Jurong East MRT station
Template:Short description {{#invoke:Hatnote|hatnote}} Template:Good article Template:EngvarB Template:Use dmy dates Template:Infobox station
Jurong East MRT station is an elevated Mass Rapid Transit (MRT) interchange station on the North–South (NSL) and East–West (EWL) lines in Jurong East, Singapore. Situated along Jurong Gateway Road, the station is located within the vicinity of Jem, Westgate, IMM, Ng Teng Fong General Hospital, Jurong East Bus Interchange and Jurong Town Hall Bus Interchange. The station is operated by SMRT Trains.
The station opened on 5 November 1988 as part of the MRT extension to Lakeside. The station was the terminus of the Branch line which later merged into the NSL. Through the Jurong East Modification Project, an additional track and platform were built in 2011 to improve train frequencies on the NSL. In May 2018, it was announced that the station would be an interchange with the Jurong Region Line (JRL) when the second stage opens in 2028. The station is planned to be integrated into the Jurong East Integrated Transport Hub – an integrated civic, retail and commercial complex.
History
North–South and East–West lines
The station, initially named Jurong Town, was announced in October 1983 to be built as part of Phase II of the initial MRT system.<ref>Template:Cite newsTemplate:Cbignore</ref><ref>Template:Cite newsTemplate:Cbignore</ref> Initially expected to be completed by 1992, the completion date of Phase II was pushed earlier to 1990.<ref>Template:Cite newsTemplate:Cbignore</ref><ref name=":3">Template:Cite newsTemplate:Cbignore</ref> The station would be part of the Phase II MRT segment from Clementi to Lakeside.<ref name=":3" /><ref>Template:Cite newsTemplate:Cbignore</ref>
The contract for the construction of Jurong station was awarded to a joint venture between Jurong Engineering and JDC Corporation in October 1985. The S$79.58 million contract (US$Template:To USD million in Template:Inflation/yearTemplate:Inflation/fn<ref name="IMF">Template:Cite web</ref>) also included the construction of Template:Convert of viaducts and the Ulu Pandan Depot.<ref>Template:Cite newsTemplate:Cbignore</ref> In November that year, the contract for the construction of viaducts from this station to Lakeside was awarded to a joint venture between Aoki Corporation and Lim Kah Ngam Construction for S$64.75 million (US$Template:To USD million in Template:Inflation/yearTemplate:Inflation/fn<ref name="IMF"/>). The contract included the construction of the Chinese Garden and Lakeside stations.<ref>Template:Cite newsTemplate:Cbignore</ref> In 1988, Communications Minister Yeo Ning Hong proposed allowing people to set up discos in the station to increase the station's vibrancy.<ref>Template:Cite newsTemplate:Cbignore</ref>
Jurong Town station was renamed to Jurong in September 1984,<ref>Template:Cite newsTemplate:Cbignore</ref> and to Jurong East in March 1987.<ref name="Jurong MRT names">Template:Cite newsTemplate:Cbignore</ref><ref>Template:Cite newsTemplate:Cbignore</ref> As announced by MRT Corporation chairman Michael Fam on 10 March 1988,<ref>Template:Cite newsTemplate:Cbignore</ref> Jurong East station opened on 5 November that year.<ref>Template:Cite newsTemplate:Cbignore</ref><ref>Template:Cite newsTemplate:Cbignore</ref> An opening ceremony was held at the station to inaugurate the Template:Convert MRT extension to Lakeside station, attended by Yeo and Members of Parliament of the surrounding constituencies.<ref>Template:Cite newsTemplate:Cbignore</ref><ref>Template:Cite web</ref>
The station was the terminus for train services to Choa Chu Kang station when the Branch line opened on 10 March 1990.<ref>Template:Cite newsTemplate:Cbignore</ref><ref name="special shuttle">Template:Cite newsTemplate:Cbignore</ref> The Branch line was later incorporated into the North–South Line (NSL) with the Woodlands Extension on 10 February 1996.<ref name=":0">Template:Cite web</ref><ref name=":1">Template:Cite newsTemplate:Cbignore</ref>
Jurong East Modification Project and other upgrades
In July 2008, the Land Transport Authority (LTA) announced the Jurong East Modification Project (JEMP), which involved the construction of a new platform and tracks to increase train frequency for the NSL. At the time, NSL trains could only terminate at the middle platform of the station.<ref>Template:Cite web</ref><ref>Template:Cite newsTemplate:Cbignore</ref> The contract for the construction of the new platform and viaducts was awarded to Sato Kagyo Pte Ltd in September 2008.<ref>Template:Cite web</ref><ref>Template:Cite web</ref>
