The North–South Line (NSL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore. Operated by SMRT Corporation, it is coloured red on the rail map, with the line Template:Convert long and serving 27 stations,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> 11 of which, between Braddell and Marina South Pier stations, are underground. It runs from Jurong East station in the west of the country to Marina South Pier in the city-centre via Woodlands station in the north. The line operates for almost 20 hours a day (from approximately 5am to 1am the next day), with headways of 1 to 2 minutes during peak hours and 5 to 6 minutes during off-peak hours. All the trains on the NSL run with a six-car formation.

Commenced on 22 October 1983, it was the first MRT line to be built in Singapore. The inaugural section from Yio Chu Kang station to Toa Payoh station began service on 7 November 1987, followed by an extension southwards to Raffles Place station on 12 December that same year and northwards to Yishun station on 20 December 1988. After the southern extension to Marina Bay station opened on 4 November 1989, the NSL was formed and split from the East–West Line (EWL). During the 1990s, the Branch Line was extended northwards towards Woodlands, before turning south to Yishun where it became part of the NSL.

With ageing infrastructure of the NSL being the oldest and heavily utilised MRT line, significant improvements have been made since the 2010s. They include the replacement of sleepers, third rail and the introduction of new rolling stocks, the C151B, C151C and R151, gradually superseding the older rolling stocks and increasing passenger capacity. Other recent developments of the line include a new extension to Marina South Pier station on 23 November 2014 and a new infill station, Canberra station, on 2 November 2019. The NSL is also the first line to have undergone a major re-signalling project, converting it from semi-automatic to fully automated operations in 2019. Two more infill stations, Brickland and Sungei Kadut stations, have been planned and are set to be opened in the 2030s.

History

Initial developments

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} Template:Stack The Mass Rapid Transit (MRT) originated from a forecast in 1967 by the planners of the State and City Planning Project,<ref>Template:Cite news</ref> which stated the need for a rail-based urban transport system in Singapore by 1992.<ref>Template:Cite book</ref><ref name=journey1>Template:Cite book</ref>Template:Rp<ref>Template:Cite report</ref> Following a debate on whether a bus-only system would be more cost-effective, then-Minister for Communications Ong Teng Cheong came to the conclusion that an all-bus system would be inadequate, as it would have to compete for road space in the land-scarce country.<ref name=ltahistory>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name=ongcna>Template:Cite news</ref>

After deciding on a rail-based system, the construction of Phase I of the MRT system,<ref>Template:Cite news</ref> which will be the North–South Line, was given priority as the line passes through areas having a higher demand for public transport, such as the densely populated housing estates of Toa Payoh and Ang Mo Kio and the Central Area. The line was expected to relieve the traffic congestion on the Thomson–Sembawang road corridor.<ref>Template:Cite book</ref><ref>Template:Cite news</ref> Construction of the MRT line (and also the MRT system itself) started on 22 October 1983,<ref>Template:Cite news</ref> and the first section from Yio Chu Kang station to Toa Payoh station opened on 7 November 1987.<ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> At the inauguration ceremony, Ong Teng Cheong, who backed and commissioned the planning of the MRT system, attended the ceremony as a special Guest of Honour. Dr Yeo Ning Hong, the Minister For Communications and Information, inaugurated the start of MRT operations and announced it to be the "beginning" of the MRT system.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Nine more stations from Novena station to Outram Park station via Raffles Place opened on 12 December that year.<ref>Template:Cite news</ref> The line was extended northward to Yishun station on 20 December 1988 as part of phase 2B<ref>Template:Cite news</ref> and it began independent operations on 4 November 1989 as the North–South Line when the extension to Marina Bay station was opened.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>

Woodlands extension

Template:Quote box

After the Branch Line (from the Jurong East to Choa Chu Kang stations) opened in 1990, the Woodlands MRT line was envisioned so as to close the gap between Yishun and Choa Chu Kang stations.<ref>Template:Cite news</ref><ref name=":0">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref> Numerous changes were made to the number of stations for the extension mainly to accommodate the 1991 Concept Plan by the Urban Redevelopment Authority,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> which aimed to make Woodlands a regional centre for northern Singapore.<ref>Template:Cite book</ref>

