalling system in May 2018.<ref name="Sundays">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="SMRT press">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The C151C trains, despite their introduction on 30 September 2018 on the North–South Line, rarely run on the East–West Line.<ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Another generation of rolling stock, the R151 trains, will be delivered from 2022 to 2026, to replace all 66 first-generation C151 trains which will be retired by 2025, as well as all 19 second-generation C651 and 21 third-generation C751B trains which were retired in 2024. The R151 trains are the first rolling stock on the East–West Line to be manufactured by Bombardier (Bought by Alstom in 2021), which has also supplied trains for the Downtown Line.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref><ref>Template:Cite news</ref> The first train entered service on the East–West Line on 4 June 2023.<ref>Template:Cite news</ref>

Signalling

File:C151 tnm cgl.jpg
Half-Platform Screen Doors installed in Tanah Merah station

The East–West Line is equipped with Thales SelTrac communications-based train control (CBTC) moving block signalling system<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> with automatic train control (ATC) under automatic train operation (ATO) Grades of Automation (GoA) 3.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The subsystems consist of automatic train protection (ATP) to govern train speed, NetTrac MT Automatic Train Supervision (ATS) to track and schedule trains and a computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set.<ref>Template:Cite press release</ref>

The old signalling system has undergone decommissioning work from August 2018 and was completed on 23 November 2018.<ref>Template:Cite news</ref> It consists of Westinghouse fixed block signalling system with Automatic train control (ATC) under Automatic train operation (ATO) GoA 2.<ref name="Westinghouse FS2K">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The subsystems consist of Automatic train protection (ATP) to govern train speed, Automatic Train Supervision (ATS) to track and schedule trains and a Relay interlocking system that prevents incorrect signal and track points to be set.

The stretch of track between Pioneer and Tuas Link stations was equipped with the new signalling system which came into use in June 2017. As the section of track between Pioneer and Joo Koon support 'mixed-mode' of both signalling systems, trains terminating at either Joo Koon or Tuas Link would have to change signalling modes at Pioneer MRT station as trains terminating at Joo Koon would proceed to a turn back siding which was built as part of the TWE which only supports the new signalling system. Eastbound trains towards Pasir Ris would have to change back to the old signalling system at Pioneer MRT station. This procedure was removed after the train collision at Joo Koon as trains terminated at Joo Koon. The new signalling system became fully operational on 28 May 2018.<ref name=":0" />

Platform screen doors

When the line was first opened, full-height platform screen doors supplied by Westinghouse were installed at underground stations. These doors serve to prevent suicides, enable climate control within the station, better security control by restricting access to the tunnels and tracks and for overall passenger safety considerations.<ref>Westinghouse Platform Screen Doors – Completed Projects Template:Webarchive</ref> The authorities initially rejected calls for platform screen doors to be installed at elevated stations by casting doubts over functionality and concerns about the high installation costs.<ref name="doublerail2">Template:Cite press release</ref> Nevertheless, the LTA reversed its decision and made plans to install half-height platform screen doors on elevated stations on 25 January 2008.<ref>Template:Cite news</ref><ref name="raymondspeech">Template:Cite press release</ref> The first platform screen doors by ST Electronics were installed at Pasir Ris, Jurong East and Yishun stations in 2009 as trial runs.<ref name="stplatformdoorselevated2">Template:Cite news</ref> Subsequently, installation began in May 2011 at Ang Mo Kio station on the North–South Line. On 14 March 2012, platform screen doors became operational at all elevated stations on the East–West Line.<ref name=":22">Template:Cite news</ref> Stations along the TWE had half-height platform screen doors manufactured by Fangda installed during the station's construction.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The line's Changi Branch is featured in tvN series Little Women.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>