Originally projected to be completed in 2012, Transport Minister Raymond Lim announced on 12 February 2009 that the completion date of the JEMP was brought forward by a year to 2011.<ref>Template:Cite news</ref> To facilitate turnout installation works, train services between Jurong East and Clementi were suspended from 4 to 5 September 2010<ref>Template:Cite web</ref> and subsequently between Jurong East and Bukit Batok from 18 to 19 September.<ref>Template:Cite web</ref><ref>Template:Cite web</ref>
As announced on 16 May 2011, operations of the new platform commenced on 27 May that year.<ref name="LTA new platform">Template:Cite web</ref><ref>Template:Cite web</ref><ref>Template:Cite news</ref> The new platform initially operated only during weekday morning peak hours, but from 27 December, it also began operating during weekday evening peak hours.<ref name="CNA new platforms">Template:Cite web</ref><ref>Template:Cite web</ref>
On 25 January 2008, Minister Lim announced the installation of half-height platform screen doors on elevated stations to improve safety on elevated stations.<ref>Template:Cite news</ref><ref name="raymondspeech2">Template:Cite press release</ref> Jurong East station was among the first stations to have the screen doors installed as part of the pilot project carried out in 2009.<ref name="Platform">Template:Cite web</ref><ref name="x706">Template:Cite web</ref> High-volume low-speed fans were installed at the station between 2012 and 2013.<ref>Template:Cite news</ref> Noise barriers were installed along the viaduct stretch from Jurong East Central to Jurong East Street 13 as part of a S$17 million (US$Template:ToUSD million) contract awarded to CKT Thomas Pte Ltd in January 2015.<ref>Template:Cite web</ref><ref>Template:Cite web</ref> Another set of noise barriers from Boon Lay Way to Jurong East Avenue 1 were installed from 2018 to 2020.<ref name="LTA 2018 s523">Template:Cite web</ref><ref>Template:Cite web</ref>
As part of a joint emergency preparedness exercise by the LTA and train operator SMRT trains, security screenings were held at this station on 5 April 2019.<ref name="o251">Template:Cite web</ref> Metal detectors and X-ray machines were deployed for the screening of commuters and their belongings during the exercise. Such exercises were conducted to test established response protocols and maintain vigilance for quicker and more effective responses during emergencies and heightened security situations.<ref>Template:Cite web</ref><ref name="k618">Template:Cite web</ref> The exercise saw the first deployment of the Human Security Radar – a fully automatic walk-through system with the ability to screen through a crowd for suspicious items.<ref name="t562">Template:Cite web</ref>
Jurong Region Line
As part of feasibility studies in the 1990s for building future LRT lines in Singapore, the LTA considered building an LRT system in the Jurong area.<ref>Template:Cite newsTemplate:Cbignore</ref><ref>Template:Cite web</ref><ref>Template:Cite news</ref> While the Jurong Region Line (JRL) was first announced on 23 October 2001,<ref>Template:Cite web</ref><ref>Template:Cite news</ref> the project was put on hold.<ref>Template:Cite web</ref> The JRL was included as part of the 2013 Land Transport Masterplan announced by transport minister Lui Tuck Yew in January that year.<ref name=":02">Template:Cite web</ref>
On 9 May 2018, the LTA announced that Jurong East station would interchange with the proposed Template:Convert JRL.<ref name="Lim 2018">Template:Cite news</ref> The JRL station would be constructed as part of Phase 2 (JRL East), a branch line consisting of seven stations branching from Tengah to Pandan Reservoir. Phase 2 was expected to be completed in 2027.<ref name="LTA 2021">Template:Cite web</ref><ref>Template:Cite web</ref> However, the restrictions on construction due to the COVID-19 pandemic have led to delays, with the completion date pushed to 2028.<ref>Template:Cite web</ref>
The contract for the design and construction of Jurong East JRL station and associated viaducts was awarded to Daelim Industrial Co. Ltd for S$197.4 million (US$Template:ToUSD million) in February 2020.<ref>Template:Cite web</ref><ref>Template:Cite web</ref><ref>Template:Cite web</ref> In addition, the contract for the construction of the Jurong East Integrated Transport Hub was awarded to China Communications Construction Company Limited (Singapore Branch) for S$447.4 million (US$Template:ToUSD million) in February 2021.<ref name="c024">Template:Cite web</ref><ref name="l930">Template:Cite web</ref>