During the initial planning of the line, Sembawang station was only intended as a provisional station, to be built at a later date due to the underdevelopment of Sembawang, and construction began on 19 November 1992.<ref>Template:Cite news</ref> Sembawang station<ref>Template:Cite news</ref> and Kranji station<ref name="Kranji MRT station">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> were later included in the construction after the second round of planning (construction began at the same time on 19 November 1992) and Sungei Kadut station was then omitted. Sungei Kadut will be built later if the town's population justifies the necessity for the station.<ref>Template:Cite news</ref>

During the construction, a total of 19 new trains were purchased for almost S$259 million for the new MRT line, designed by German company Siemens Aktiengesellschaft, to complement the 66 first-generation C151 trains. There was also a need to level the land covered in thick vegetation in Kadut, Woodlands and Sembawang for the MRT line.<ref>Template:Cite news</ref>

With the official opening of the Woodlands extension on 10 February 1996 by then Prime Minister Goh Chok Tong, the Branch Line was incorporated into the North–South Line.<ref name=":0" /> The extension was built at a cost of $1.2 billion.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Subsequent developments

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}

Canberra MRT station.

The NSL platforms of the Bishan station underwent major alterations to increase the passenger capacity of the station from 1,250 to 2,020. A new air-conditioned platform to serve southbound trains then to Marina Bay was constructed and opened for service on 27 July 2008, connected to Junction 8 via Exit E. The station was expanded to handle increased passenger traffic when the CCL station opens.<ref>Template:Cite news</ref> As the original platform, now serving northbound trains to Jurong East, remained in service, upgrading works for the platform (Platform A) was hindered and took about a year to complete. While the re-tiling of the platform was done during the day, the Platform Screen Doors (PSDs) were installed in sections through the night. An air-conditioning system was also installed as part of the upgrade. Upgrading works for the platform were fully completed on 23 May 2009.<ref>Template:Cite news</ref>

Under the Land Transport Master Plan 2008, the Jurong East Modification Project entailed the construction of a new platform and the addition of a fourth track to Jurong East station to reduce waiting times and crowding at the station during peak hours.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The modification project was completed on 27 May 2011.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The track and platform was initially opened during morning peak hours only, but since December 2011, they also operate during the evening peak hours.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In the 2008 Land Transport Master Plan, the Template:Convert North–South Line extension was announced as one of the upcoming projects rolled out by the Land Transport Authority to expand Singapore's rail network.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The one kilometre extension from Marina Bay to Marina South Pier station was opened on 23 November 2014.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> This extension serves the Marina South Pier, the Marina Bay Cruise Centre Singapore, and future developments in the Marina Bay Downtown area.<ref name=":1">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

On 17 January 2013, the Land Transport Authority (LTA) announced that a feasibility study was conducted to construct Canberra MRT station.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The feasibility study was completed in 2014 and LTA announced Canberra as a new station.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Construction of Canberra station commenced on 26 March 2016.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The station, which is an infill station with side platforms, was built along an operational section of the line between Sembawang and Yishun. The station cost S$90 million to build,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and is meant to serve upcoming developments at the vicinity. Canberra station opened on 2 November 2019.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Incidents

On 3 March 2003, a 23-year-old man lost control of his vehicle along Lentor Avenue, crashed through the fence, and landed on a stretch of track between Yio Chu Kang and Khatib stations. The incident forced a train carrying hundreds of commuters to come to a screeching halt, but not before flattening the front of the car. The accident disrupted train services for more than three hours and cost SMRT between S$100,000 and $150,000 in damages and lost revenue.<ref>Template:Cite news</ref>

On 15 December 2011, train services between Bishan and Marina Bay stations were disrupted due to damage sustained on the power rail between City Hall and Dhoby Ghaut. Trains along this stretch were stalled and caused a service disruption until 11:40Template:Nbsppm on that day.<ref>Template:Cite news</ref><ref name="S2nd Update – SMRT statement : Service disruption on North–South Line (Northbound): Marina Bay Station to Bishan Station">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Two days later, a similar problem caused a seven-hour disruption between Ang Mo Kio and Marina Bay.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> According to SMRT, the disruption was caused by damage to the third rail and the trains' collector shoes. Seven trains were damaged in this incident.<ref name="Service disruption on North–South Line on 17 Dec 2011">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> These two service disruptions on the North–South line were both related to damaged rail, and became one of the worst disruption since SMRT's inception in 1987.<ref>Template:Cite news</ref>

On 7 July 2015, train services on the North–South and East–West lines were temporarily disrupted due to massive power trips detected along both lines. A cause of the disruption was due to damaged insulators which caused a failure to properly supply power.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="Tan 2015">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="TODAYonline 2015">Template:Cite news</ref><ref>Template:Cite news</ref> For this disruption that brought inconvenience to 413,000 commuters, LTA imposed a 'record' fine of S$5.4 million on SMRT.<ref>Template:Cite news</ref>

On 7 October 2017, a 20-hour long disruption started due to flooding in the tunnels between Braddell station and Bishan station due to a faulty drainage system, resulting in disruption of train services between Ang Mo Kio and Marina South Pier stations in both directions for several hours. A trackside fire between Raffles Place and Marina Bay stations further exacerbated the disruption. Train services between Marina South Pier and Newton resumed at about 9:20Template:Nbsppm on the same day, followed by Newton and Ang Mo Kio at around 2Template:Nbsppm the following day.<ref>Template:Cite news</ref> Although no injuries or casualties were reported, SMRT fired a total of eight employees from the maintenance crew, and incurred a S$2 million fine, following the incident.<ref>Template:Cite news</ref>

On 14 October 2020, train services from Jurong East to Woodlands stations were disrupted for more than three and a half hours, owing to a faulty power cable, which affected the East–West Line and Circle Line too. The power fault began at 7Template:Nbsppm and by 7:30Template:Nbsppm, commuters were stuck in the trains. Free bus bridging services were activated at all affected stations, and bus operators increased the frequency of regular services serving these areas. Service resumed at all stations along the North–South and East–West Lines at 10:35Template:Nbsppm.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> A total of 36 stations were affected by the power fault.<ref name=":4">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The incident led to a replacement of 150km of power cables for the Tuas West Extension and two SMRT staff being suspended.<ref name=":4" />

On 27 October 2023, trains skipped Novena MRT station for about 2 hours during the evening travel peak, after an air-conditioning unit filled the underground station with smoke. Free bus bridging services were provided between Newton MRT station and Toa Payoh MRT station, and ended shortly after the station was reopened at around 7:30pm.<ref>Template:Cite news</ref>

On 3 June 2024, around 5.50pm, a lightning strike caused traction power to trip, as well as a small fire breaking out in a power control box next to the train track located about 20 meters from the platform of Kranji MRT station. No injuries were reported. This resulted in train services to be suspended between Choa Chu Kang and Woodlands stations for more than two hours. According to the Singapore Civil Defence Force, the fire had burned itself out before its officers arrived. Train services were progressively restored at 8.10pm.<ref>Template:Cite news</ref>

Future plans

Locator maps of Brickland and Sungei Kadut stations

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}

In the Land Transport Master Plan 2040 (LTMP2040), two new infill stations are projected to be built along the existing North–South Line. Brickland station will be built between Bukit Gombak and Choa Chu Kang stations, while Sungei Kadut station will be built between Yew Tee and Kranji stations and provide an additional interchange with the Downtown Line. Both stations are expected to be completed by around mid-2030s.<ref name="LTMP2040 Sungei">Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="LTMP2040">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="LTMP2040_today">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Network and operations

Services

Train services on the North–South Line operates from approximately 5:30Template:Nbspam to around midnight daily. In general, during peak hours, train frequency is 2 to 3 minutes while during non-peak hours the frequency is reduced to 5 minutes throughout the entire route.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Each day, the first train begins service at the following timings:

  • 4:59 am (5:19 am on Sundays and public holidays) from Jurong East to Yew Tee stations, which will reach one loop at 5:27 am.
  • 5:00 am (5:22 am on Sundays and public holidays) from Ang Mo Kio to Yew Tee stations, which will reach Yew Tee at 5:33 am.
  • 5:05 am (5:25 am on Sundays and public holidays) from Jurong East to Ang Mo Kio stations, which will reach Ang Mo Kio at 5:48 am.
  • 5:10 am (5:30 am on Sundays and public holidays) from Ang Mo Kio as downroute to start at Bishan station, which will reach Bishan at 5:45 am.