To facilitate the construction of the JRL station, the Jurong East Bus Interchange was relocated on 6 December 2020 to a new site along Jurong Gateway Road. A sheltered pedestrian bridge was built to connect the MRT station to the temporary bus interchange, which was to operate until the completion of the Jurong East Integrated Transport Hub in 2027.<ref name="LTA 2020 Jurong">Template:Cite web</ref><ref name="Tan 2020">Template:Cite news</ref><ref name="CNA 2020">Template:Cite web</ref> A temporary protection enclosure was installed over the NSL and EWL tracks to prevent debris from falling on the tracks during construction works. To control the movements of the MRT viaduct superstructure and transfer loads to the columns and piles, the existing bearings at the viaducts were replaced.<ref>Template:Cite web</ref>
The Hub Plaza of Jurong East station had to be reconstructed. The escalator and staircase leading to the Hub Plaza were closed on 18 December 2022 with new temporary linkways constructed to connect to Exit A of the station.<ref>Template:Cite web</ref> A defunct coin lift, which was used to transport coins for the old Transitlink ticketing system, had to be demolished for a new staircase.<ref>Template:Cite web</ref> On 1 June 2025, a set of faregates was relocated closer to Exit B.<ref>Template:Cite web</ref><ref>Template:Cite web</ref>
Details
Jurong East station is an interchange station on the North–South (NSL) and East–West (EWL) lines. The station is the terminus of the NSL with the adjacent station being Bukit Batok station. On the EWL, the station is between the Clementi and Chinese Gardens stations. The official station code is NS1/EW24.<ref name="LTA system map">Template:Cite web</ref> When it opened, it had the station code of W9<ref>Template:Cite news</ref> before it was changed to its current station code in August 2001 as a part of a system-wide campaign to cater to the expanding MRT System.<ref>Template:Cite news</ref><ref>Template:Cite web</ref> Being part of the NSL and EWL, the station is operated by SMRT Trains.<ref name="LTA getting around">Template:Cite web</ref> Jurong East station is planned to be a future interchange with the JRL located between the Template:MRT Station and Template:MRT Station stations.<ref>Template:Cite web</ref>
The station is located along Jurong Gateway Road near the junction with Venture Avenue.<ref name="o605">Template:Cite web</ref> Surrounding landmarks of the station include Jurong East Bus Interchange, Jem, Westgate, IMM, the JTC Summit, Ng Teng Fong General Hospital, CPF Jurong Building and Jurong Regional Library,<ref name="z205">Template:Cite web</ref> which are connected to the station via J-Walk, an elevated pedestrian network.<ref name="r972">Template:Cite web</ref><ref>Template:Cite web</ref> Jurong East station is also near the Jurong Town Hall Bus Interchange.<ref name="g541">Template:Cite web</ref><ref name="d264">Template:Cite web</ref> The station is planned to be integrated with the Jurong East Integrated Transport Hub, which will include the new offices of the Ministry of Transport and the LTA,<ref name="l930" /> community and civic institutions, an office tower and a bus interchange.<ref name="c024" />
Jurong East station was designed by Scott Danielson of Parsons Brinckerhoff,<ref>Template:Cite newsTemplate:Cbignore</ref> who took inspiration from the adjacent Jurong East Bus Interchange and designed the space-frame roof of the station – a geometric pattern of cylindrical steel tubes connected by ball joints and topped with a flat lid.<ref>Template:Cite newsTemplate:Cbignore</ref> The new platform and tracks of the JEMP were integrated into the station design.<ref name="c733">Template:Cite web</ref> Jurong East is a three-level station with three island platforms and four tracks.<ref>Template:Cite web</ref><ref>Template:Cite web</ref><ref>Template:Cite web</ref> When the Jurong East Integrated Transport Hub designed by Aedas is completed,<ref name="d258">Template:Cite web</ref> a Template:Convert link bridge over the tracks will connect the two buildings flanking the station.<ref>Template:Cite web</ref> The JRL station will have a stacked platform configuration.<ref>Template:Cite web</ref><ref name="J102">Template:Cite sign</ref><ref name="o264">Template:Cite web</ref>
As part of SMRT's heritage-themed artwork showcase Comic Connect, the station features A Journey Through Jurong East by students from the School of the Arts.<ref name=":2">Template:Cite web</ref> The mural showcases the Jurong Bird Park, Jurong Town hall, Jurong River, and the Jurong Drive-in Cinema.<ref>Template:Cite web</ref> In order to create the mural, the students researched the area's history, ecology, and culture.<ref name=":2" />