Extra downroute trips were added to start from Newton, Bishan and Kranji to cater to the demand. From 11pm onwards, selected trains from Jurong East station will terminate at either Ang Mo Kio, Toa Payoh or Yew Tee stations.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Selected trains departing from Marina South Pier station will also terminate at Kranji, Yishun or Ang Mo Kio stations in the late evenings. There are no express services.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Additionally, short-working trips do run from Yishun to Marina South Pier, which only operate during peak hours.

In the late 2010s, services on the North–South Line were also subjected to maintenance and renewal works, usually on selected Fridays, Saturdays or Sundays, with shuttle bus services occasionally provided throughout the duration of the early closures and late openings for affected commuters.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Operations of the North–South Line were affected by the COVID-19 pandemic, leading to the drop in ridership.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Route

Geographically accurate map of the North–South MRT line.

The North–South line forms an incomplete loop from Jurong East in the West Region of Singapore, north to Woodlands and Sembawang, and south to the Central Area.<ref name="NSL LTA"/> It is Template:Convert long and is predominantly double-tracked, but certain short sections at the Woodlands, Yishun and Ang Mo Kio stations widen to three tracks,<ref>Template:Cite map</ref><ref>Template:Cite map</ref><ref>Template:Cite map</ref> and four tracks at Jurong East station.<ref>Template:Cite map</ref> The line begins above ground at Jurong East station<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="LTA system map">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> from where it continues north on a set of elevated viaducts, with the exception of a short tunnel between the Bukit Batok and Bukit Gombak stations,<ref>Template:Cite map</ref> and a surface section of track between the Bukit Gombak and Choa Chu Kang stations.<ref>Template:Cite map</ref> The line curves from the Yew Tee to Kranji stations and continues eastwards, paralleling Woodlands Avenue 3 (which the line briefly cuts underneath between Kranji and Marsiling stations)<ref>Template:Cite map</ref> and Avenue 7 main roads.<ref>Template:Cite map</ref>

After Sembawang station, the line follows the route of Canberra Link and Yishun Avenue 2, curving southwards. Between Khatib and Yio Chu Kang stations parallel to Lentor Avenue, the line continues at surface level; this section is the longest distance between any two MRT stations in Singapore.<ref>Template:Cite map</ref> The line continues above ground for the Yio Chu Kang and Ang Mo Kio stations, then it goes back to surface level for Bishan station, the MRT system's only at-grade station. A branch line to Bishan Depot exists between the Ang Mo Kio and Bishan stations.<ref>Template:Cite map</ref> After Bishan, the line goes underground through the Central Area. The North–South Line runs parallel to the East–West Line at the City Hall and Raffles Place stations, which are also cross-platform interchanges to the East–West Line. The line ends at Marina South Pier station.<ref name="LTA system map"/>

Stations

The line serves 27 MRT stations across Template:Convert of track, and station codes for the line are red, corresponding to the line's colour on the system map.<ref name="NSL LTA">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="NSL ext">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> 11 stations, from Braddell to Marina South Pier are underground, with the rest being ground-level or elevated.<ref>Template:Cite book</ref> With the exception of Bishan, Braddell and Canberra stations, the other stations have island platforms.

North–South Line Stations Timeline
Date Project Description
7 November 1987 Phase 1 Yio Chu KangToa Payoh
12 December 1987 Toa PayohOutram Park (Direct train service to Outram Park via Raffles Place)
12 March 1988 Phase 1A Outram ParkClementi (Now part of the East–West Line)
5 November 1988 Phase 1B ClementiLakeside (Now part of the East–West Line)
20 December 1988 Yio Chu KangYishun
4 November 1989 Phase 2A Raffles PlaceMarina Bay (Separation of the North–South Line & East–West Line)
10 March 1990 Phase 2B Jurong EastChoa Chu Kang (Operates as a branch line from Jurong East)
10 February 1996 Woodlands Extension Choa Chu KangYishun
23 November 2014 North–South Line Extension Marina BayMarina South Pier
2 November 2019 Canberra Station Canberra station between Sembawang and Yishun
2034 Future infill stations between existing stations Brickland station between Bukit Gombak and Choa Chu Kang
2035 Sungei Kadut station between Yew Tee and Kranji

Legend


Elevated
 
Line terminus

Transfer outside paid area

Ground-level

Wheelchair accessible
File:Bus-logo.svg
Bus interchange
File:Aiga escalator down.svg
Underground
File:ISO 7010 W003.svg
Civil Defence Shelter
File:Aiga carrental cropped.svg File:BSicon Mono-CHN.svg File:BSicon AETRAM.svg File:Aiga watertransportation.svg File:20 airtransportation.svg File:Aiga immigration.svg
Other transportation modes

List

scope="col" style="color: white; background:#Template:Rcr" | Station code scope="col" style="color: white; background:#Template:Rcr" | Station name scope="col" style="color: white; background:#Template:Rcr" | Images scope="col" style="color: white; background:#Template:Rcr" | Interchange;
Adjacent transportation
scope="col" style="color: white; background:#Template:Rcr" | Opening scope="col" style="color: white; background:#Template:Rcr" | Cost
Template:SMRT code Jurong East File:Jurong East MRT Station NSL 2.jpg Template:Rbox
Template:Rbox (2028)

File:Bus-logo.svgJurong East
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} S$5 billion
Template:SMRT code Bukit Batok File:Bukit Batok MRT Station 202407.jpg File:Bus-logo.svgBukit Batok {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:SMRT code Bukit Gombak File:Bukit Gombak MRT Station.jpg rowspan="2"Template:Sdash
Template:SMRT code Brickland Template:CNone {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} Template:TBA
Template:SMRT code Choa Chu Kang File:Choa Chu Kang MRT Station 202407.jpg Template:Rbox
Template:Rbox (2027)

File:Bus-logo.svgChoa Chu Kang
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} S$5 billion
Template:SMRT code Yew Tee File:Yew Tee MRT Station 202407.jpg Template:Sdash {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} citation CitationClass=web

}}</ref>

Template:SMRT code Sungei Kadut Template:CNone Template:Rbox (2035) {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} Template:TBA
Template:SMRT code Kranji File:Kranji MRT Station.jpg rowspan="2"Template:Sdash {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} S$1.2 billion<ref>{{#invoke:citation/CS1|citation CitationClass=web

}}</ref>

Template:SMRT code Marsiling File:Marsiling MRT Station.jpg
Template:SMRT code Woodlands File:Woodlands MRT Station 202407.jpg Template:Rbox

File:Bus-logo.svgWoodlands
File:Bus-logo.svgWoodlands Temporary
Template:SMRT code Admiralty File:Admiralty MRT Station.jpg Template:Sdash
Template:SMRT code Sembawang File:Sembawang MRT Station.jpg File:Bus-logo.svgSembawang
Template:SMRT code Canberra File:Canberra MRT Station 2.jpg Template:Sdash {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} citation CitationClass=web

}}</ref>

Template:SMRT code Yishun File:Yishun MRT Station 202407.jpg File:Bus-logo.svgYishun {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} S$5 billion
Template:SMRT code Khatib File:Khatib MRT Station.jpg Template:Sdash
Template:SMRT code Yio Chu Kang File:Yio Chu Kang MRT Station 202407 2.jpg File:Bus-logo.svgYio Chu Kang {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:SMRT code Ang Mo Kio File:Ang Mo Kio MRT Station.jpg Template:Rbox (2030)

File:Bus-logo.svgAng Mo Kio
Template:SMRT code Bishan File:Bishan MRT Station.jpg Template:Rbox

File:Bus-logo.svgBishan
Template:SMRT code Braddell File:Braddell MRT Station 202407.jpg Template:Sdash
Template:SMRT code Toa Payoh File:Toa Payoh MRT Station 202407.jpg File:Bus-logo.svgToa Payoh
Template:SMRT code Novena File:Novena MRT Station 202407.jpg Template:Sdash {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:SMRT codeTemplate:SMRT code Newton File:Newton MRT Station 202407.jpg Template:RboxError creating thumbnail:
Template:SMRT code Orchard File:Orchard MRT Station 202407.jpg Template:Rbox
Template:SMRT code Somerset File:Somerset MRT Station 202407 2.jpg Template:Sdash
Template:SMRT code Dhoby Ghaut File:Dhoby Ghaut MRT Station 202407 2.jpg Template:Rbox
Template:Rbox
Template:SMRT code City Hall File:City hall MRT Station.jpg Template:Rbox
Template:SMRT code Raffles Place File:Raffles Place MRT Station 202407.jpg
Template:SMRT code Marina Bay File:Marina Bay MRT Station 202407.jpg Template:Rbox
Template:Rbox
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:SMRT code Marina South Pier File:Marina South Pier MRT Station 202407.jpg File:Aiga watertransportation.svgMarina South PierFile:Aiga immigration.svg
File:Aiga watertransportation.svgMarina Bay Cruise CentreFile:Aiga immigration.svg
{{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }} citation CitationClass=web

}}</ref>

Depots

scope="col" style="color: white; background:#Template:Rcr" | Depot name;
Lines
scope="col" style="color: white; background:#Template:Rcr" | Location scope="col" style="color: white; background:#Template:Rcr" | Image scope="col" style="color: white; background:#Template:Rcr" | Line-specific
stabling capacity
scope="col" style="color: white; background:#Template:Rcr" | Cost scope="col" style="color: white; background:#Template:Rcr" | Opening
Template:Rbox Bishan File:NSL Bishan MRT Depot 20201013 183038.jpg 59 trains S$300 million {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}
Template:Rbox
Template:Rint
Jurong East File:Ulu Pandan Depot.jpg 45 trains S$130 million {{safesubst:#invoke:Check for unknown parameters|check|unknown=|preview=Page using Template:Center with unknown parameter "_VALUE_"|ignoreblank=y| 1 | style }}

Infrastructure

Rolling stock

Template:Multiple image

Electric Multiple Unit (EMU) trains on the North–South Line operate in a six-car formation, based out of Bishan Depot and Ulu Pandan Depot, which provide train maintenance, inspection and overhaul facilities.<ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref name=":3">Template:Cite news</ref> This rolling stock is shared with the East–West Line, with an electrification of 750 V DC powered by a third rail. With the exception of the C651 and R151 trains, the current rolling stock was manufactured by Kawasaki Heavy Industries, in a joint venture with CRRC Qingdao Sifang for the subsequent rolling stocks of the C151A, C151B and C151C trains.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> When the initial line opened, the rolling stock of the North–South Line consisted of 66 first-generation C151 trains only. The 19 second-generation C651 trains were introduced during the Woodlands extension to complement the existing 66 first-generation C151 trains.<ref>Template:Cite news</ref> The 21 third-generation C751B trains were introduced during the Changi Airport extension to complement the existing 66 first-generation C151 trains and 19 second-generation C651 trains.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2011, the fourth-generation C151A trains were introduced, increasing the passenger capacity of both the North–South and East–West lines by 15%.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The C151A trains were the first successful joint venture between Kawasaki Heavy Industries and CSR Qingdao Sifang in the international market.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

As part of efforts to further increase passenger capacity on the line, newer C151B and C151C trains were subsequently delivered in 2017 and 2018 respectively.<ref name="Sundays">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The introduction of the C151B trains saw the introduction of STARiS 2.0, which is also seen in subsequent rolling stocks.<ref name="SMRT press">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The C151C trains are also the first MRT rolling stock on the NSEWL to be fitted with tip-up seats, in addition to the current features of the C151B trains.<ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Another generation of rolling stock, the R151 trains, will be delivered from 2022 to 2026, to replace all 66 first-generation C151 trains which were fully retired in 2025, as well as all 19 second-generation C651 and 21 third-generation C751B trains which were fully retired in 2024. The R151 trains will be the first rolling stock on the North–South Line to be manufactured by Bombardier Transportation (Bought by Alstom in 2021), which has also supplied trains for the Downtown Line.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref><ref>Template:Cite news</ref>

Signalling

Initially, the North–South line used a semi-automatic signalling system consisting of the Westinghouse fixed block signalling system with automatic train control under automatic train operation Grades of Automation (GoA) 2.<ref name="Westinghouse FS2K">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> However, the ageing system had undermined the rail reliability on the line, requiring the NSL to upgrade its signalling system.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Since 2019, the North–South Line is fully equipped with Thales SelTrac Communications-based train control moving block signalling system with automatic train control under automatic train operation (ATO) GoA 3.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The subsystems consist of automatic train protection to govern train speed, NetTrac MT Automatic Train Supervision (ATS) to track and schedule trains and a Computer-based interlocking system that prevents incorrect signal and track points to be set.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

A new moving-block signalling system, supplied by Thales, replaced the ageing fixed-block signalling system on the North–South Line. The upgrading works were completed in phases from 2016. With the upgraded signalling system, trains are now able to run closer to each other.<ref name="Thales Brochure">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="North–South Line Projects">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The new system was tested on the evening of 28 March 2017. Train services were paused for ten minutes as the old signalling system was being changed to the new system.<ref name="Trial begins">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> From 16 April 2017, the new system commenced full-day testing on Sundays for two months. The new C151B rolling stock were first introduced to the line on these testing days.<ref name="LTA 2017">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Since 28 May 2017, the new signalling system has been operating full-day on the North–South Line.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The old signalling system then ceased operations on 2 January 2019.<ref name=":3" />

Platform screen doors

File:Toapayohmrtplatform.jpg
Full-height platform screen doors at Toa Payoh station.

When the line was first opened, full-height platform screen doors supplied by Westinghouse were installed at underground stations. These doors serve to prevent suicides, enable climate control within the station, better security control by restricting access to the tunnels and tracks and for overall passenger safety considerations.<ref>Westinghouse Platform Screen Doors – Completed Projects Template:Webarchive</ref> The authorities initially rejected calls for platform screen doors to be installed at elevated stations by casting doubts over functionality and concerns about the high installation costs.<ref name="doublerail">Template:Cite press release</ref> Nevertheless, the LTA reversed its decision and made plans to install half-height platform screen doors on elevated stations on 25 January 2008.<ref>Template:Cite news</ref><ref name="raymondspeech">Template:Cite press release</ref> The first platform screen doors by ST Electronics were installed at Pasir Ris, Jurong East and Yishun stations in 2009 as trial runs.<ref name="stplatformdoorselevated">Template:Cite news</ref> Subsequently, installation began in May 2011 at Ang Mo Kio station. On 14 March 2012, platform screen doors became operational at all elevated stations on the North–South Line.<ref name=":2">Template:Cite news</ref>

Rail

The NSL was built with wooden sleepers, which needed to be replaced when they neared the end of their lifespan of 15 to 25 years. The replacement sleepers, made out of concrete, have a significantly longer lifespan and enable smoother and safer rides.<ref name="SMRT blog">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Since 2014, train services on the line have ended earlier for critical maintenance works, with the exception of a break between September 2016 and December 2016.<ref>Template:Cite news</ref>

Trains on the NSL are powered via a third rail. However, constant contact between the train's Current Collector Devices (CCD) and the line saw the need for replacement works on the third rail, which were completed in August 2017.<ref name="SMRT blog"/><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The new third rail replaced its 30-year-old predecessor, which was used since the opening of the line. The new electrical system is expected to make train services more reliable.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>